JOSEPH M. FARLEY NUCI. EAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS MAY, 1985 There were no unit shutdowns or significant' power reductions during the month of May. On 5-24-85 and 5-28-85, the atmospheric relief valve for the 2A main steam line failed open due to the failure of a NTD card. The atmospheric relief valve was closed manually. The NTD card was replaced and calibrated.

The following major safety-related maintenance was performed in the.

month of May:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

2.

The atmospheric relief valve for the 2A main steam line was repaired by replacing a NTD card.

t

twe):

829

5. Design Electrical Ratmg (Net StWe):

850.2

6. Sf aximum Dependable Capacity (Gross SlWe):

80 7.2 7 Staximum Dependable Capacity (Net atWei:

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Lesel To which Restricted,if Any tNet 5tWe): N/A
10. Reasons For Restnctions. If Any:

N/A 9

!V This 31onth Yr.-to Date Cumularise

11. Hours In Reportmg Penod 744 3.623 31.648
12. Number Of Hours Reactor Was Critical 744.0 1,843.8 28,762.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 744.0 1,799 28,377.I
14. Hours Generator On-Line
15. Unit Resene Shutdown Hours 0.0 0.0 0.0 1,925,137 4,395,160 71,247,908
16. Gross The mal Ener;y Generated (5tWH) 642,088 1,459.508 23,405,790
17. Gross Electrical Energy Generated tilhH) 612,000 1,362,472 22,181,394
18. Net Electrical Energy Generated thtWH)
19. Unit Senice Factor 100.0 49.7 84.3 100.0 49.7 84.3
20. Unit Availability Factor 101.9 46.6 81.4
21. Unit Capacity Factor s Using %!DC Net
22. Unit Capacity Factor iUsing DER Net) 99.2 45.4 79.5 0.0 1.6 5.2
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Ntonths tType. Date.and Duration of Each t:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation 1:

Forecast Achiesed INITIA L CRITICALITY 05-06-81 05-08-81 b

INITIAL ELECTRICITY 05-24-81 05-25-81 08-01-81 07-30-81 CO3titERCI A L OPER AT10N erp

}

DOCKET 240.

sn m 2

L74tT-DATI 6-7-85 J.D.Woodard COMPLETED BY

~nO TELE?!!ONE (709 899-5156

.tlCNT11 Mav, 1985

-DAY AVERACE DAILY F0WER LEVEL DAY AVERACE D AILY PCWER LEVEL (Mbe-Neil (31We Net) 827 17 824 2

824 13 826 825~

825 3

.g9 828 822 4

.a 5

826 21 gig 824 822 6

n 7

3 819 824 3

822

4 g?4 9

823

- ag 829 10 822 26 824 823 27 826 11 1,

820 822 13 819 29 R91 818 14 30 820 15 816 3g gi7

'16 823 CCTTRt:CTION5 Cn tfus form::. li:: the :ver:ge d:siy unit power !:velin MWe Met for e:ch d:y in the reporting inunth. Campute to

, it: ne:re:t whcie :re;: watt.

1 (9/77)

O

+

O O

O

=

UNirSilulDOWNS ANI) POWER RElHICilONS IM)CKET NO. 50'-364 UNIT NAhlE J.M.Farley-Unit 2-1)AIE 6-7-85 1

HEPOR l' AIONill _ May.1985 COMPl.E1En ny J.D.Woodard IEl.1 PilONE (205)899-5156 w.

g u5 11 c

r.

. No.

Date E. -

f_I

? S3 IN'"*"

b'.

kl Cause i Cau sei.sive

~

?1 U

E5*

h " "'

5,3 gOS Action in o$

g gy, g Repose u p,p,,, gcc,,rcnce in v M

4 6

THERl:

WERE NO UNIT S IUTD0t< NS OF SIGNIFICANT POWEB REDUCTIO' iS DURING THE MON 1110F MAY..

f 4

4 r

I 2

3 I

F: Forted Reason:

Method; Eajat,is G. Innesuctions,

. S; Sibeduled A fquipinent Fa:Iure(Explain) l klanual for Picparation of Data it hiaintenance of Tes 2%nnat Serain.

I:nsey Sheets for 1i cuss C.Hefochng 3 Autonutic Scram.

Evens Rep.us (I.ER) FileINUREG-11 Hegulatiny Resniction 4 Othes (Emplain) 0161) l Opesaso Training A licena: Exaniination F AJ oinistrasive

~

i-G Opciational Esson (Emplain) 5 INinbit I Same Source

,1 (9/77) ll Othei (Emplain) w

P Mailing Address a

A;abama Power Company g

600 Morth 18th Street Pest Office Box 2641 Birmingham. Alabama 35291 Tetephone 2C5 783-6090 R. P. Mcdonald Senor Vice President Fhntndge Bwiding

/kl[lf)[l[Ililh0WCf June 12, 1985 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the May 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.

If you have any questions, please advise.

Yours very G)/]( ",

t 1

R. P. Mcdonald RPM /KWM: sam Enclosures xt: Director, IE (10 copies)