Text
Q
wJ 7
e
, , <
,
-
r..
M
3An 15 993
Docket No. 50-213 -
Mr. John F. Opeka
lhecutive Vice President Nuclear
Connecticut Yankee Atomic Power Company
P.O. Ik1x 270
llartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUllJECT: lladdam Neck inspection 92-21
This letter transmits the report of the resident safety inspection conducted by Messrs. W, --
Itaymond and P. Habighorst of this office during the period November 15,1992, to
.
December 12, 1992, at the Haddam Neck Plant, lladdam Neck, Connecticut The report
covers activities authorired by NRC 1.icense No. DPR-61. This inspection was focused on
issues important to public health and safety. Prelimiriary findings were discussed with Mr. J.
Stetz of your staff at the conclusion of the inspection.
-During this report period, we found lladdam Neck was operated in a safe and conservative
manner,- Our inspection validated the adequacy of procedures to mitigate a station blackout
(Silo) event. In particular, we verified risk-significant manual operator actions could be -
performed within the times required. Also, we determined actions by plant staff to address
human engineering deficiencies will enhance the ability of the plant to cope _with the Silo
. event. Finally, we found the auxiliary operator training program was a notable strength and
the plant operators performed their__ emergency duties well.
During this inspection, we identified a failure to_ perform a required surveillance on the low
pressure safety injection system core deluge valve position Since the core deluge valves are'
'
routinely _ verified to be in the correct position as part of daily panel checks, the failure to -
document this fact had minimal safety significance. Also, since you initiated adequate
corrective actions to prevent recurrence, we exercised enforcement discretion for. this case in -
accordance with Section VII,B of the Enforcement-Policy,
We appreciate your cooperation.
Sincerely,
Oti@al SiTICd I4
A. Randolph Blough, Chief
930125000{ g @PDR1
33
Projects 11 ranch No,4-
PDit
ADoc
Division of Reactor Projects
-0
OFFICIAL RECORD COPY . q-
g
-
- . . . . - .
- - . .
... .-.. - .- -
.
.-
-
- - .
- . . . - . .
. . .
.
-
i
I
'
'
,
.;-
.
'
JAN 15 093
.,
.
Connecticut Yankee Atomic Power Company 2
.
Enclosure:
,
- 1. NRC Region 1 inspection Report No. 50-213/92-21
cc w/ encl:
W. D. Romberg, Vice President, Nuclear, Operation Services
J. P. Stetz, Vice President, Iladdam Neck Station
G. H. Bouchard, Nuclear Unit Director
Di O. Nordquist, Director of Quality Services
,
R. M. Kacich, Directo. , Nuclear Licensing
Gerald'Oarfield, Esquire
Nicholas Rey;' olds, Esquire
K. Abraham, PAO (2)-
Public Decument Room (PDR)
Iwal l'ublic Document Room (LPDR)
i-
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
State of Connecticut SLO
,
C
.
. . .
.
.
OFFICIAL RECORD COPY
l
-
,
, . , . - - - . .
,
,
,
.
- -.
..s.-
_.
.
J AN -1-51%i
. o
,
ConnecticutLYankee ' Atomic Power Company '3.
bec w/encli
. Region i Docket Room (with concurrences)
W. Kane, DRA (report detail 3.0)
J. Joyner, DRSS
A. Blough, DRP
L. Doerflein,-DRP
W. Raymond, SRI, Haddam Neck
P. Swetland, SRI, hiillstone
V. hicCree, OEDO
- A. Wang, Phi, NRk
_
- DRS/EB SALP Coordinator
R. De La Espriella, DRP
,
bec w/ Report Cover Sheet and Executive Summary only:
C. Hehl, DRP
J. Wiggins, DRP
1
W. Hodges, DRS
R. Cooper, DRSS
W.- Lanning, DRS
J. Durr, DRS
L. Bettenhausen, DRS
J, Stolz, NRR/PD l-4
D. Holody, EO
4
bI
h
YT
RI:DRP
RI:DRP
RI:DRP
..
.
R AYh10ND-
DOERFLEIN
BLOUGH'
L - 145/93
-1/ 4 93
1//p93
G:\\BR ANCH4\\HN92-21.RPT.
' OFFICIAL RECORD COPX
..
.
.
. _ _ _ _ _ _ _ - _ _