Notice of Violation from Insp on 850225-0301
ML20127K218
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/11/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20127K213 List:
References
50-424-85-08, 50-424-85-8, 50-425-85-08, 50-425-85-8, NUDOCS 8505220071
Download: ML20127K218 (2)


See also: IR 05000225/2003001

Text

..

-

.

-

-.

-

-

.-

._

. .

'

.

.

.

'

.,;

,

ENCLOSURE 1-

NOTICE OF VIOLATION

.

Georgia. Power Company

Docket Nos. 50-424 and 50-425

,

Vogtle

License Nos. CPPR-108 and CPPR-109

The following violations .were- identified during an . inspection conducted on

February 25- . March 1, 1985.

The Severity Levels were assigned in .accordance

with the NRC. Enforcement Policy (10 CFR Part 2, Appendix C)..

<1.-

10 CFR 50, Appendix B, Criterion VIII, as implemented by PSAR Chapter 17.-

_

Section 17.1.8, requires that measures be established for the identification

and . control ._of.. materials, parts, and components, including partially

.

fabricated assemblies._ These identification and control measures- shall be

- designed to, prevent the-use of incorrect or defective materials, parts, and

components.

Contrary to. the above, on February 25, 1985, activities were not accom-

'plished in accordance with.the above, in that.no_ arrangements for physical

. contro1~ of access were in place for the instrumentation satellite warehouse

' on top of the control building.

This is a Severity Level IV violation (Supplement II).

2.:

10 CFR 50, Appendix B, Criterion IX, as . implemented by PSAR Chapter 17,

Section 17.1.9, requires that measures be established for control of special

processes' including welding.-

.

.

q

Contrary 'to the above, on February 25, 1985,. activities were not accom-

plished in accordance with the above, in that Pullman Power Products (PPP)

"

,

Pipe ~ Support Field Installation and Fabrication Procedure IX-50' failed to

require inspection of fit-up to ensure meeting _ required effective throat.

-

- This .is required when partial penetration groove welds are substituted for

-

' fillet welds in the field with no changes to design drawings or annotations

to quality data as allowed by paragraph 10.21 and attachments 25 and 26.

This is a Severity Level-IV violation (Supplement II).

.

P'ursuant to 10 CFR 2.201,'you are required to submit to this office within 30

days of the 'date of this Notice, a written statement or explanation in reply,

' including:

(1) admission or denial of the alleged violations; (2) the reasons

for the violations if admitted; (3) the corrective steps which have been taken

and the results achieved; (4) corrective steps which will be taken to avoid

-

further violations; and (5) the date when full compliance will be achieved.

-

G

i-

<

-

- =.-

.

. .

._. _ _ _ _ ,- _ _ . _ - _ .~ . _ -._ _ _ _ _ - _ .- _ _ _ _ .-. _ .. ...

,

'

.:.

,:

. Georgia Power Company

2

Docket Nos. 50-424 and 50-425

Vogtle_

' License Nos. CPPR-108 and CPPR-109

--

Security or safeguards information should be. submitted as an enclosure to

facilitate withholding it from public ' disclosure as required by 10 CFR 2.790(d)

or .10 CFR 73.21.

APR IJ 1985