ML20127J720

From kanterella
Jump to navigation Jump to search
Forwards Public Announcement of Issuance of Limited License to Util for Fuel Loading & Startup Testing of Plant
ML20127J720
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/09/1970
From: Harris J
US ATOMIC ENERGY COMMISSION (AEC)
To: Johnson, Ramey, Seaborg
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9211190406
Download: ML20127J720 (2)


Text

_.

e W

UNITED STATES f

4 ATOMIC ENERGY COMMISSION m

' b' I, wxsmooton. o c. rue f

4,

/

September 9, 1970 I'

,j

.y Chairman Seaborg

)

Commissioner Ramey

' d g~ /'

bj)' b 9

Commissioner Johnson Commissioner Thompson

{

Commissioner Larson ANNOUNCEMENT OF ISSUANCE OF LOW POWER LICENSE FOR j

MONTICELLO PLANT Enclosed for your information is a public announcement of l

issuance of a limited license to Northern States Power i

Company for fuel loading and startup testing of the Monti-cello Nuclear Generating Plant in Minnesota.

The announce-ment has the approval of the Deputy Director of Regulation.

We plan to distribute it today (September 9).

John A. Harris i

~

John A. liarris, Director Division of Public Information cc:

11. L. I rice, Director of Regulation 4

Date NEW Time b ',; j 9211190406 700909 PDR ADOCK 05000263 P

PDR l

0 0

\\

1 AEC ISSUES LOW Poh'ER LICENSE FOR MONTICELLO NUCLEAR PLANT IN MINNESOTA A license for limited operation of the Montic'eilo iiu-clear Generating Station in Minnesota has been issued to Northern States Power Company by the AEC's Division of Re-actor Licensing.

Issuance of the license was authorized by a decision of an Atomic Safety and Licensing Board on August 24 license permits only fuel loading and start-up testing of The the facility at power levels up to a maximum of five mega-watts thermal and without the reactor vessel head in place.

A public hearing conducted by the licensing board to consider the company's application for a full power licenso was held April 28-May 1; June 15-18; and August 5-7 in St.

Paul, Minnesota.

authorization for the low power license, and the board author-D ized its issuance after consideration of the evidence.

The proceeding on the full power license is continuing.

The Monticello plant, which was built under an AEC con-struction permit issued in June 1967, is located on a 1325-three miles northwest of Monticello. acre site on the west bank of the water reactor and will have a not electrical capacity of.The plant uses a

.approximately 545,000- kilowatts.

General Electric Company designed and built the reactor and turbogenerator portions of the plant.

by the AEC Regulatory Staff to assure that all construction

. necessary for fuel loading and low power testing has been satisfactorily completed.

I 4

1.