E
~*'.m
-- 3 ENCLOSURE-1 s
- NOTICE'0F VIOLATION
~ Duke'Powe'r Company Docket Nos. 50-369 and-50-370 McGuire License Nos. NPF-9 and NPF-17 The' following = violation was identified during ~an inspection conducted on March 4 - 8,-1985.
The Severity Level.was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).
110.CFR 50~ Appendix B Criterion III-and the licensee's accepted QA program -
Section.17.2.3 collectively require that measures be established to assure 7that ' applicable'. regulatory ; requirements ~ are correctly translated into
' specifications, drawings, procedures and instructions.' The - QA-Program endorses Regulatory Guide 1.64, Revision 2, and ANSI N45.2.11-1974, Quality Assurance Requirements for the Design of Nuclear Power P_lants.
Paragraph 3.2.20 of this standard states that the design input shall include test requirements including in plant tests and the conditions-under which they
.'will.be performe'd.
Contrary to the above, Duke's Design Engineering Department does not specify~
post-modification acceptance test requirements and test acceptance criteria for. station modifications designed by.the Design Engineering Department.
This is a-Severity Level IV violation (Supplement I).
~
Pursuant to 10 CFR 2.201, you are required to submit to this. office within 30L days. of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violation; (2) the reasons for.the violation if admitted; (3) the' corrective steps which have been taken -
~ and the results ' achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the'date when' full compliance will be achieved.
' Security or ' safeguards information should be submitted as an enclosure - to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
- or 10 CFR 73.21.
Date: ' April 23,' 1985