Forwards Insp Repts 50-313/85-14 & 50-368/85-14 on 850513-17.No Violation or Deviation Noted
ML20127H504
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/14/1985
From: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Jeffery Griffin
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20127H507 List:
References
NUDOCS 8506260360
Download: ML20127H504 (2)


See also: IR 05000313/1985014

Text

r

g

.

JUN 141985

In Reply Refer To:

Dockets: 50-313/85-14

50-368/85-14

Arkansas Power & Light Company

ATTN:

John M. Griffin, Senior

.Vice President - Energy Supply

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Boardman of this office

during the period May 13-17, 1985, of activities authorized by NRC Operating

License DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the

discussion of our findings with Mr. T. G. Campbell, and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included Arkansas Nuclear One ma.intenance

program and followup on previously identified items. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector. These

findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

The NRC inspector was impressed with the changes in the Arkansas Nuclear One

(AN0) maintenance program which have been implemented in the past year. When

AP&L completes projected improvements in this program and completes

identification, evaluation, and utilization of applicable vendor technical

information for maintenance in response to NRC Generic Letter 83-28, AN0 should

have a very good program for maintaining the design basis of a safety-related

structures, systems, and components.

8506260360 850614

PDR

ADOCK 05000313

G

PDR

RIV:SPES

SPES

RPB2/

RPB

JRBoardman;ap REIreland

LEMartin

DRHun er

5/ 31/85

5/3l/85

6///85

5/ll /85

O!

'

I

'

~

'

.

e -

- Arkansas Powerf & Light Company

-2-

Should you have any questions concerning this inspection, we will be pleased to

-discuss them with you.

Sincerely,-

". Original Signed By

. L E. MARTIN-

U."R. Hunter, Chief'

Reactor Project Branch 2

. Enclosure:

Appendix -'NRC Inspection Report

-50-313/85-14-

50-368/85-14

cc w/ enclosure:

. J.~M. Levine, General Manager

Arkansas Nuclear One

'

P.'0.. Box 608

Russellville, Arkansas 72801

Arkansas: Radiation Control Program Director

bcc_to DMB (IE01)_

bec distrib..by RIV:

- *RPB2

~

  • Resident Inspector

R. D. Martin, RA

  • EP&RPB
  • Section Chief (RPB2/A)
  • D. Weiss, LFMB (AR-2015)
  • RIV File

R. Denise, DRS&P

  • J.~ Boardman, SPES
  • MIS SYSTEM
  • RSTS Operator

RPB1

- *w/766

-

'k

%

<