Docket No. 50-298 June 10,1985 Mr. J. M. Pilant, Technical Staff Manager Nuclear Power Group Nebraska Public Power District Post Office Box 499 Columbus, Nebraska 68601
Dear Mr. Pilant:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 1.2, POST TRIP REVIEW (DATE AND INFORMATION CAPABILITY).
Re:
Cooper Nuclear Station By Generic Letter 83-28, dated July 8, 1983, you were requested to respond to certain generic concerns that developed from the investigation into the failure of scram circuit breakers at Salem Nuclear Power Plant, Unit 1.
These concerns are categorized into four areas:
(1) Post Trip Review; (2)
Equipment Classification and Vendor Interface; (3) Post-Maintenance Testing; and (4) Reactor Trip System Reliability Improvements. Your response to these four areas of Generic Letter 83-28 was provided by letter dated November 4, 1983.
We have completed our review of your response to Item 1.2 of Generic Letter 83-28 relating to Post Trip Review Data and Information Capability. The enclosed Safety Evaluation provides the results of our review which incorporates ' input from our technical contractor, Science Applications International Corporation. Their input was based on an evaluation of the applicable portions of your November 4,1983 submittal as clarified by you in telephone calls on May 20, 1985 and May 23, 1985. Based on our review, 8506240629 850610 PDR ADOCK 05000298 P
l i
Mr.-J. M. Pilant 2-we find that your Post Trip Review Data and Information Capability meet the guidelines described in the enclosure and are, therefore, acceptable. We consider Item 1.2 of Generic Letter 83-28 to be resolved.
Sincerely, Original signed by/
Domenic B. Vassallo, Chief Operating Reactor Branch #2 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION beet File:
NRC'PDR"~ "
Local PDR ORB #2 Reading HThompson SNorris ESylvester DVassallo EJordan BGrimes JPartlow ACRS (10)
ORB #2 Gray File l
t I
ORB #2:DL ORB 2:DL ORB #2:DL SNo ris:rc ESylvester DVassallo 06/7 /85 06/10/85 06//dF85 4
-m.r
~ _, _.
Mr. J. M. Pilant Cooper Nuclear Station Nebraska Public Power District CC:
Mr. G. D. Watson, General Counsel Nebraska Public Power District Post Office Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Cooper Nuclear Station ATTN: Mr. Paul Thomason, Division Manager of Nuclear Operations Post Office Box 98 Brownville, Nebraska 68321 Director Nebraska Dept. of Environmental Control Post Office Box 94877 State h se Station Lincoln, Nebraska 58509 Mr. William Siebert, Commissioner
~
~Nemaha County Board of Commissioners Nemaha County Courthouse Auburn, Nebraska 68305 Mr. Dennis DuBois U. S. Nuclear Regulatory Commission Resident Inspector Post Office Box 218 Brownville, Nebraska 68321 Robert D. Martin Regional Administrator Region IV Office U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive. Suite 1000 Arlington, Texas 76011
- i. Ellis Simmons, Director Division of Radiological Health Department of Health 301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509
--.,