Forwards Exam Rept 50-293/92-22OL During Wk of 921116.Nine of 10 Applicants Passed Initial Exam & Both Licensed Operators Passed Requalification Retake Exams
ML20127E750
Person / Time
Site: Pilgrim
Issue date: 01/13/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Richard Anderson
BOSTON EDISON CO.
Shared Package
ML20127E754 List:
References
RTR-NUREG-1021 NUDOCS 9301200034
Download: ML20127E750 (4)


See also: IR 05000293/1992022

Text

-_

_ _ - _ - _ - _ _ _ _ _ _ _

_ _ _ _

__

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

..

y(>

l

l

JAN 131993

Docket No. 50 293

hir Itoy A. Anderson

Senior Vice President Nuclear

Iknton Iklison Company

l'ilgrim Nuclear Power Station

itFD #1, Itocky llill lload

Plymouth, hiassachusetts 02360

Dear hir Davis.

SUlui!CT: liXAh11 NATION llliPOllT NO. 50-293/92-22 (01.)

During the week of November 16, 1992, the NltC administered initial examinations to

employees of your company who had applied for licenses to operate the Pilgrim Nuclear

Power Station. The NltC also administered requalification retake examinations to two

licensed operators that did not pass the NitC administered examinations administered in

h1ay 1992. At the conclusion of the examinations, the preliminary lindings were discussed

with those members of yom staff identified in the enclosed report.

Nine of ten applicants passett the initial examination and both licensed operators passed the

requalification retake examinations. The examinees were well p;cpared for the examinations.

Your staff is commended for their cooperation during the examination preparation and

administration. Section 3.0 of the enclosed report contains additional details of the applicants

performance and the NitC examiners' observations.

'_

in accordance with 10 CFit 2.790 of the Commission's regulations, a copy of this letter and

its enclosure will be placed in the NltC Public Document Itoom.

Should you have any questions regaiding this information, please contact Itichard Conte at

(215) 337-5210.

Sincerely,

1.ce 11. llettenhausen, Chief

Operations liranch

Division of itcactor Safety

930120003Q g jog 393

PDR

ADOC

PDR

OFFICI AL 1111C011D COPY

G:PILGliXht.llPT

\\\\

"

/E h

.

_

-

_

_

__.____ _ _

!

i

Mr. Roy A. Anderson

2

linclosure: lixamination lleport No. 50-293/92 22 (OL) w/Attaciunents 1 - 6

iI

Attachments:

1. Persons Contacted

,

2. RO 11xamination and Answer Key

j

3. SRO lixamination and Answer Key

4. Facility Comments on Written lixaminations (w/o references)

5. NRC Resolution of Facility Comments

'

6. Simulation Facility Report

!

cc w/ encl.; w/o Attachments 1 - 6:

11.130ulette, Vice President, Nuclear Operations ana ...ation Director

II Kraft, Plant Manager

V. Oheim, Manager, Regulatory Affairs Department

i

D. Tarantino, Nuclear information Manager

N. Desmond, Compliance Division Manager

R. Itallisey, Department of Public Ile;dth, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

The lionorable lidward M. Kennedy

The lionorable John F. Kerry

.

The lionorable IIdward J. Markey

The lionorable Ildward P. Kirby

-

The lionorable Peter V. Forman

!

lirian Abbanat, Department of Public Utilities

Chairman, Plymouth floard of Selectmen

Chairman, Duxbury lloard of Selectmen

Plymouth Civil Defense Director

Paul W. Gromer, Massachusetts Secretary of IIncrgy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSPIRG

,

Regional Administrator, FEMA

Office of the Commissioner, Massachusetts Department of Environmental Quality

11ngineering

Office of the Attorney General, Commonwealth of Massachusetts

i

T. Rapone, Secretary of Public Safety, Commonwealth of Massachusetts

Chairman, Citizens Urging Responsible Energy

Karl Abraham, (PAO) (2)

NRC Resident inspector

Commonwealth of Massachusetts, SLO Designee

- ,

.

!

OFFICIAL RECORD COPY

G:PILGEXM.RPT

t

w. -

. .

__._ _ ,_. ....~ ~-..~.-

. . . . - , - . - _ . - , _ , _ . , , _ _ ,

._-._u-._,,---,_--

hir. Roy A. A

crson

3

cc w/ encl. and Attachments 1 - 6:

J. Alexander - Nuclear Department Training hianager

IL Italfour, Operator Training Section Manager

A. Shiever, Operator Training Supervisor

Public Document Room (PDit)

Local Public Document 1(oom (LPDR)

Nuclear Safety Information Center (NSIC)

bec w/cncl.; w/o Attachments 1 - 6:

Region I Docket Room (with concurrences)

R. Gallo, Chief, OLil, NRR

W. Ilutler, NRR

R. Eaton, NRR

V. McCree, OEDO

L. llettenhausen, DRS

J. Linville, DRP

11. Kelly, DRP

J. Macdonald, SRI - Pilgrim (with concurrences)

R. Conte, DRS

E. McCabe, DRSS

S. llansell, DRS

T. Walker, DRS -

C. Tyner, Examiner (EG&G)

J llanck, Examiner (!!G&G)

OL Facility File

DRS T;iles (1)

bec w/ encl. and Attachments 1 - 6:

Master Exam File

l

l-

OFFICIAL RECORD COPY

G:PILGEXM.RPT

l.

_

_

_

=_

Y

wy

wyseww-

wg r wwv-

yw

-p

g---gr

-s yvww

y

c'

q

q

ye-'vs

y

v'g-qmyw

pSr-rg-

7* gym-eey o g

-wpa%r.

m-

t--

g

-=v

,Wt~-

i

Mr. Roy A. Anderson

4

'

bec w/ Letter and Executive Summary Only; w/o Attachments 1 - 6:

T. Martin, RA

W. Kane, DRA

C. Itchl, DRP

J. Wiggins, DRP

R. Cooper, DRSS

M. Thxiges, DRS

W. lanning, DRS

W. Ruland, DRS

'

1. llettenhausen, DRS

J. Joyner, DRSS

D. Ilokxty, EO

- ._ .

1

,

b

RIfDh'

Rl:DRS

RI:DRS

Walker /dmg

ante

. Bettenhausen

h

$

/

01/06/93

Ol/L-/93

01/g/93

OFFICIAL RECORD COPY

G:PILGEXM.RPT-

i

>

'

'

. - -

. _-_

rw

,w,ig-yy,w

--,y

p-

v-w-i-