ML20127G902

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-423/85-21 on 850513-17.No Violation Noted
ML20127G902
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/13/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20127G908 List:
References
NUDOCS 8506260132
Download: ML20127G902 (2)


See also: IR 05000423/1985021

Text

, _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.9 ;

e-

.

JUN 131985

Docket No.- 50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

i

Subject: Inspection Report No. 50-423/85-21

This refers to the routine safety inspection conducted by Mr. N. Blumberg of

this office on May 13-17, 1985, at Millstone Nuclear Energy Station, Unit 3,

Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113 and

to the discussions of our findings held by Mr. Blumberg with Mr. D. Miller and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Origirm1 Signed Ey:

Leo !!.1. lot.t ontmtsen

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-423/85-21

\

$,

i

8506260132 850613

PDR ADOCK 05000423

G PDH

OFFICIAL RECORD COPY IR MILLSTONE 3 85-21 - 0001.0.0

} 05/31/85

p.

.

.

Northeast Utilities Co. 2

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D.-0.-Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

E. McCabe, Chief, Section #3B #3, DRP

G. Walton, SRI, Beaver Valley Unit 2

,

i

i

RI:0RS RI:DRS RI:DRS

Blumberg/fi Bettentaus9n Ebneter

j

{ O'h

L Jll(9 \

(%

l OFFICIAL RECORD COPY IR MILLSTONE 3 85-21 - 0003.0.0

05/31/85