Forwards Insp Repts 50-327/85-13 & 50-328/85-13 on 850325-29 & Notice of Violation
ML20127F838
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/03/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris A, Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20127F841 List:
References
NUDOCS 8505200605
Download: ML20127F838 (2)


See also: IR 05000327/1985013

Text

- __ _ _ -

'

,

MM 0 31986

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power and Engineering

500A Chestnut Street Tower II

Chattancoga, TN 37401

Gentlemen:

SUBJECT: REPORT NOS. 50-327/85-13 AND 50-328/85-13

On March 25-29, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-77 and DPR-79 for your Sequoyah facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Redt ' ion Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Roger D. Walker

Roger D. Walker, Director

Division of Reactor Projects

Enclosures: (See page 2)

0505200605 050503

DR ADOCK 0500 7 7 (

_--

. . . _ _

, Ten,nessee Valley Authority 2

Enclosures:

1. Notice of Violation

2. Inspection Report Nos. 50-327/85-13

and 50-328/85-13

cc w/encis:

H. L. Abercrombie, Sequoyah Nuclear Plant

Site Director

P. R. Wallace, Plant Manager

J. W. Anderson, Manager

Office of Quality Assurance

K. W. Whitt, Chief, Nuclear Safety Staff

D. L. Williams, Jr. , Supervisor

Licensing Section

J. E. Wills, Project Engineer

i

bec W/encis:

NRC Resident Inspector

Document Control Desk

State of Tennessee

,

u

RII@q

RIIg3 I/ , RII

t{

-

RII

as,

RII

RII

w

RMarst.on:bhg WCline Collins JPStohr Algndtonis SWeise DVerrelli

4/Q/85 4/Q/8 4//}/85 4/ /85 g/ / /85 g// /85 4/ /85

aiu~

+{26

s

4g/5