ML20127D991
| ML20127D991 | |
| Person / Time | |
|---|---|
| Site: | 07109089 |
| Issue date: | 05/03/1985 |
| From: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Rowe B WESTINGHOUSE HITTMAN NUCLEAR, INC. |
| References | |
| NUDOCS 8505170199 | |
| Download: ML20127D991 (2) | |
Text
'
7(- 9o S'?
- fy l
W sy wss a
u.
DISTRIBUTION: w/ench g, g
,~
Docket-File NRC PDR IE HQ M S$
Regions (5)
State Health Official-
+
FCTC: RHO MY03 M 71-9089 RH0degaarden (2)
HWLee CEWilliams GJackson NMSS r/f Westinghouse Hittman Nuclear Incorporated FCTC r/f $
ATTN: Mr. Bruce S. Rows 9151 Ramsey Road Columbia, MD 21045 Gentlemen:
Pursuant to 10 CFR Part 71 Certificate of Compliance No. 9089 for the Model No. HN-1005 package is amended to authorize the use of a temporary.
drain line plug in accordance with your letter dated May 2,1985. Provided Condition 12 of the Certificate of Compliance is met. Condition No. 9
-does not apply. All other conditions of Certificate of Compliance No. 9089 shall remain the same.
This authorization shall expire August 15, 1985.
FOR THE U.S. NUCLEAR REGULATORY COMISSION original signdbr m 3. umnnsam
~
Charles E. MacDonald, Chief Transportation Certification Branch Division of Fuel Cycle and Material Safety, NMSS
Enclosure:
Approval Record cc w/ enc 1:
Mr. Richard R. Rawl Department of Transportation 8505170199 850503 PDR ADOCK 07109089 C
PDR n
n A
a=>
F,Q,TC,,
,f,CT,C,hh,b,,[C,Tfh,,,,,,f,C,T,
c== >.R,H,qd,eg,a p,d,er,: j,1,,,,,$, Lee,,,,,,C,EW1,1,],1 a ms,,,,,,C,EM a cpp,n,,,,d,,
our) 5 /.o.3.../.85........
...... 5 /.4. 3../.8 5..'..
5 #...f../.85
..../.J.../. 85 5
N:c ronu sie no<so Nacu ond OFFICIAL RECORD COPY
- u.s.apo iss3-4oo.ru w__,. _
1_
pn ner
+
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION 3
- E WASHINGTON, D. C. 20555
%,.....,o Transportation Certification Branch Approval Record Model No. HN-100S Package Docket No. 71-9089 By application dated May 2,1985, Westinghouse Hittman Nuclear Incorporated requested an amendment to Certificate of Compliance No. 9089 to authorize the use of a temporary drain line plug. The applicant provided revised operating procedures to take into account the temporary drain line plug.
The drain hole has been plugged with a solid bar of steel and welded in place with the same size weld (1/8") as the original drain line.
The applicant has stated that the cask successfully passed the annual leak test requirement before it was plugged. Therefore, if Condition 12 of the Certificate of Compliance is met (annual leak test requirement), Condition No. 9 (requirement for vent / test secondary lid) need not apply.
Charles E. MacDonald, Chief Transportation Certification Branch Division of Fuel Cycle and Material Safety, NMSS Date:
l l
I.
_ _ _.