3F0193-09, Forwards Revised Monthly Operating Rept for Nov 1992 for Crystal River Unit 3,updating Items 11 Through 13 of Operating Data Rept

From kanterella
(Redirected from 3F0193-09)
Jump to navigation Jump to search
Forwards Revised Monthly Operating Rept for Nov 1992 for Crystal River Unit 3,updating Items 11 Through 13 of Operating Data Rept
ML20127F750
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/12/1993
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127F753 List:
References
3F0193-09, 3F193-9, NUDOCS 9301210013
Download: ML20127F750 (1)


Text

.

o e*

Florida Power COnPORATION Crystal FUver UnN 3 Dodet No. "A"02 January 12, 1993 3f0193-09 Document Control Desk U. S. Nuclear Regulatory Conunission Washington, DC 20555 Subject, Monthly Operating Report Revision

Dear Sir:

Attached is a revision to the Crystal River Unit-3 November 1992 Monthly Operating Report (MOR). This submittal updates items 11 through 23 of the Operating Data Report, however, all pages of the MOR are included for your convenience.

Sincerely, h

G. L.

oldt Vice President Nuclear Production GLB:JBC/ff Attachment xc:

Regional Administrator, Region 11 Senior Resident inspector NRR Project Manager ost p#r I

20000i

/

9301210013 93011g

\\\\

l PDR ADOCK 05000302 R

PDR

--