Text
r
g
.
JUN 141985
In Reply Refer To:
Dockets: 50-313/85-14
50-368/85-14
Arkansas Power & Light Company
ATTN:
John M. Griffin, Senior
.Vice President - Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. J. R. Boardman of this office
during the period May 13-17, 1985, of activities authorized by NRC Operating
License DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the
discussion of our findings with Mr. T. G. Campbell, and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included Arkansas Nuclear One ma.intenance
program and followup on previously identified items. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector. These
findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
The NRC inspector was impressed with the changes in the Arkansas Nuclear One
(AN0) maintenance program which have been implemented in the past year. When
AP&L completes projected improvements in this program and completes
identification, evaluation, and utilization of applicable vendor technical
information for maintenance in response to NRC Generic Letter 83-28, AN0 should
have a very good program for maintaining the design basis of a safety-related
structures, systems, and components.
8506260360 850614
ADOCK 05000313
G
RIV:SPES
SPES
RPB2/
RPB
JRBoardman;ap REIreland
LEMartin
DRHun er
5/ 31/85
5/3l/85
6///85
5/ll /85
O!
'
I
'
~
'
.
e -
- Arkansas Powerf & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
-discuss them with you.
Sincerely,-
". Original Signed By
. L E. MARTIN-
U."R. Hunter, Chief'
Reactor Project Branch 2
. Enclosure:
Appendix -'NRC Inspection Report
-50-313/85-14-
- 50-368/85-14
cc w/ enclosure:
. J.~M. Levine, General Manager
Arkansas Nuclear One
'
P.'0.. Box 608
Russellville, Arkansas 72801
Arkansas: Radiation Control Program Director
bcc_to DMB (IE01)_
bec distrib..by RIV:
- *RPB2
~
- Resident Inspector
R. D. Martin, RA
- EP&RPB
- Section Chief (RPB2/A)
- D. Weiss, LFMB (AR-2015)
- RIV File
R. Denise, DRS&P
- J.~ Boardman, SPES
- MIS SYSTEM
- RSTS Operator
RPB1
- *w/766
-
'k
%
<