3F0193-09, Forwards Revised Monthly Operating Rept for Nov 1992 for Crystal River Unit 3,updating Items 11 Through 13 of Operating Data Rept
(Redirected from 3F0193-09)
Jump to navigation
Jump to search
| ML20127F750 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/12/1993 |
| From: | Boldt G FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20127F753 | List: |
| References | |
| 3F0193-09, 3F193-9, NUDOCS 9301210013 | |
| Download: ML20127F750 (1) | |
Text
.
o e*
Florida Power COnPORATION Crystal FUver UnN 3 Dodet No. "A"02 January 12, 1993 3f0193-09 Document Control Desk U. S. Nuclear Regulatory Conunission Washington, DC 20555 Subject, Monthly Operating Report Revision
Dear Sir:
Attached is a revision to the Crystal River Unit-3 November 1992 Monthly Operating Report (MOR). This submittal updates items 11 through 23 of the Operating Data Report, however, all pages of the MOR are included for your convenience.
Sincerely, h
G. L.
oldt Vice President Nuclear Production GLB:JBC/ff Attachment xc:
Regional Administrator, Region 11 Senior Resident inspector NRR Project Manager ost p#r I
20000i
/
9301210013 93011g
- Florida Progress Company
\\\\
l PDR ADOCK 05000302 R
--