ML20127M117

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to IPE Rept for Trojan Nuclear Power Plant in Response to GL 88-20. Certifies That Individual Reviews Performed to Ensure Technical Adequacy of IPE & Validation of Results
ML20127M117
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/24/1992
From: Cross J, Robinson W
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127M121 List:
References
GL-88-20, NUDOCS 9211300004
Download: ML20127M117 (2)


Text

oj. .

m . se!e y su Portland General Elatic Cornpany ,

E.

James E. Cross Vice President and Chief Nuclear Officer November 24 1992 Trojan Nuclear Plant Docket 70-344 License NPF-1 U.R. Nuclear Regulatory Conscission Attn Document Control Desk Washington DC 20555

Dear Sir:

Trojan Nuclear Plant Response to Generic Letter 88-20 Individual Plant fsamination for Severe Accident Vulnerabilities This letter transmits the enclosed Individual Plant Examination (IPE)

Report for the Trojan Nuclear Plant in response to Generic Letter 88-20.

Portland General Electric Company (PGE) certifies that the IPE has been completed and documented as reluested by the Generic Letter. PGE also certifies that independent reviews have been performed to ensure the technical adequacy of the IPE and validation of the results. The Trojan IPE includes a Level I Coro Damage Frequency Analysis and a Level II Containment Performance Analysis.

The Trojan IPE Report shows no core damage vulnerabilities or unusually poor Containment performance.

Sincerely.

W. k. Robinson for J. E. Cross Enclosure c: Mr. John L. Martin Regional Administrator, Regior. V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. R. C. Barr i NRC Resident Inspector kj

, 0 Trojan Nuclear Plant 9211300004 921124 l\\

gDR ADOCK 00000344 PDR 121 SW Salmon Street, Portland, OR 97204 503/464-8897

/*.-

I C

)

STATE OF 0*tEGON)

)

COL"1TY OF COLUMBIA)

)

I, W. R. Robinson, being duly sworn, subscribe to and say that I am the Vice President, Nuclear for Portland General Electric Company, the applicant herein; that I haie full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

Date l' !2.4 , 1992 OAN'h' Ad W. R. Robinson Vice President, Nuclear On this day personally apperred before me W. R. Robinson, to nie known to be the Individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act.

GIVEN under my hand and seal this - c7Y day of houtm bfM , 1992.

18 K8] Y}l. CtAAAOld Notary Public in and for the State of Oregon Residing at /ifttu My commission expires IMa2dlS9; dh

_ _ _ - _ - - _ - _ _ _