Text

.

June 13, 1985 Docket Nos. 50-348 Distribution iDisi:li$$Ethe,il and 50-364 NRC PUR L PDR ORB #1 RDG Gray file HThompson OELD EJordan JPartlow Mr. R. P. Mcdonald bGrimes EReeves(2)

Senior Vice President CParrish ACRS(10)

Alabama Power Company NMerriweather Post Office Box 2641 Birmingham, Alabama 35291

Dear Mr. Mcdonald:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - ITEM 3.2.2 0F GENERIC LETTER 83-28 JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 We have completed a preliminary review of your letters dated September 6 '

and November 4,1983, and February 6 and 15, and June 25, 1984 in response to Generic Letter (GL) 83-28 " Required Actions Based on Generic Implications of Salem ATWS Events." The review was performed to assess the completeness and adequacy of your response to GL 83-28, Items 3.1.1, 3.1.2, 3.2.1, 3.2.2, 4.1 and 4.5.1. For the Farley Units, your response to Item 3.2.2 was found to be incomplete.

Brief descriptions of the deficiencies are given as guidelines for corrective action in the enclosure. In order to maintain our present review schedule, you are requested to provide supplementary information within 30 days of receipt of this letter.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

/s/SAVarga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page ORB #1:DL ORB #1- 1:0L CParrish EReeves/ts ar 06/ 6 85 06//j/85 06 5 0506260066 050613 PDR ADOCK 05000348 P ppg

"g #'**

&j# UNITED STATES f )*( k,y

~

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

[ June 13, 1985 Docket Nos. 50-348 '

and 50-364  :

Mr. R. P. Mcdonald Senior Vice President Alabama Power Company Post Office Box 2641 Binningham, Alabama 35291

Dear Mr. Mcdonald:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - ITEM 3.2.2 0F GENERIC LETTER 83-28 JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 A

We have completed a preliminary review of your letters dated September 6 and November 4,1983, and February 6 and 15, and June 25, 1984 in response to Generic Letter (GL) 83-28 " Required Actions Based on Generic Implications of Salem ATWS Events." The review was performed to assess the completeness and 4 adequacy of your response to GL 83-28, Items 3.1.1, 3.1.2, 3.2.1, 3.2.2, 4.1

' and 4.5.1. For the Farley Units, your response to Item 3.2.2 was found te be incomplete.

' Brief descriptions of the deficiencies are given as guidelines for corrective action in the enclosure. In order to maintain our present review schedule, you are requested to provide supplementary infonnation within 30 days of receipt of this letter.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OM8 clearance is not required under P.L.96-511.

Sincerely, fi

,c en L Va' Operating Reactor anch #1 Division of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page

1

  • Mr. R. P. Mcdonald Alabama Power Company Joseph M. Farley Nuclear Plant CC:

Mr. W. O. Whitt D. Biard MacGuineas!.. Esquire Executive Vice President Volpe, Boskey and Lyons Alabama Power Company 918 16th Street, N.W.

Post Office Box 2641 Washington, DC 20006 Birmingham, Alabama 35291 Charles R. Lowman Mr. Louis B. Long, General Manager Alabama Electric Corporation Southern Company Services, Inc. Post Office Box 550 Post Office Box 2625 Andalusia, Alabama 36420 Birmingham, Alabama 35202 Chairman Houston County Comission Regional Administrator, Region II Dothan, Alabama 36301 U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge Ira L. Myers, M.D.

1800 M Street, N.W. State Health Officer Washington, DC 20036 State Department of Public Health State Office Building Montgomery, Alabama 36130 Robert A. Buettner, Esquire Balch, Bingharr, Baker, Hawthorne, Williams and Ward

' Post Office Box 306 Birtningham, Alabama 35201 Resident Inspector U.S. Nuclear Regulatory Comission Post Office Box 24 - Route 2 Columbia, Alabama 36319 State Department of Public Health ATTN: State Health Officer State Office Building Montgomery, Alabama 36104 f

(

E_NCLOSURE

)

~ ~ ~

REQUEST FOR ADDITIONAL INFORMATION --

GENERIC LETTER 83-28 FARLEY UNITS 1 AND 2 Item 3.2.2 - Incomplete The licensee has not perfonned a review of vendor and engineering recomendations as required by Generic Letter (GL) 83-28. This review is to ensure that approp-riate vendor and engineering test guidance is included in the test and mainte-nance procedures or the Technical Specifications. The ifcensee needs to perform the above review as required by GL 83-28 and submit a statement confinning that Action Item 3.2.2 has been implemented.