3F0193-09, Forwards Revised Monthly Operating Rept for Nov 1992 for Crystal River Unit 3,updating Items 11 Through 13 of Operating Data Rept

From kanterella
(Redirected from ML20127F750)
Jump to navigation Jump to search
Forwards Revised Monthly Operating Rept for Nov 1992 for Crystal River Unit 3,updating Items 11 Through 13 of Operating Data Rept
ML20127F750
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/12/1993
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127F753 List:
References
3F0193-09, 3F193-9, NUDOCS 9301210013
Download: ML20127F750 (1)


Text

.

o e*

Florida Power COnPORATION Crystal FUver UnN 3 Dodet No. "A"02 January 12, 1993 3f0193-09 Document Control Desk U. S. Nuclear Regulatory Conunission Washington, DC 20555 Subject, Monthly Operating Report Revision

Dear Sir:

Attached is a revision to the Crystal River Unit-3 November 1992 Monthly Operating Report (MOR). This submittal updates items 11 through 23 of the Operating Data Report, however, all pages of the MOR are included for your convenience.

Sincerely, h

G. L.

oldt Vice President Nuclear Production GLB:JBC/ff Attachment xc:

Regional Administrator, Region 11 Senior Resident inspector NRR Project Manager ost p#r I

20000i

/

9301210013 93011g

\\\\

l PDR ADOCK 05000302 R

PDR

--