Monthly Operating Repts for Dec 1992 for Point Beach Nuclear Plant Units 1 & 2
ML20127E620
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/31/1992
From: Link B, Peterson D
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-93-006, CON-NRC-93-6 VPNPD-93-007, VPNPD-93-7, NUDOCS 9301190416
Download: ML20127E620 (9)


Text

_

t-Wisconsin Electnc POWER COMPANY 231 W McNT t PO Box 2046 Mawoukee. M 53201 (414)??i-2345 VPNPD-93-007 NRC-93-006 January 8, 1993 Document Control Desk U.S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.

20555 Gentlemen:

QQCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS.

POINT Bl'.ACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of December 1992.

Sincerely,

[,c s

Bob Link Vice President Nuclear Power MFB/jg cc:

L. L.

Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector i

F 9301190416.921231

/ /

DR 'ADOCK 0500 b

A subsklim ofUkvmh?Emm thywkw

/

~

OPERATING DATA REPORT D0cEET No. 50-266

~

DATE: January 6, 1993 COMPLETED Era Den C. Peterson TELEPROME: 414-755-2321 Ext. 361 OPRIt& TING STRTUR

1. UNIT NNIEs POINT maar=N NUCLEAR FIANT - UNIT 1 NOTES L2. REPORTING PERIODS Decentzer - 1992
3. LIGNSID THEIGEAL POWER (INIT): 1518.5
4. MMIEPLATE RATING (08088 MWE): 523.8
5. DESIer IIacTRICAL EthTING (IIET MNE): 497.0
6. MhKDEnt Dayernaar.e ChyACITY (03088 381E)a 509.0.
7. MAXIMUK DEPEIIDAELE M FACITY (IIET 3515): 485.0 S. IF C5hlIGES 0000R IN CEPACITY RATDMIS (ITEMS 3 TIIROINNE 7) SIllCE IAST REPORT, GIVE 1meammgg NR
9. FCIER LETEL TO WEICE ItESTRICTED, IF ABY (EEE IM): En
10. REASONS FOR NESTItICTICES, (IF affE):

at TMIS HOIITE YERR TO DATE CONDIATIVE

11. HOUIts III 14BPORTING *EIRIOD 744.0 8,784.0 194,209.0
12. NIMIBER OF EDUEtB REhCTOR WES GtITICAL 744.0 7,492.8 160,863.3
13. IIERCTogt 3tEsBRTE SHUTDOM BOURS 0.0 14.6 667.3
14. smesma ammersawva. OK LIM 744.0 7,410.7 157,839.4
15. WIfIT EtESERM SBGTDOWII N00ms 0.0 0.0 846.9
16. Gnoss -ar. 3EIgngT gEgingeTED (IINE) 1,128,321 11,086,970 221,736,973
17. GROSS EIECTEtICRL IIIERBY asumenagem 383,290 3,772,670 74,876,400
18. IIET ELECTRICRL 1murar2T WNEskTED (INN) 366,947 3,502,390 71,352,163
19. Ulf1T SENTICE FACTOR 200.04 84.4%

41.3%

20. IMEIT AT177 harr.tTE FRCTOst 100.04 84.4%

St.7s

21. INf1T CRPRCITE PRCTOR (D8135 ISC IIET) 101.7%

S4.6%

75.4%

22. UNIT CSPACITY FACTOR (DSING DER IIET) 99.2%

82.54 73.9%

23. UltIT 70etBD OUTAGE RATE 0.0%

0.64 1.7%

24. Sp Sc3EDutm OWER BRET 6 IIDETER (TTPE, DATE, AM DERIETION OF ERCB):

Ref==1Iap meS Main +=amaem eleuNh= echeduled for March 29, 1993 to Itar 13, 1993.

25. IF SBBTDOIE AT END OF EtEPORT PRErIOD, ESTDIItTED 13 ATE OF SThMTWFs NE DATE FEPORTED AIID FACTORS CIECUEATES AS EBgURSTED IK IEC E2TTER DRTED SIEFTammen 22, 1977

POINT BEACH NUCLEAR P6MP DOCKET NO.

50-266 AVERAGE DAILY UNTT POWER IEVEL UNIT NAMB Point Beack Unit 1 MONHI DECEMBER - 1992 DATE

-January 6.1973 WMPLEITD BY D.C.Petason TIIEPHONE 414 /755-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWBRIRVEL DAY MWe NET DAY MWe NErr DAY MWe NET 1

493 11 494 21 4P5 2

493 12 489 22 63 3

494 13 498 23 63 4

494 14 495 24 493 5

493 15 490 25 474 6

494 16 498 26 490 l

7 495 17

@S 27 et j

1 8

4P2 18 495 28 44 9

e4 19 496 29 e2 10 e3 21 405 30

  1. 5 31
  1. 4 FEFecess M

4 j[i i

s8 i

in 3

! ! ~-

lil il SLpJ i

lll l

I ill Ig i

u}l1~l!.

j l{

DOCKET NO.

50-266 4

i UNIT NAME Point Beach Unit 1 DATE January 6, 1993

]

COMPLETED BY D. C. Peterson TELEPHONE 414/755 2321, Rxt. 361 Unit 1 operated at approximately 493 MWe net throughmat this l

report period with no significant load reductions.

Completed modification to install static transfer capability on unit 125 VDC/125 VAC inverters.

Safety-related maintenance included replacing three electronic boards after the white inverter 1DY03 tripped during a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> j

burn-in.

i d

4 4

1 T

'4 4

0

i OPERATING DATA REPORT DOCKET NO. 50-301 4

2_

DATE: January 6, 1993 3

COMPLETED BY: Don C.

Peterson TELEPHONE:

414-755-2321 Ext. 361 OPERATING STATUS

1. UNIT NAME:

POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES

2. REPORTING PERIOD: December - 1992
3. LICENSED THERMAL POWER (MWT):

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0 I

6. MAXIMUM DEPENDABLE CAPACITY (CROSS MWE):

509.0.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, CIVE REASONS:

j NA I

l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

l NA THIS MONTH YEAR TO DATE CUN'JLATIVE

11. HOURS IN REPORTING PERIOD 744.0 8,784.0 178,993.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,546.1 156,275.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 13.2 229.9 j
14. HOURS GENERATOR ON LINE 744.0 7,493.0 153,982.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,100,982 11,179,104 220,646,261
17. GROSS ELECTRICAL ENERGY GENERATED 379,260 3,840,740 75,000,120
18. NET ELECTRICAL ENERGY GENERATED (MWH) 362,574 3,666,629 71,486,407
19. UNIT SERVICE FACTOR 100.0%

85.3%

86.0%

20. UNIT AVAILABILITY FACTOR 100.0%

85.3%

86.2%

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.5%

B6.1%

81.7%

22. UNIT CAPACITY FACTOR (USING DER NET) 98.1%

84.0%

80.4%

23. UNIT FORCED OUTAGE RATE O.Ct 0.0%

1.Os

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TTPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEPEER 22, 1977

~.

.._..__......_______._._..-._.._._..._._.._....__._..______._____.._.._.._-._....m_.

i I

POINT BEACH NUCLEAR PLANT DOCKET NO.30-301 l

AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 ~

I MONTII DECEMBER - 1992 DATE January 6.1993

[

i COMPLETED BY D.C Peterson TEIEPIIONE 414/755-2321

)

AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe Nf!T DAY MWe NET DAY MWe NET i

1 475 11 480 21 495 2

475 12 496 21 497 3

475 13 497 23 496 L

4 476 14 495 24 496

[

5 474 15 496 25 494 6

475 16 488 26 493 i-7 475 17 493 27 495 i

8 473 18 28 496 l

9 475 19

'497 29 493 I

10 475 20 473 30 497 4

i 31 496 i

t 4

i j Per-on2s=

MW) s' I

i

POINT BEACH NUCLEAR PLANT Docket No.

50-301 Unit Name Point Beach. Unit 2 UNIT SlitTIVOWNS AND FOWER REDUCDONS Date January 6.1993 l

Completed By D. C. Peterson l

REPORT MONTII DECEMBER - 1992 Telephone No.

414/755-2321. Ext. 361

~

Metnce or Sb eting Derstion bn Ikensee Event 5)ssem Component Cause and Correctne Actiort No.

Nee Type' (Iloon)

Reasons gem is Report No.

Code

  • Code' To Prevent Recorrence I

l l

1 F

'F: Forced

' Reason:

' Method:

" Exhibit G - Instructions 5: Scheduled A - Equipment Faibre (explain) 1 - Manual for preparation of D - Maintenance or Testing 2 - Manual Scram data entry sheets C - RefueEng 3 - Automatic Scrant IER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdow a Licensing Exam 5 - Reduced lead F-Administrative 6 - Other (explain) 8ExbW I - Same Source G - Operational Error (explain)

H - Other (explain) i i

F4tPA 0190) a--

- - - _ = -

a

j DOCKET NO.

50 301 I

UNIT NAME 631nt Beach Unit 2 DATE January 6, 1993 COMPLETED BY D. C. Peterson I

TELEPHONE 414/755 2321, Ext. 361 Unit 2 operated at approximately_487 Mwe net throughout this report period.

Power was administrative 1y held at 95% from November 21 to December 14 due to a TS reactor coolant flow limitation.

Additional testing allowed full power operation.

J

{

Safety related maintenance included the following:

ti i

1.

Replaced all packing o rings and one plunger on the "C"

charging pump due to excessive leakage during operation.

2.

Replaced internal element and seals on the "A" residual heat removal pump due to a pump seal failure.