Georgia. Power Company
Docket Nos. 50-424 and 50-425
,
- Vogtle
License Nos. CPPR-108 and CPPR-109
The following violations .were- identified during an . inspection conducted on
February 25- . March 1, 1985.
The Severity Levels were assigned in .accordance
- with the NRC. Enforcement Policy (10 CFR Part 2, Appendix C)..
<1.-
10 CFR 50, Appendix B, Criterion VIII, as implemented by PSAR Chapter 17.-
_
Section 17.1.8, requires that measures be established for the identification
and . control ._of.. materials, parts, and components, including partially
.
fabricated assemblies._ These identification and control measures- shall be
- designed to, prevent the-use of incorrect or defective materials, parts, and
components.
Contrary to. the above, on February 25, 1985, activities were not accom-
'plished in accordance with.the above, in that.no_ arrangements for physical
. contro1~ of access were in place for the instrumentation satellite warehouse
' on top of the control building.
This is a Severity Level IV violation (Supplement II).
2.:
10 CFR 50, Appendix B, Criterion IX, as . implemented by PSAR Chapter 17,
Section 17.1.9, requires that measures be established for control of special
processes' including welding.-
.
.
q
Contrary 'to the above, on February 25, 1985,. activities were not accom-
plished in accordance with the above, in that Pullman Power Products (PPP)
"
,
Pipe ~ Support Field Installation and Fabrication Procedure IX-50' failed to
require inspection of fit-up to ensure meeting _ required effective throat.
-
- This .is required when partial penetration groove welds are substituted for
-
' fillet welds in the field with no changes to design drawings or annotations
to quality data as allowed by paragraph 10.21 and attachments 25 and 26.
This is a Severity Level-IV violation (Supplement II).
.
P'ursuant to 10 CFR 2.201,'you are required to submit to this office within 30
days of the 'date of this Notice, a written statement or explanation in reply,
' including:
(1) admission or denial of the alleged violations; (2) the reasons
for the violations if admitted; (3) the corrective steps which have been taken
and the results achieved; (4) corrective steps which will be taken to avoid
-
further violations; and (5) the date when full compliance will be achieved.
-
G
i-
<
-
- =.-
.
. .
._. _ _ _ _ ,- _ _ . _ - _ .~ . _ -._ _ _ _ _ - _ .- _ _ _ _ .-. _ .. ...
,
'
.:.
,:
. Georgia Power Company
2
Docket Nos. 50-424 and 50-425
Vogtle_
' License Nos. CPPR-108 and CPPR-109
--
Security or safeguards information should be. submitted as an enclosure to
facilitate withholding it from public ' disclosure as required by 10 CFR 2.790(d)
or .10 CFR 73.21.