ML20127G264
| ML20127G264 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, Catawba, McGuire |
| Issue date: | 01/13/1993 |
| From: | Tuckman M DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20127G266 | List: |
| References | |
| NUDOCS 9301210201 | |
| Download: ML20127G264 (11) | |
Text
il I
Duke heer Compey AtS 7trtuts Catmeba Nuckar C<rwratwa ikpartment Hre Frenderit Uno Conwr1 Road 15n3)%11-3205 Ofike
)vrk.bcl2745 (803)&113426 h t DUKE POWER L
January 13, 1993 2
U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C.
20555
't
Subject:
Catawba Nuclear Station Docket Nos. 50-413 and 50-414 4
McGuire Nuclear Station 4
Docket Nos. 50-359 and 50-370 Technical Specification Amendment Relocation of Cycle-Specific Parameter Limits Attached are changes to the Catawba and McGuire Nuclear Station Technical Specifications which relocate certain cycle-specific parameter limits to the Core Operating Limits Report (COLR).
Since the changes for McGuire and Catawba are virtually identical, they are being submitted together in an effort to conserve resources.
As discussed in the technical justifications, amendment 74 and 68 for Catawba Units 1 and 2, and amendment 105 and 87 for McGuire Units 1 and 2 revised the Technical Specifications to replace the values of certain cycle-specific parameter limits with a reference to the COLR.
Since the time of these amendments, additional cycle-specific parameters have been identified in cupport of cycle operation and reload design.
Similar changes have been submitted and approved in a safety evaluation dated September 16, 1991 for Oconee Nuclear Station.
' contains the marked up Technical Specification pages, sample COLR, technical justification and No Significant Hazards Analysis for Catawba.
Attachment 2
contains the marked up Technical Specification
- pages, sample
- COLR, technical justification,-and No Significant Hazards Analysis for McGuire.
Pursuant to 10 CFR 50.91 (b) (1), the appropriate South Carolina and 4
North Cart., lina officials are being provided a copy of this amendment request.
190016 9301210201 930113 PDR ADOCK 05000369 P
PDR 6
i
U.
S. Nuclear Regulatory Commission January 13, 1993 Page 2-Approval of this amendment is needed for McGuire Nuclear Station by June 1, 1993 to allow the Unit 1 Cycle 9 Reload to be done under 50.59, otherwise this reload will require changes to the Technical Specifications.
Very truly yours, (5l[\\t
~
M. S. Tuckman Attachments
...~ _ _..
1 4
U.
S. Nuclear Regulatory Commission January 13, 1993-Page 3 4
xc:
Mr. S. D.
Ebneter i
Regional Administrator, Region II U.
S. Nuclear Regulatory Commission i
101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323 i
{
Mr. Heyward Shealy, Chief Bureau of Radiological Health South Carolina Department of Health &
Environmental Control 2600 Bull Street Columbia, SC 29201 American Nuclear Insurers c/o Dottie Sherman, ANI Library 4
]
The Exchange, Suite 245 270 Farmington Avenue l
Farmington, CT 06032 M & M Nuclear Consultants l
1166 Avenue of the Americas New York, NY 10036-2774 Mr. W. T. Orders i
NRC Resident Inspector Catawba Nuclear Station i
Mr.
K.
P. VanDoorn
{
NRC Resident Inspector i
McGuire Nuclear Station Mr. R.
E. Martin Office of Nuclear Reactor Regulation j
U.
S. Nuclear Regulatory Commission One White' Flint North, Mail Stop 14H25 Washington, D.C.
20555 Mr.
T. A.
Reed Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission One White Flint North, Mail Stop 14H25 Washington, D.C.
20555 Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Services 701 Barbour Drive Raleigh, North Carolina 27603-2008
4 1
U. S. Nuclear Regulatory Commission January 13, 1993 j
Page 4' M. S. Tuckman, being duly sworn, states that-he is Vice President, Catawba Nuclear. Station; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory' Commission this revision to the Catawba and McGuire Nuclear Station Technical Specifications,-Appendix A to_' License Nos. NPF-35, NPF-52, NPF-9,-
and NPF-17; and that all statements and matters' set forth therein are true and correct to'the best of his knowledge.
MW i
~M S. Tuckman Subscribed and sworn to'before me-this I3*
day of tIV.
1993.
I Gimw1/ 0ra]m i
Not)ftry Public V i
My Commission Expires:
A W,v7l 2000 4
i a
f a
4 1
j 4
i i!-
Catawba Facility Operating License amendment numbers 74 and 68 dated May 17, 1990 for. units:1 and 2 respectively, revised the Catawba 2
Technical Specifications to replace the values of certain cycle-specific parameter limits with a-reference to the Core Operating Limits Report (COLR), which contains the values of the limits.
- However, additional existing cycle-specific parameter limits in the Catawba Technical Specifications, not included in the above amendments, have been revised due to changes in these parameters in support of Unit 2 Cycle 6 operation and reload design.
Similar limits have also changed i
in recent McGuire fuel cycles.
In addition, McGuire Facility Operating License amendment numbers 105 and 87 dated March 15, 1990 for units 1 i
and 2 respectively, revised the McGuire Technical Specifications to incorporate an identical COLR methodology.
Therefore, in order to
{
simplify Imc review of identical Technical Specification revision proposals, it is proposed that the McGuire Technical Specifications be l
changed identically with respect to the applicable item relocations to the COLR.
Recent instances where one or more of these limits has been a
changed in a Technical Specification revision proposal include McGuire 1 Cycle 8. McGuire 2 Cycle 8, Catawba 1 Cycle 7, and Catawba 2 Cycle 5.
i In recognition of the burden on licensee and NRC resources associated with changes to Technical Specifications, the NRC issued Generic Letter i
88-16 on October 4, 1988 encouraging licensees to propose changes to j
Technical Specifications that are consistent with the guidance provided in the enclosure to the generic letter.
This enclosure provides guidance for the preparation of a license amendment request to modify Technical Specifications that have cycle-specific parameter limits.
With the implementation of this alternative the imC concluded that reload license amendments for the sole purpose of updating cycle i
specific parameter limits would be unnecessary.
The proposed revisions f
described in tables 1-4 would relocate the cycle-specific parameter limits from the Catawba and McGuire Technical Speciiications in accordance with the guidance provided in the enclosure to Generic Letter 88-16.
t 4
e j.
f 1-1 i
.-..-, - = -
~
Catawba Facility Operating License amendment numbers 74 and 68-dated May 17, 1990 for units 1 and 2 respectively, revised the Catawba Technical Specifications to replace the values of certain cycle-specific parameter limits with a= reference to the Core Operating' Limits-Report (COLR), which contains the values of the limits,
- However, additional existing cycle-specific parameter limits in the Catawba Technical Specifications, not included in the above amendments. have been revised due to changes in these parameters in support of Unit 2 '
Cycle 6 operation and reload design.
Similar. limits have also changed-in recent McGuire fuel cycles.
In addition ~, McGuire Facility Operating License amendment numbers 105 and 97 dated March 15, 1990 for units 1 and 2 respectively, revised the McGuire Technical Specifications to incorporate an' identical COLR methodology. Therefore, in order to simplify NRC review of identical Technical _ Specification' revision proposals, it is proposed that the McGuire Technical Specifications be
. g changed identically with respect to the applicable item relocations to i
the COLR. Recent instances where one or more of these limits has been changed in a Technical Specification revision proposal include McGuire 1 Cycle 8, McGuire 2 Cycle 8. Catawba 1 Cycle 7,;and Catawba 2. Cycle 5.
In recognition of the burden on licensee and NRC resources associated with changes to Technical Specifications, the NRC issued Generic Letter 88-16-on October 4, 1988 encouraging licencees to propose changes to Technical Specifications that are consistent with the guidance provided in the enclosure to the generic letter. This enclosure provides guidance for the preparation of a license amendment: request to modify Technical Specifications that have cycle-specific parameter-limits.
With the implementation of this alternative the NRC concluded that reload license amendments for the sole purpose of updating cycle specific parameter limits would be unnecessary. The proposed revisions described in tables 1-4 would relocate the cycle-specific parameter limits from the Catawba and McGuire Technical Specifications in accordance with the guidance provided in the enclosure to Generic Letter 88-16.
l-1
i i
4 Table 1 Summary of Catawba Technical Specification Changes Frecification Descrirtion of Chance i
moved OTAT and OPAT numerical values to COLR 2.2.1 j
3/4.1.2.5 moved volume and boron concentration limits for the Boric Acid Storage System and RWST to the COLR revised pH range in the bases l
l 3/4.1.2.6 moved volume and boron concentration limits for the l
Boric Acid Storage System and RWST to the COLR 3/4.3.3.12 moved Reactor Makeup Water Pump flowrate limits to the COLR f
f 3/4.5.1 moved boron concentration limits for cold leg accumulator to the COLR e
8 3/4.5.4 moved boron concentration limits for the RWST to the COLR revised pH range in the bases 4
3/4.9.2 moved Reactor Makeup Water Pump flowrate limits to the COLR i
1 4
i s
I l-2
Table 2 Summary of Catawba Core Operating Limita Report Changes Snecification Dascrintien of Chance 2.2.1 moved TS OTAT and OPAT numerical values to COLR 3/4.1.2.5 moved TS volume and boron concentration limits for the Boric Acid Storage System and RWST to the COLR 3/4.1.2.6 moved TS volume and boron concentration limits for the Boric Acid Storage System and RWST to the COLR 3/4.3.3.12 moved TS Reactor Makeup Water Pump flowrate limits to the COLR 3/4.5.1 moved TS boron concentration limito for cold leg accumulator to the COLR 3/4.5.4 moved TS boron concentration limits for the RWST to the COLR 3/4.9.2 moved TS Reactor Makeup Water Pump flowrate limits to the COLR t
l l
l-3 l
i
(
s Table 3 l
Summary of McGuire Technical Specification Changes Srecification Descrirtion of Chance 4
2.2.1 moved OTAT and OPAT numerical values to COLR, corrected typographical error in the OPAT equation l.
3/4.1.2.5 moved volume and boron concentration limits for the Boric Acid Storage System and RWST to the COLR clarified volume allowances and revised pH range in the bases 4
3/4.1.2.6 moved volume and boron concentration limits for the Boric Acid Storage System and RWST to the COLR clarified volume allowances in the bases 3/4.5.1 moved boron concentration limits for cold leg accumulator to the COLR deleted requirement to use three limiting accumulators in weighted average boron concentration deleted statement referring to the UHI system from the bases 3/4.5.5 moved boron concentration limits for the RWST to the COLR revised pH range in the bases t
i a
1-4
Table 4 Summary of McGuire Core Operating Limits Report Changes Soecificaticn Descriotion of chance 2.2.1 moved TS OTAT and OPAT numerical values to COLR 3/4.1.2.5 moved TS volume and boron concentration limits for the Boric Acid Storage System and RWST to the COLR 3/4.1.2.6 moved TS volume and boron concentration limits for the Boric Acid Storage System and RWST to the COLR 3/4.5.1 moved TS boron concentration limits for cold leg accumulator to the COLR 3/4.5.5 moved TS boron concentration limits for the RWST to the COLR l5
1 I
l r
i i
i S
p I
i 1
i i
i
-.,