See also: IR 05000237/1985011
Text
P
,,
,
ous
c. w w
-
IMAY .17 E85
'
~
Docket No. 50-237
Docket No. 50-249
Commonwealth Edison Company
ATTN: .Mr. Cordell Reed
.Vice President
Post Office Box 767
Chicago, IL 60690
,
i
Gentlemeni
-This refers to the routine safety inspection conducted by Mr. G. A. Brown
and others of this office on April 22 through 24, 1985, of activities at
- Dresden Nuclear Generating Station, Units 2 and 3, authorized by NRC
' Operating Licenses No.- DPR-19 and.DPR-25, and to the discussion of our
<'
findings .with Mr. D. Secct and others of your staff at the conclusion of-
the inspection.
~
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective-
examination of procedures and representative records, observations, and
- A interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this. inspection. However, weaknesses were identified which will-
need corrective. action by your staff.
These weaknesses are summarized in the
'
< Appendix to this letter. As required by 10 CFR 50, Appendix E (IV.F), any
. weaknesses that are identified must be corrected.
Accordingly, please advise
-
'
us within 45 days of the date of this' letter of the corrective actions you
have taken,:or plan to:take, regarding these weaknesses, including the
estimated dates of completion.
The responses directed by this letter are not subject to the clearance
. procedures of the Office of Management and Budget as required by the Paperwork
' Reduction Act, PL 96-115.
,
In accordance with-10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC Public Document
Room.
'
.
n(
m
,
,
.
Commonwealth Edison Company
2
MAY 17 fe5
We will gladly discuss any questions you have concerning this' inspection.
Sincerely,
r
-
C. J. Pap riello, Chief
Radiological Protection Branch
Enclosures:
1.
Appendix, Exercise
Weaknesses
2.
Inspection Reports
No. 50-237/85011(DRSS)
No. 50-249/85010(DRSS)
cc w/encis:
D. L. Farrar, Director
of Nuclear Licensing
D. J. Scott, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
,
!
Control Division
l
D. Matthews, EPB, OIE
W. Weaver, FEMA V
r
/kr
P ski'
1
en
ips
C
ssotimos
Pa)
llof
fj'[
5/15/85
.
-
,
, -
1
.
1
. APPENDIX
_
<
EXERCISE WEAKNESSES
<
1.
' Access control to the TSC'was not accomplished in a timely manner nor
-
- was it performed in a satisfactory manner after it was established.
(50-237/85011-01 and 50-249/85010-01)
,
'
l 2. -
Implementation of shift staffing and augmentation was not accomplished
in a timely manner. -There was a breakdown in the call tree.
-
-(50-237/85011-02 and 50-249/85010-02)
,
' 3 .~
Evacuation of non-essential-personnel was.not ordered in a timely
-manner following completion ~of.the simulated accountability of onsite
personnel._.(50-237/85011-03 and 50-249/85010-03)
- 4.
Poor radiological' control technique was observed during the handling
' of the radiological injury. .(50-237/85011-04 and 50-249/85010-04)
'
- 5.
-The E0F failed to provide adequately detailed followup messages in
'accordance with the licensee's EOF Procedure EOF-1, paragraphs 4.2.f
4
and 5.2.f.
(50-237/85011-05 and 50-249/85010-05)