. Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 E !.PR 2I; c)II:I7 April 19, 1985 ANPP-32451 -TDS/PJC -
qEg;; y p U. S. Nuclear Regulatory Commission Region V 1450-Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects
Subject:
Interim Report - DER 85-12 A 50.55(e) Potentially Reportable Deficiency Relating to Cracking in the Unit 2 Auxiliary Building Walls File:
85-019-026; D.4.33.2
Reference:
Telephone Conversation between R. C. Sorensen and T. R. Bradish on April 1, 1985.
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by June 14, 1985, at which time a complete report will be submitted.
Very truly yours, k
h E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/PJC/rlm Attachment CC:
See Page Two 8505220095 850419 PDR ADOCK 05000529 S
PDR l1\\
L
~l
- 7 -
a 4lt ANPP-32451-TDS/PJC April 19,-1985 Mr.' D. F. Kirsch DER 85-12 Page Two cc: -Richard DeYoung, Director Office Of Inspection and' Enforcement
.U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 D. B.. Karner W. E. Ide D.lB. Fasnacht
-A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver-C. N. Russo B. S. Kaplan J. R.,Bynum J. M. Allen D. Canady A. C.'Cehr W. J. Stubblefield
.W. G. Bingham R. L. Patterson r*
'R. W. Welcher.
P~
H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde B. T. Parker T. J. Bloom D. N. Stover.
J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, suite 1500 Atlanta, GA 30339 O
iG jy,
6 INTERIM REPORT - DER 85112 POTENTIAL REPORTABLE DEFICIENCY -
4 ARIZONA NUCLEAR POWER PROJECT PVNGS UNIT 2 I.
Potential Problem Cracks have been discoveredDin some of the interior walls in the Southwest quadrant of the Auxiliary _ Building between elevation 70
-and 88.
All noted cracks-have been ' documented on NCR CA-5071.
Additional inspections'and a preliminary evaluation of crack patterns
.have failed to. identify a specific cause for-the cracking. Further inspection and monitoring are required to determine the root cause of the cracking.
II.
Approach To and Status'Of Proposed Resolution Bechtel Engineering will monitor the areas for evidence of further.
crack' propagation, and will continue to evaluate all available data relative to the problem in an effort to identify the root cause.
III.. Projected Completion of Corrective Action and Submittal of the Final Report The complete evaluation and_ final report.are forecast to be completed by June 14, 1985.-
(