SUMMARY
OF OPERATIONS MAY, 1985 There were no unit shutdowns or significant' power reductions during the month of May. On 5-24-85 and 5-28-85, the atmospheric relief valve for the 2A main steam line failed open due to the failure of a NTD card. The atmospheric relief valve was closed manually. The NTD card was replaced and calibrated.
The following major safety-related maintenance was performed in the.
month of May:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
2.
The atmospheric relief valve for the 2A main steam line was repaired by replacing a NTD card.
t
twe):
829
- 5. Design Electrical Ratmg (Net StWe):
850.2
- 6. Sf aximum Dependable Capacity (Gross SlWe):
80 7.2 7 Staximum Dependable Capacity (Net atWei:
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To which Restricted,if Any tNet 5tWe): N/A
- 10. Reasons For Restnctions. If Any:
N/A 9
!V This 31onth Yr.-to Date Cumularise
- 11. Hours In Reportmg Penod 744 3.623 31.648
- 12. Number Of Hours Reactor Was Critical 744.0 1,843.8 28,762.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 744.0 1,799 28,377.I
- 14. Hours Generator On-Line
- 15. Unit Resene Shutdown Hours 0.0 0.0 0.0 1,925,137 4,395,160 71,247,908
- 16. Gross The mal Ener;y Generated (5tWH) 642,088 1,459.508 23,405,790
- 17. Gross Electrical Energy Generated tilhH) 612,000 1,362,472 22,181,394
- 18. Net Electrical Energy Generated thtWH)
- 19. Unit Senice Factor 100.0 49.7 84.3 100.0 49.7 84.3
- 20. Unit Availability Factor 101.9 46.6 81.4
- 21. Unit Capacity Factor s Using %!DC Net
- 22. Unit Capacity Factor iUsing DER Net) 99.2 45.4 79.5 0.0 1.6 5.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Ntonths tType. Date.and Duration of Each t:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation 1:
Forecast Achiesed INITIA L CRITICALITY 05-06-81 05-08-81 b
INITIAL ELECTRICITY 05-24-81 05-25-81 08-01-81 07-30-81 CO3titERCI A L OPER AT10N erp
}
DOCKET 240.
sn m 2
L74tT-DATI 6-7-85 J.D.Woodard COMPLETED BY
~nO TELE?!!ONE (709 899-5156
.tlCNT11 Mav, 1985
-DAY AVERACE DAILY F0WER LEVEL DAY AVERACE D AILY PCWER LEVEL (Mbe-Neil (31We Net) 827 17 824 2
824 13 826 825~
825 3
.g9 828 822 4
- .a 5
826 21 gig 824 822 6
n 7
3 819 824 3
822
- 4 g?4 9
823
- ag 829 10 822 26 824 823 27 826 11 1,
820 822 13 819 29 R91 818 14 30 820 15 816 3g gi7
'16 823 CCTTRt:CTION5 Cn tfus form::. li:: the :ver:ge d:siy unit power !:velin MWe Met for e:ch d:y in the reporting inunth. Campute to
, it: ne:re:t whcie :re;: watt.
1 (9/77)
O
+
O O
O
=
UNirSilulDOWNS ANI) POWER RElHICilONS IM)CKET NO. 50'-364 UNIT NAhlE J.M.Farley-Unit 2-1)AIE 6-7-85 1
HEPOR l' AIONill _ May.1985 COMPl.E1En ny J.D.Woodard IEl.1 PilONE (205)899-5156 w.
g u5 11 c
r.
. No.
Date E. -
f_I
? S3 IN'"*"
b'.
kl Cause i Cau sei.sive
~
?1 U
E5*
h " "'
5,3 gOS Action in o$
g gy, g Repose u p,p,,, gcc,,rcnce in v M
4 6
THERl:
WERE NO UNIT S IUTD0t< NS OF SIGNIFICANT POWEB REDUCTIO' iS DURING THE MON 1110F MAY..
f 4
4 r
I 2
3 I
F: Forted Reason:
Method; Eajat,is G. Innesuctions,
. S; Sibeduled A fquipinent Fa:Iure(Explain) l klanual for Picparation of Data it hiaintenance of Tes 2%nnat Serain.
I:nsey Sheets for 1i cuss C.Hefochng 3 Autonutic Scram.
Evens Rep.us (I.ER) FileINUREG-11 Hegulatiny Resniction 4 Othes (Emplain) 0161) l Opesaso Training A licena: Exaniination F AJ oinistrasive
- ~
i-G Opciational Esson (Emplain) 5 INinbit I Same Source
,1 (9/77) ll Othei (Emplain) w
P Mailing Address a
A;abama Power Company g
600 Morth 18th Street Pest Office Box 2641 Birmingham. Alabama 35291 Tetephone 2C5 783-6090 R. P. Mcdonald Senor Vice President Fhntndge Bwiding
/kl[lf)[l[Ililh0WCf June 12, 1985 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the May 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.
If you have any questions, please advise.
Yours very G)/]( ",
t 1
R. P. Mcdonald RPM /KWM: sam Enclosures xt: Director, IE (10 copies)
, Director, RII (1 copy) 4*
e i
Y t