ML20127D823
| ML20127D823 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/04/1992 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20127D829 | List: |
| References | |
| NUDOCS 9209150184 | |
| Download: ML20127D823 (2) | |
See also: IR 05000266/1992015
Text
..
.
.
- _ _ _ _ _ . . _ _ . _ . . _ .
_ _ _ . _ . . _ . _ _ _ _ _ . _ _ _ _ _ _ _ ,
.
htD
i
N
,
[v a*ouk
u w to starts
NUCt.E A R HCGULATORY COMMisslON
f
t
necion m
,.
. .
~ $
I
/4s ROOstvCLT ROAD
!
g
uttu cLtyn. ituuois sm
- ...+
MP4
1992
!
Dvcket Nos. 50-266; 50-301
' I
Wisconsin Electric P ver Company
ATINr Mr. R. E. L ink
Vice-President
Nuclear Power
231 West Michigan Street - P379
Milwaukee,iWI
53201
-
Dear Mr. Link:-
This refers to.the routine safety inspection conducted by Messrs. K. R. Jury
and J. Gadzala of thh office, from June 29 through August 23, 1992, of
,
. activities at the Point Beach Nuc1 car Plant Units 1 and 2.
Our findings were
'
discussed'with Mr. G. J. Maxfield and members of his staff e.t the conclusion
i
of the inspection.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of- selective examinations of procedures
-and representative records, interviews with personnel, and observations.
,
= During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as spectfled in-the enclosed Notke.' Equipment that was
red tagged was improperly operated.. The violation is of concern.because of
'
-
-
the potential -this situation creates for personnel; injury or equipment damage.
,
" Additionally, it is another exacle of a potential adverse trend regarding
'
Lequipment isolation that' your staff had previously identified. - You are
'
required to respond ~ to this letter and should follow the instructions
specifled in the enclosed Notice when preparing your response.
_ In accordance-with 10 CFR-2.790 of the Commission's regulations, a copy of
.thishletter and the enclosures and your response to this letter will be placed
in the NRC Public Document Room.
>
The responses directed by this letter and the enclosed Notice are not suoject
to the clearance. procedures of the Office of Management.and Budget as required
by the Paperwork Reduction Act of- 1980, Public Law lio. 96.511.
!
a
- 9209150184 920704 - --
'
- PDR
ADOCK!05000266
i
_ (, -
- PDRE
-
l_j
.
e
&W N P ty
- w=evwr
wr w's
Er U- eMup'Tr T98-W"90-
elef *9-tY-''--
3-um
P'
Y-'**"'1'Fwf
2
ert yw--g-
ty'r-yre'tv--*-w9"w
vrv =r -- y we i opt
t- w 9-gy
-
r
+M-%i--*y--
*---f9'av
+-*v
w--ty'-
+-gyv?-,
t
wyg--~w'ye+--
aw g
_
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
- _ _ _ _ _ - _ - _ _ _ _ _
.,
bI
4
IS32
Wisconsin Electric Power Company
2
We will gladly discuss any questions you have concerning this inspection.
Your cooperation with us is appreciated,
,
Sincerely,
'
9'
Robert L. Greger, Chief
Reactor Projects Branch 3
_
Enclosure:
Inspection Reports
No. 50-266/92015(DRP)
.
.
No. 50-301/92015(DRP)
cc w/ enclosure:
G. J. Maxfield, Plant Manager
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, Rlli
Virgil Kanable, Chief
6
Boiler Section
Charles Thompson, Chairman
Wisconsin Public Service
Commission
Robert M. Thompson, Administrator
WI Div of Emergency Govt.
.
O
w.