RO:730120,emergency Diesel Generator Could Not Be Started Manually on Starting Sys 1.Caused by Air Vanes of Lower Motor Sticking in Rotor Slots
ML20127G533
Person / Time
Site: Monticello 
Issue date: 02/07/1973
From: Mayer L
NORTHERN STATES POWER CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9211170352
Download: ML20127G533 (1)


Text

_ _ _ _

Ren%ry File Cy.

~

NSIB a

NORTHERN STATE 5 POWER COMPANY (j p '

Minneapoli s, Minnesota 55401

[

pk h'5)

February 7,1973 fcn Q

7 4 {J'.,k!i.';s i,

((

4 KL.

t Lt >

'bs.

fy pocrtito p

uwc 0<s FEB201973. i: -

Mr. A. Giambusso

-1 '. 3 2 0 1973 "

p u, m..., m,

y, Deputy Director for Reactor ProjectsUnited States Atomic Energy Commission @\\'\\

gg Q*g*i menf}

wnd, g

tmEI G4 g

\\,p) N I N Washington, D. C. 20545

Dear Mr. Giambusso:

f.ONTl CELLO NUCLEAR GENERATIiJG PLANT Docket No. 50-263 License No. DPR-22 Failure of #1 Starting Systm nf #12 Diesel Generator A condition occurred at the Monticello Nuclear Generating Plant which we are reporting to your nffice in accordance with Section 6.6.D.1 of the Technical Specifications, of Provisional Operating License DPR-22.

On January 20, 1973, during routine surveillance testing, the No.12 Emergency Diesel Generator could not be started manually on the #1 starting system.

The

  1. 2 starting systan was then selected and the engine successfully started.

Observation of the #1 starting systen indicated that the starting motors were receiving air but were not cranking the engine.

Both air motors of the #1 starting systm were runoved from The engine and inspected. The air vanes of the lower motor were found to be sticking in the rotor slots. The lower starter motor was replaced with a spare. The upper motor was found to be in good cond-ition.

Followin started by the #g re-installation of the motors, the engine was successfully 1 starting systan.

It should be noted that the malfunction of the No. I starting systm would not have prevented an automatic diesel start since both starting systuns are utilized in the automatic start sequence.

The runaining starting motors on #12 diesel and all the starting motors on #11 diesel were checked to verify free operation of the vanes by manually rotating the starter motors.

In all cases free operation was verified.

Yours very truly,

. d. #&

L. O. Mayer, PF Director of Nuclear Support Services LOM/mmm cc:

B H Grier G Clurnoff 11g Minnesota Pollution Control Agency - Attn:

Ken Dzugan 9211170352 730207 PDR ADOCK 05000263 0