._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ - _ - _ _ _ _ _ _ -
BALTIMORE GASAND l%ELECTRIC l
1650 CALVERT CUFFS PARKWAY. LUSBY, MARYLAND 20657-4702 ROBERT [. DENTON Vict PatstotteT NUCLE AR ChsERGY u.om o. ""
January 13,1993 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50-317 & 50-318 Implementation of Single-Failure-Proof Cask Handling Crane Technical Specifications
REFERENCES:
(a)
Letter from hir. G. C. Creel (BG&E) to NRC Document Control Desk, dated August 13, 1992, Revision of License Amendment Implementation Date (b)
Letter from hir. G. C. Creel (BG&E) to NRC Domnent Control Desk, dated July 2,1991, Single-Failure-Proof Upgrade and Technical Specification Change Request: Spent Fuel Cask Handling Cranc e
(c)
Letter from hir. D. G. hicDonald, Jr. (NRC) to hir. G. C. Creel (BG&E), dated January 17, 1992, Issuance of Amendments for Calvert Cliffs Nuclear Power Plant (d)
Letter from hir D. G. hicDonald, Jr. (NRC) to hir. G. C. Creel (BG&E), dated October 2,1992, Issuance of Amendments for Calvert Cliffs Nuclear Power Plant (c)
Letter from hir. D. G. hicDonald, Jr. (NRC) to hir. G. C. Creel (BG&E), dated May 19,1092, Issuance of Amendments for Calvert Cliffs Nuclear Power Plant Gentlemen:
The purpose of this letter is to inform you of the implementation of License Amendments 166 (Unit 1) and 146 (Unit 2). In Reference (a), Baltimore Gas and Electric Company (BG&E) requested a delay in the implementation date of the license amendment requested in Reference (b),
and approved in Reference (c), from July 31,1992, until December 31, 1992. The Commission approved the delay in the implementation date in Reference (d). The license amendment involved the installation of a Single-Failure-Proof spent fuel cask handling crane. In Reference (a), BG&E committed to inform the Commission when the license amendment was implemented.
f 00 13N PDR ADOCK 05000317 (t
t)0 I%bb 9301190301 930113
/
p PDR i \\
l
--_J
1 l
+
Document Control Desk j
January 13,1993 Page 2 License Amendments 166 (Unit 1) and 146 (Unit 2) were implemented on December 9,1992, following the installation of the new tcolley on the spent fuel cask handling cranc. The old trolley has l
been removed and the new Sirgle-Failure-Proof crane is currently undergoing pre-operational testing.
Subsequent to the Commission's issuance of the revised technical specification pages with a
Reference (c) and prior to their implementation, the Calvert Cliffs technical specifications were reissued in their entirety under Reference (c). Due to an administrative oversight, the pages issued with Amendments 166/146 were not revised at that time. Therefore, we have retyped the changes approved in Amendments 166/146 to make them consistent with the current technical specifications.
A copy of the retyped pages is attached.
Should you have any further questions regarding this matter, we will be pleased to discuss them with l
you.
i l
Very truly yours, s
1
=
n
[_
-oh 7
RED /BDht/bdm/bjd I
i Attachment I
cc:
D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC l
D. G. Mcdonald, Jr., NRC l
T T. Martin, NRC P. R. Wilson, NRC R. I. McLean, DNR l
J. H. Walter, PSC I
i 4