ML20127L257
| ML20127L257 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 03/26/1973 |
| From: | Skovholt D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Mangelsdorf H Advisory Committee on Reactor Safeguards |
| References | |
| NUDOCS 9211230472 | |
| Download: ML20127L257 (1) | |
Text
i h
gj]/L March 26, 1973 Docket No. 50-263 Mr. Harold G. Mangelsdorf Chairman, Advisory Comittee on Reactor Safeguards U. S. Atomic Energy Comission Washington, D. C.
20545
Dear Mr. Mangelsdorf:
Sixteen (16) copies of the following are transmitted for the Comittee 's information:
Letter from Northern States Power Company dated March 19, 1973, reporting that the main steam tunnel high area temperature switch set point was found to exceed the limit specified in the Monticello Technical Specifications.
Sincerely, Diperibution
'[ r k4ocket File
. Donald J.
vholt Branch Reading Assistant Director;for Operating Reactors, Directorate of Licensing i
Enclosures:
As stated (A
0FFICE > h.i.9.
.f..
SURNAMT> RMDig8SIsj h...
=
DATr >
. AEC.)le (Rev. 9-53) AECM 0240
+44-to-a14u-i e4 Hrs R
9211230472 730326 PDR ADOCK 05000263
[
O PDR
-