l JAN I 21993 Florida Power Corporation Mr. Percy M. Beard, Jr.
Senior Vice President, Nuclear Operations ATIN:
Manager, Nuclear Operations Licensing P. O. Box 219-NA-21 Crystal River, FL 34423-0219 Centlemen:
SUBJECT:
REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS EXAMINATION REPORT NO. 50-302/93-300 In a telephone conversation between Mr. J. Smith, Nuclear Licensed Training g
Supervisor and Mr. R. Baldwin, license Examiner, NRC Region II Operator M
Licensing Section, arrangements were made for the administration of licensing examinations at Crystal River-3.
The examination preparation visit is scheduled for May 10, 1993.
The written examinations are scheduled for May 24, 1993, and the operating examinations are scheduled for May 25, 1993. During the examination preparation visit, requalification retake examinations will be administered to all operators that failed the November 1992 requalification examination.
To meet the above schedule, it will be necessary for you to furnish the reference material listed in Enclosure 1, " Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by February 24, 1993.
Any delay in receiving approved, properly bound and indexed reference material, or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled. Mr. J. Smith has been advised of our reference material requirements and the address where each set is to be mailed.
You are responsible for providing adequate space and accommodations for administration of the written examinations., " Requirements for Administration of Written Examinations," describes our requirements for conducting these examinations. Mr. J. Smith has also been informed of these requirements., "NRC Rules and Geideline, for Written Examinations," contains the Rules and Guidelines that will be in effect during the administration of the written examination.
The facility management is responsible for ensuring that all applicants are aware of these rules.
The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, " Requirements for Facility Review of Written Examinations." Mr. J. Smith has been informed of these requirements.
9301260073 930112 Il PDR ADOCK 03000302 I
SM? ;
V PDR-
a 1
Florida Power Corporation 2
JAN I 2 GGG i
To better document simulator examinations, the Chief Examiner wil' have the simulator operator record predetermined plant conditions (i. e.,_piant pressure, temperature, pressurizer level, etc.), for each simulator scenario. The
- applicants will be responsible for providing this information, with any appeal of a simulator operating examination.
Therefore, your training staff should retain the original simulator examination scenario information until all applicants who took examinations have either passed the operating examination, accepted the denial of their license, or filed an appeal.
Preliminary reactor operator and senior reactor operator license applications should be submitted at least 30 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after applicant eligibility has been determined.
If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary, Final signed applications certifying that all training has been completed shall be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101 which expires October 31, 1995.
This estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing, and mailing the required material.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NE08-3019, Office of Management and Budget,
- Washington, D. C. 20503.
Thank you for your consideration in this matter.
If you have any questions regarding the examination procedures and requirements, please-contact Mr. Michael E. Ernstes, Chief, Operator Licensing Section 2, at (404) 331-5594, or myself at (404) 331-5541, Sincerely, ORIGINAL SIGNED BY T. /L PEEBLES Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety
Enclosures:
(See Page 3) 1
Florida Power Corporation-3 JAN I 21993
Enclosures:
1.
Reference Material-Requirements for Reactor / Senior Reactor Operator Licensing Examinations 2.
Requirements for Administration of Written Examinations 3.
NRC Rules and Guidelines for Written Examinations 4.
Requirements for facility Review of Written Examinations cc w/encls:
Gary L. Boldt Vice President, Nuclear Production Florida Power Corporation P. O. Box 219-SA-2C Crystal River, FL - 34423-0219 B. J. Hickle, Director Nuclear Plant Operations Florida Power Corporation P. O. Box 219-NA-2C Crystal Rivcr, FL 34423-0219 R. C. Widell, Director Nuclear Operations Site Support Florida Power Corporation P. O. Box 219-NA-21 Crystal River, FL 34423-0219 A. H. Stephens General Counsel i
Florida Power Corporation MAC - A5D Pi 0. Box 14042 St. Petersburg, FL 33733 Attorney General 4
Department of Legal Affairs The Capitol Tallahassee, *L 32304 Jacob Daniel Nash Office of Radiation Control Department of Health.and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 (cc w/encls cont'd - See Page 4) i A-
..u
florida Power Corporation 4
JAN I 21993 cc w/encls cont'd:
Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Robert G. Nave, Director Emergency Management Department of Community Affairs 2740 Centerview Drive tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Robert B. Borsum B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852-1631 L. Kelley, Training Manager Florida Power Corporation Crystal River Nuclear Plant P. O. Box 219 Crystal River, FL 32629 J. Lind, Manager Nuclear Licensed Operator Training Florida Power Coporation Crystal River Nuclear Plant 8200 West Seven Rivers Drive Crystal River, FL 32629 (bcc w/o encls - See page 5)
,al
. _. ~.
Florida Power Corporation 5
JAN -l 21993 bcc w/o-encls:
H. Silver, NRR A. F. Gibson, DRS K. Landis, DRP C. Payne, DRS I
R. Baldwin, DRS U.S. Nuclear Regulatory Commission ATTN: Mr. P, Holmes-Ray, Senior Resident inspector 6745 N. Tallahassee Road Crystal River, FL 34428 bcc w/encls:
Document Control Desk.
1 d
l
'RII:DRS RII:DRS RII:DRS QY)b ff) C jff' i.,RBaldwin:rsb/sd MErnstes TPbebles Ol/n./93 01/1I/93 01//t/93 Doc Name:G:\\1a\\ crystal \\l30190da-rsb
- r a
m m m
2 m.
l EllCt0SURE 1 REEERENCE MATERIAL _RE9UIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR tICENSING EXAMINATIONS 1.
Existing learning objectives, Job Performance Measures, student handouts and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermodynamics, etc.).
A copy of the facility Job and Task Analysis (JTA), specifying the knowledges and abilities required of an operator at the facility.
Each particular knowledge and/or ability will include an importance rating correlating it to ensuring the health and the safety of the public.
If a JTA is not furnished, the Knowledges and Abilities Catalog for Nuclear Power Plant Operators, NUREG-ll22 (li23) will be used to establish content validity for the examination.
All Job Performance Measures (JPMs) used to ascertain the competence of the operators in performing tasks within the control room complex and, as identified in the f acility JTAs, outside of the control room, i e., local operations.
Training materials shall include all substantive written material used for preparing applicants for initial R0 and SR0 licensing.
The written material shall include learning objectives and the details presented during lectures, rather than outlines. Training materials shall be identified by plant and unit, bound, and indexed.
FAILURE TO PROVIDE COMPLETE, PROPERLY BOUND AND INDEXE0 PLANT REFERENCE MATERIAL MAY RESULT IN THE RETURN OF THE MATERIAL 10 THE PERSON WHO IS THE HIGHEST LEVEL OF CORPORATE MANAGEMENT WHO IS RESPONSIBLE FOR PLANT OPERATIONS (E. G.,
VICE PRESIDENT OF NUCLEAR OPERATIONS). ACCOMPANYING THE MATERIAL WILL BE A COVER LETTER EXPLAINING THE DEFICIENCIES IN THE REFERENCE MATERIAL AND THE FACT THAT THIS WAS THE REASON THE EXAMINATIONS WERE CANCELLED OR POSTPONED. Training materials which include the following shall be provided:
System descriptions including descriptions of all operationally relevant flow paths, components, controls, and instrumentation.
System training material should draw parallels to the actual procedures used for operating the applicable system.
Complete and operationally useful descriptions of all safety-system interactions and, where available, B0P system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training material used to clarify and strengthen understanding of emergency operating procedures.
2 2.
Complete Procedure Index (including surveillance procedures, etc.),
3.
All administrative procedures (as applicable to reactor operation or safety).
4.
All integrated plant procedures (normal or general operating procedures).
5.
All emergency procedures (emergency instructions, abnormal or special procedures).
6.
Standing orders (important orders that are safety-related and may supersede the regular procedures).
7.
Surveillance procedures (procedures that are run frequently,- 1.
e., weekly or that can be run on the sitaulator).
8.
Fuel-handling and core-loading procedures, (initial core-loading procedures, when appropriate).
9.
All annunciator / alarm procedures.
10.
Radiation protection manual (radiation control manual or procedures),
11.
Emergency plan implementing procedures, n
12.
Technical Specifications (and interpretations, if available) for all1 units-for which licenses are sought.
13.
System operating procedures.
14.
Piping-and instrumentation diagrams, electrical single-line diagrams, or flow diagrams.
15.
Technical Data Book and/or plant curve information as used by operators and-facility precautions, limitations, and-set points (PLS)-for the facility.
16.
Questions-and answers specific t, the facility-training-program'which may be used in-the written or operating examinations (voluntary by. facility licensee).
17.
The following on the plant reference simulation-facility.
a.
List of all preprogrammed initial conditions.
b.
List of-all preset malfunctions with-a clear identification number.
The list shall include cause and effect information.
Specifically, for each malfunction a concise description:ofithe expected result, or range of results, that will occur upon implementation shall; be-provided. _ Additionally, an indication of which annunciators are to;be initially expected shall be given.
. Enclosure 1 3
c.
A description of simulator failure capabilities for valves, breakers, indicators, and alarms.
d.
Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction shall be provided, i.
e.,
ability to vary the size of a given LOCA or steam leak, or the ability to'-
cause a slow failure of a component such as a feed pump, turbine l
generator, or major valve (e.g., drifting shut of a main feedwater -
control valve). -
e.
An identification of modeling conditions / problems that may impact the examination.
f.
Identification of any known performance test discrepancies not yet' corrected, g,
Identification of differences between the simulator and the reference plant's control room.
h.
Copies df facility generated scenarios that expose the applicants to situatio'ns of degraded pressure control (PWR), degraded heat removal-capability (PWR and BWR) and containment challenges (PWR and BWR) may -
be provided (voluntary by licensee),
i.
Simulator instructors manual (voluntary by licensee).
J.
Description of the scenarios used for the training class (voluntary by licensee).
- 18. Additional material required by the examiners to develop examinations that l
meet the requirements of these Standards and the regulations, l
l The above reference material shall be approved,- final issues. and ahall be so -
i marked.
If a plant has not-finalized some of-the material, the Chief Examiner shall verify with the facility that the most complete, up to-date material is -
available-and that agreement has been reached with the licensee for-limiting i
changes ~before the administration of the. examination. All procedures and reference material shall be. bound-with appropriate indices _or tables of-contents so that they can be used efficiently.
Failure to provide complete,! properly
- bound and indexed plant reference material could result _in cancellation or-rescheduling of the examinations.
t
,.4.
..r.-.
j ENCLOSURE 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS 1.
A single room shall be provided for administration of the written examination. The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the written examination.
If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building.
Obtaining this room is the responsibility of the licensee.
2.
Minimum spacing is required to ensure examination integrity as determined by the Chief Examiner.
Minimum spacing should be one applicant per table, with a 3-foot space between tables.
3.
Suitable arrangements shall be made by the facility if the applicants are to have lunch, coffee, or other refreshments.
These arrangements shall comply with Item 1 above and shall be reviewed by the proctor.
4.
The facility licensee shall provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination.
The proctor shall distribute these pads to the applicants as needed.
5.
Applicants may bring pens, pencils, calculators, or slide rules into the examination room.
Only black ink or dark pencils should be used for writing answers to questions.
6.
The licensee shall provide one set of-steam tables for each applicant.
Tne proctor shall distribute the steam tables to the applicants.
No wall charts, models, and/or other training materials shall be present in the examination room.
No other equipment or reference material shall be allowed unless provided by the proctor.
7.
The facility staff shall be provided a copy of the written examination and answer key after the last candidate has handed in his written examination.
The f acility staff shall have five (5) working days to provide farmal written comments with supporting dacumentation regarding written examination questions and ansmrs to the Chief Examiner.
__~
~~
-~
..-r ENCLOSURE 3 PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS 1.
Check identification badges.
2.
Pass out examinations and all handouts.
Remind applicEnts not to review examination until ir,structed to do so.
i READ THE FOLLOWING INSTRUCTIONS VERBATIM:
During the administration of this examination the following-rules apply-1.
Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2.
After the examination-has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination.
This must be done af ter you complete the examination.
READ THE FOLLOWING INSTRUCTIONS:
-1.
Restroom trips are to be limited and only one applicant-at a time may leave. You must avoid all contacts with anyone__outside the. examination room to avoid even the appearance or possibility of. cheating.
2.
Use black ink or-dark pencil only to facilitate legible reproductions.
3.
Print your name in the blank provided-in the-upper right-hand? corner of the examination cover' sheet and each answer sheet.
- 4.. Mark your-answers on the answer sheet provided. USE ONLY THE l' APER PROVIDED, AND 00 NOT WRITE ON THE BACK SIDE OF THE PAGE.
5.
Before you turn in your-examination, consecutively number each-answer sheet, including any additional pages inserted:when writing your answers on' the examination question page.
6.
Use~ abbreviations only if they are commonly used in. facility literature.
Avoid using symbols such as < or > signs to avoid-a simple transpositioni error resulting_in an incorrect answer.
Write-it out.
7.
The point value for each question:is indicated in parentheses after the question.
1 e
~. -.
i a
2 8.
Show all calculations, methods, or assumptions used to obtain an answer to any short answer questions.
9.
Partial credit may be given except on multiple choice questions.
Therefore, ANSWER ALL PARTS of Tile QUESTION, AND 00 NOT LEAVE ANY ANSWER
-l BLANK.
i 10.
Proportional grading will be applied. Any additional wrong information that is provided may count against you, for example, if a question is worth one point and asks for four responses, each of which is worth 0.25 points, and you give five responses, each of your responses will be worth-0.20 points.
If one of your five respor.ses is incorrect, 0.20 will be deducted, and your total credit for that question will be 0.00 instead of 1.00 even though you got the four correct answers.
11.
If the intent of a question is unclear, ask questions of the examiner only.
12.
When turning in your examination, assemble the completed examination with examination questions, examination aids, and answer sheets, in addition, turn in all scrap paper, 13.
Ensure all information you wish to have evaluated as part of your answer -is on your answer sheet.
Scrap paper will be disposed of immediately following the examination.
14.
To pass the examination, you must achieve a grade of 80% or greater',
15.
There is a time limit of four (4) hnurs for completion of the examination.
16.
When you are done and.have turned in your examination, leave the examination area (DEFINE Tile AREA).
If you are found in-this area while the examination is still in progress, your license may-be denied or revoked.
..,,a.
.=.~m,m, n
g ENCLOSURE 4 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATIONS 1
I.
At the option of the Chief Examiner, the facii'.y may review the written examination up to two weeks prior to its administration.
This review may take place at the facility or in the Regional office.
The review will be cnnducted using the same material sent to the NRC for exam generation purposes.
The Chief Examiner will coordinate the details of the review-with the facility. An NRC examiner will always be available during the review.
Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior--to being allowed access to the examination.
The examination or written notes will-not be retained by the facility, a.
Pre-Examination Security Agreement-1, acknowledge that I have acquired specialized knowledge concerning the examination scheduled for at as of_the date of my signature below.
I agree that I will not knowingly divulge any information concerning this examination to any unauthorized-persons.
I understand ti.at I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered.
I further understand that violation of the conditions of this agreement may result in the examination being canceled and/or enforcement action against myself or the facility licensee by whom I am employed or.
represent-.
Signature /Date In addition, the facility staff reviewers will sign the following statemant after the written examination has been administered, b.
Post-Examination Security Agreement I,
, did not, to the best of my knowledge,,
divulge any-information concerning the examinations administered.
during the week of at to any unauthorized persons.
I did'not participate in providing.any instruction to those applicants who were administered the examination h
from the date.I entered.into this security agreement until:the-completion of ' examination administration.
1 i
Signature /Date
,m m
,s._
a3
.,,-_ u
~
m u
w-
4 2
2.
Regardless of whether the above examinatica review option is exercised, immediately following the administration of the written examination, the facility staff shall be provided a marked-up copy of the examination and the answer key.
The copy of the written examination shall include pen and ink changes made to questions during the examination administration.
If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments.
If the facility reviewed the examination prior to its administration, any additional comments must be given to an examiner prior to his/her leaving the site at the end of the week of the written examination administration.
In either case, the comments will be addressed to the responsible Regional Office by the highest on-site level of corporate management for plant operations, e.g.,
Vice President for Nuclear Operations. A copy of the submittal will be forwarded to the Chief Examiner, as appropriate.
Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis by the Regional Office Section Chief.
Should the comment submittal deadline not be met, a long delay in grading the examinations may occur.
3.
The following format should be adhered to for submittal of specific comments:
a.
Listing of NRC question, anst-and reference.
b.
Facility comment / recommendation.
c.
Reference (to support facility comment).
NOTES:
(1)
No change to the examination will be made without submittal of a reference to support the facility comment. Any supporting documentation that was not previously supplied, snould be provided.
(2)
Comments made without a concise facility recommendation will not be addressed.
4.
A two-hour post-examination review may be held at the discretion of the Chief Examiner If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.
_