Forwards Proposed Scope of Operating Experience Review Re Resolution of Open Item in Draft,Final SER for Human Factors Engineering Design for Advanced BWRs
ML20127D635
Person / Time
Site: 05200001
Issue date: 12/21/1992
From: Poslusny J
NRC
To: Fox J, Quirk J, Ross M
GENERAL ELECTRIC CO.
References
NUDOCS 9301150311
Download: ML20127D635 (4)


Text

3)watX Cc9 00/

12/21/92 fKe1E TO: J. fox (ic AA </eAft H. Ross J. Quirk FROM:

Chet Poslusny SUBJECT PROPOSED SCOPE OF OPERATillG EXPERIEllCE REVIEW FOR ABWR HUMAli FACTORS ENGillEERil1G DESIGil FOR ABWR Enclosed for your use is a proposed scoae of an operating experience review which is related to the resolution of tie open item include in the DFSER.

This is provided as a followup to the phonecall held with the staff last t

month. We expect that a call will be required to discuss what actions GE plans to take to close out this item. As per GE's issue Resolution Schedule, this item should be completely resolved by the end of January.

i

+

t t

L 130L75 i

b 9301150311 921221 fj PDR ADOCK 05200001 v,,

~

Q h klgh(h ( /,fff fg/,gy) 7-"We FfWW* * * ' ' ' ' *rur W1aNe y e

w ea M

.'r

.a-eww s'r"*Aq'r'T-v"ru.e ew-

.,., ear em er rs

OERATING EXPERIENCE REVIEW fladdLragn:

The accident at Three Mile Island (TMI) in 1979 and other reactor incidents illustrated that significant problems have existed in the design philosophy of Human System Interfaces (HSis).

There have been many studiet s a result of the THI accident and other incidents.

Utilitics ha.e implemented both NRC mandated changes and additional improvements on their own initiative.

However, the changes were formed based on the constrLints associated with backfits to existing Control Rooms (CRs) using eariy 1980s technology which limited the scope of corrective actions that might have been considered, i.e., more effective fixes could be used in the case of designing a new CR with the modern technology typical of advanced CRs.

Problems and issues encountered in similar systen of previous designs shall be identified and analyzed so that they are avoided in the development of the current system or, in the case of positive features, to ensure their retention.

Eqntent__of an Oneraling_b a rA gfLFlyh w:

Issues shall be identified for review and analysis.

Issues shall be tracked via the Human Factors Engineering Tracking System.

Human performance issues, aroblems and sources of human error shall be defined.

Design elements whica support and enhance human performance shall be identified.

Example issues:

Display Factors Alarm Factors Control factors Organization of Alarms Information Processing Factors Alarm Prioritization Comriunication factors Loss of Alarm Systems Training Factors Nuisance Alarms Procedurec Number of Alarms Staffing Factors Inoperable Instrumentation Content of Alarms Key Lock Switches Recorders Safety function Monitors functional Grouping Lighting Noise Equipment layout Coding Conventions Demarkation labeling Anthropometry Equipment layout Use of Normal Displays during Accident The operating experience review shall include both a review of literature pertaining to the human factors issues and operator interviews on the relevant issues identified.

'V(FM o e,

a 1

l i

1 2

The following sources both industry-wide and plant-or subsystem-relevant should be included in review of the identified issues.

Government and Industry Studies INP0's Significant Operating Event Reports related to human performance Industry Studies performed by HRC (e.g., Wrong Unit Wrong Train Local Control Station Design Configurations, Remote Shutdown Stations and other NRC NUREG'S)

EPRI (Nuclear Power Reports) related to human performance NRC Generic Letters, Information Notices and Bulletins related to human performance OECD Halden Reactor Project resorts AE00 Study on the Analysis of luman Factors of Operating Events Licensee Event Reports All LERs for 1990, 1991, and 1992 for general human performance issues and LERs for the same years at a selection of BWRs for BWR specific issues

  • Incident Investigation Team (IIT) Reports Augmented Inspection Team (AIT) Reports _ involving human performance Outage Analysis Reports Outage Analysis Reports for a Selection of BWRs* for the past-three years DCRDR Reports Human Engineering Discrepancies identified in DCRDRs for a selection of BWRs*

Applicant Specific Studies and Reports Related to the Example Issues (This could include GE or other vendor reports) y r-,

y

,,---,-r7,-,

,-,y w

.y,.-_

y.

~..-

4 3

following is a proposed list of a selection of BWRs:

Clinton Dresden 2,3 Hatch 1,2 Grand Gulf Hope Creek Limerick 1,2 Nine Mile Point 2 Perry 1,2 Pilgrim River Bend Susquehanna 1,2 WNP 2 B

i' l

-w-

->-wp-

-ey e-e T'

W F

q,-

g-p'-

y e^

w whe 9

--- e r-m

- =* --

-agase

'T d-P-w t

- w