Forwards Insp Repts 50-456/85-15 & 50-457/85-16 on 850325-0503 & Notice of Violation.W/O Notice of Violation
ML20127H545
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/16/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20127H549 List:
References
NUDOCS 8505210326
Download: ML20127H545 (2)


See also: IR 05000325/2005003

Text

__

V

J 3

g4

IMAY 1 6 G85

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

A'ITN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. D. Schulz,

W. J. Kropp, and R. N. Gardner of this office on March 25 through May 3, 1935,

of activities at Braidwood Nuclear Power Station, Units 1 and 2, authorized by

'NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion

of our findings with Mr. M. Wallace and his staff at the conclusion of the

inspection.

.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in noncom-

p11ance_with NRC requirements, as described in the enclosed Appendix. With

respect to Item 4, the inspection showed that action had been taken to correct

the identified noncompliance and to prevent recurrence. Consequently, no

reply to this item of noncompliance is required and we have no further

questions regarding this matter at this time.

Regarding the remaining items, a written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosure (s) will be placed in the NRC's Public Document Room.

The responses directed by this letter (and the accompanying Notice).are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

p

G

k

u are.oi.

  • t

,

I

l

l

i

l

l

l

l

l

L

O

n, ,

Comonwealth Edison Company 2 W 1 6 G85

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,0rigir. .1 SUnzt by 11. 5. Lit.tla

W. S. Little, Director

Braidwood Project

Enclosures:

1. . Appendix, Notice of

Violation

2. Inspection Reports

No.50-456/85015DRP);

No. 50-457/85016 DRP)

cc w/encls:

D. L. Farrar, Director

of Nuclear Licensing '

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Station

Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk. (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, Rill Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel . dr. ,' Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

-H. S. Taylor,-Quality Assurance

Division

,

w

q

Pe ;e/cs Farber e1 L1'tde

05/15/85 g$

1

.._

  • 6

4

h

p

,

!

.'

\ -

q

5

1

]

f

N

t

9

, -. - . _ - - . . . , - , . . - - - - . . - - _ , , , , _ _ , - , - - - - ._r__,_ _ . -__,... _ _ _ _-- .,e _

-- ,. - . . . - - - .c,-.-- - - - - - . . - +-r--. ---