Forwards Safety Insp Repts 50-237/85-11 & 50-249/85-10 on 850422-24.No Noncompliance Noted.Exercise Weaknesses Encl. Corrective Actions & Estimated Date of Completion of Actions Requested within 45 Days of Ltr Date
ML20127J067
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/17/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20127J069 List:
References
NUDOCS 8505210365
Download: ML20127J067 (3)


See also: IR 05000237/1985011

Text

P ,, ,

c. w w ous

'

IMAY .17 E85

-

~

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN: .Mr. Cordell Reed

.Vice President

Post Office Box 767

,

Chicago, IL 60690

i

Gentlemeni

-This refers to the routine safety inspection conducted by Mr. G. A. Brown

and others of this office on April 22 through 24, 1985, of activities at

Dresden Nuclear Generating Station, Units 2 and 3, authorized by NRC

<'

' Operating Licenses No.- DPR-19 and.DPR-25, and to the discussion of our

findings .with Mr. D. Secct and others of your staff at the conclusion of-

the inspection.

~

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective-

examination of procedures and representative records, observations, and

A interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this. inspection. However, weaknesses were identified which will-

'

need corrective. action by your staff. These weaknesses are summarized in the

< Appendix to this letter. As required by 10 CFR 50, Appendix E (IV.F), any

. weaknesses that are identified must be corrected. Accordingly, please advise

-

'

us within 45 days of the date of this' letter of the corrective actions you

have taken,:or plan to:take, regarding these weaknesses, including the

estimated dates of completion.

The responses directed by this letter are not subject to the clearance

. procedures of the Office of Management and Budget as required by the Paperwork

, ' Reduction Act, PL 96-115.

In accordance with-10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC Public Document

Room.

'

.

n(

m ,

, .

Commonwealth Edison Company 2 MAY 17 fe5

We will gladly discuss any questions you have concerning this' inspection.

Sincerely,

- r

C. J. Pap riello, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1. Appendix, Exercise

Weaknesses

2. Inspection Reports

No. 50-237/85011(DRSS)

No. 50-249/85010(DRSS)

cc w/encis:

D. L. Farrar, Director

of Nuclear Licensing

D. J. Scott, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Phyllis Dunton, Attorney

,

General's Office, Environmental

! Control Division

D. Matthews, EPB, OIE

l

W. Weaver, FEMA V

r

/kr P ski' 1 en ips C ssotimos Pa) llo

5/15/85 fj'[ f

.

-

,

, -1 1

.

. APPENDIX

_

<

EXERCISE WEAKNESSES

<

1. ' Access control to the TSC'was not accomplished in a timely manner nor

-

was it performed in a satisfactory manner after it was established.

,

(50-237/85011-01 and 50-249/85010-01)

'

l 2. - Implementation of shift staffing and augmentation was not accomplished

-

in a timely manner. -There was a breakdown in the call tree.

, -(50-237/85011-02 and 50-249/85010-02)

' 3 .~ Evacuation of non-essential-personnel was.not ordered in a timely

-manner following completion ~of.the simulated accountability of onsite

personnel._.(50-237/85011-03 and 50-249/85010-03)

- 4. Poor radiological' control technique was observed during the handling

'

' of the radiological injury. .(50-237/85011-04 and 50-249/85010-04)

5. -The E0F failed to provide adequately detailed followup messages in

4

'accordance with the licensee's EOF Procedure EOF-1, paragraphs 4.2.f

and 5.2.f. (50-237/85011-05 and 50-249/85010-05)