Forwards QA Program Insp Rept 99900914/85-01 on 850304-08 & Notice of Nonconformance
ML20127K256
Person / Time
Issue date: 05/20/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Ison W
NATIONAL TECHNICAL SERVICES
Shared Package
ML20127K262 List:
References
REF-QA-99900914 NUDOCS 8505220082
Download: ML20127K256 (2)


Text

o UNITED STATES 8%

NUCLEAR REGULATORY COMMISSION o

h *-

ft WASHINGTON, D. C. 20555 3

k..w...,/

May 20, 1985 Docket No. 99900914/85-01 r

National Technical Services ATTN: Mr. W. J. Ison Division Vice Pres'ident State Route 748,~aox 38 Hartwood, Virginia. 22471 Gentlemen:

This refers to the inspection conducted by Mr. G. T. Hubbard of this office on March 4-8, 1985, of your facility at Hartwood, Virginia, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection ~.

The purpose of this inspection was to perform a technical evaluation of your equipment qualification test activities for safety-related equipment and to

-verify implementation of your corrective action on the nonconformances identi-fied in NRC Inspection Report Nos. 99900914/83-01 and 84-01. Areas examined during the inspection and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The nonconformances listed in Appendix A are a result of personnel not following the requirements of National Technical Systems Quality Control Manual or IEEE-STD-323/1974; such as, initial-

.ing and dating documents and_ corrections to documents, timely issuance and followup of corporate audit reports, and listing test equipment and'their accuracies in test plans or test procedures. The specific findings and references to the pertinent requirements are identified in the enclosures to this-letter.

Please provide us within 30 days from the date of this letter a written state-i ment containing:

(1) a description of steps that have been or will be taken to t

correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. _ Consideration may be given to extending your response time for good cause shown.

o F0" 7 N

(("gA Original docianese not,au=O h NW o.a.a 6a w monAos 0

s

-~

e

'Natidnal Technical Services May 20, 1985 The responses requested by this letter are not' subject _to the clearance procedures _of the Office of Management and Budget as required by the Paperwork Reduction Act of'1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's

-Public Document ~ Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with~you.

Sincerely, Om0 HEAL SiONED BY:

GAtf6.EEN Gary G. Zech, Chief Vendor Program Branch Division of Quality t.ssurance, Vendor, and Technical Training Center. Programs Office of Inspection and Enforcement

Enclosures:

1.

Appendix A-Notice of Nonconformance 2.

Appendix B-Inspection Report No. 99900914/85-01

~ 3.~ Appendix'C-Inspection Data Sheets (3 pages)

DISTRIBUTION:

DMB:IE:09 VPB Reading DQAVT Reading RVollmer JTCollins JStone-UPotapovs GHubbard-RMoist GBagchi,NRR/EQB JThomas, DPC-

  • SEE PREVIOUS PAGE FOR CONCURRENCE VPB:DQAVT* 'VPB:0QAVT*'

SC/VPB:DQAVT*

PB:DQAVT

_ M :DQAVT RMoist: sam GHubbard UPotapovs GGZech BKGrimes

.4/11/85 4/11/85 4/11/85 5/0/85 5/ *V85 t

-