ML20127K472
| ML20127K472 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/12/1993 |
| From: | Merschoff E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beard P FLORIDA POWER CORP. |
| References | |
| NUDOCS 9301260133 | |
| Download: ML20127K472 (4) | |
Text
____-
f JM i 21993 Docket No. 50-302 License No. DPR-72 Florida Power Corporation Mr. Percy M. Beard, Jr.
Senior Vice President, Nuclear Operations ATTN: Manager, Nuclear Operations Licensing P.O. Box 219-NA-21 Crystal River, FL 32629 Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING ARRANGEMENTS - CRYSTAL RIVER DOCKET NO. 50-302 This confirms the telephone conversation between Mr. E. Froats of your staff and Mr. K. Landis of my staff, on December 14, 1992, concerning a management meeting to be conducted at the Region II Office on January 22, 1993, at 10:30 a.m.
The purpose of the meeting is a presentation by Flterida Power Corporation on Operations Enhancements at Crystal River.
Enclosed is a proposed meeting agenda.
Should you have any questions regarding these arrangements, we will be pleased to discuss them.
Sincerely, Original signed by Jon R. Johnson (for)
Ellis W. Merschoff, Director Division of Reactor Projects
Enclosure:
Proposed Meeting Agenda cc w/ enc 1:
Gary L. Boldt Vice President, Nuclear Production Florida Power Corporaiion P. O. Box 219-SA-2C Crystal River, FL 34423-0219 cc w/ encl cont'd:
See page 2) 930156'Oi3'3 930112 8
PDR ADOCK 05000302 P
PDR IE01
Florida Power Corporation.
2-m@ 1993
- cc w/onel cont'd
B. J llickle, Director-
_ Nuclear Plant Operations y
Florida Power Corporation
-i P. O. Box 219-NA-2C q
Crystal River, FL 34423 0219 R. C. Widell, Director R
Nuclear Operations Site Support-Florida Power Corporation P. O. Box 219-NA-21 Crystal River, FL 34423-0219 A. H. Stephens General Counsel MAC - A50 P. O. Box 14042 St. Petersburg, FL 33733 Attorney General Department. of Legal Affairs The Capitol Tallahassee, FL 32304 Jacob Daniel Nash Department-of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator
-Department of-Environmental Regulation Power Plant Siting Section State of Florida L2600 Blair Stone Road
--Tallahassee, FL -32301-Robert G. Nave, Director
~ Emergency-Management-Department of. Community Affairs 2740 Centerview Drive
' Tallahassee,-FL-32399-2100 l-Chai rma'n'-
E
- Board of County Commissioners
' Citrus County; 110 N. Apopka Avenue-Inverness, FL 36250-cc w/ encl cont'd:
See page 3 l=
---a
3 iFlorida_ Power Corporation 3
JAN 1-2 1933 cc w/ encl cont'd:
~
Robert-B. Borsum
~B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Rockvi_lle,; MD 20852-1631 bec w/ encl:
H. Silver, NRR-K. D. Landis, DRP,'RII A. Long, DRP, RII Document Control Desk
.NRC Resident Inspector U.S. Nuclear Regulatory Commission 6745_ N. Tallahassee Road Crystal River, FL -34428 >
- i.
I-1.
b 3:
l L
RII:DRP RI P.
RII:DRP atV tw V
'Along KL s-MSinkule-
-01/a /93 01/pl/93 01/4/93 i.
c ey wa-e
.e e.imo.
3.... -
ENCLOSURE-FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 PRESENTATION ON OPERATIONS ENHANCEMENT TO THE NRC JANUARY 22, 1993, 10:30 a.m.
AGENDA OPENING REMARKS P. M. BEARD, SENIOR VICE PRESIDENT, NUCLEAR OPERATIONS FPC SELF ASSESSMENT OF OPERATIONS G. L. BOLDT, VICE PRESIDENT, NUCLEAR PRODUCTION W. M. MARSHALL, MANAGER, NUCLEAR PLANT OPERATIONS STRENGTHS SELF ASSESSMENT TRAINING / EXAM PERFORMANCE MANAGEMENT INVOLVEMENT PEOPLE TEAMWORK CONTROL ROOM DEMEANOR SHIFT TURNOVERS INVESTIGATION AND FOLLOW-UP STAFFING LKALLENGES CONTROL 0F MAINTENANCE AND SURVEILLANCE ACTIVITIES CONSISTENCY IN OPERATOR / CREW PERFORMANCE COMMAND AND CONTROL PROCEDURE ADEQUACY INAPPROPRIATE ACTIONS INADVERTENT-0PERATIONS USE 0F RESOURCES VISIBILITY OF PERFORMANCE ISSUES j
SOTA PERFORMANCE o
CLOSING REMARKS P. M. BEARD L
l-l
.