Text
.
o l
September 2, 1992 Docket No. 50-285 l
Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power Olstrict 444 South 16th Street Hall Mail Stop 8E/EP4 Omaha, Nebraska 68102-2247 hear Mr. Gates:
l SUBJECI:
RESPONSE TO NRC BULLETIN 92-01, " FAILURE OF THERM 0-LAC 330 FIRE BARP.lER SYSTEM" (TAC NO. M83877)
Your letter dated July 29, 1992, provided a response to NRC Bulletin 1
92-01 for Fort Calhoun Station.
Your response stated that the Fort Calhoun a
Station does not have Thermo-Lag 330 installed as a fire barrier for small i
diameter conduit or wide trays which provide safe shutdown capability.
Your confirmation provides an adequate basis to consider NRC's review of your response complete.
Further NRC review, if any, will be performed by inspection or audit.
Sincerely, Original signed by:
Steven Bloom, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects - lil/IV/V 4
Office of Nuclear Reactor Regulation cc:
See next page
'j
DISTRIBUUON:
- DocketFile)
NRC & LPDRs PDIV-1 r/f IBoger MVirgilio JLarkins Mmp yn e amum n e,,,
PNoonan SBlcom OGC kkuu L iC b aa;i ' m_'y ACRS (10)
PDIV-1 p/f ABeach, RIV
-PMadden AMasciontanio 4
~
OFC LA/PDIV-lM PM/lPDI.V-1 D/PDJh1 NAME PNoondn)
Skm)vw
[ATEids' DATE q /M/92 h/ 2 92 1)2//92 l
4 OFFICIAL RECORD COPY Oocument Name:
FC83877.MPA j
b 9209140173 920902 PDR ADOCK 05000285
/
F PDR c'
-e J
f[A9 8 8 C
,g
t o,
UNITED STATES
.,., ( (*
,n NUCLE AR REGUL ATORY COMMISSION ei j
W ASHINGTON, D. C,20555
,c/
September 2, 1992 Docket No. 50-285 Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Hall Mail Stop 8E/EP4 Omaha, Nebraska 68102-2247
Dear Mr. Gates:
SUBJECT:
RESPONSE TO NRC BULLETIN 92-01, " FAILURE OF THERMO-LAG 330 FIRE BARRIER SYSTEH (1AC NO. M83877)
Your letter dated July 29, 1992, provided a response to NRC Bulletin 92-01 for fort Calhoun Station.
Your response stated that the Fort Calhoun Station does not have Thermo-Lag 330 installed as a fire barrier for small diameter conduit or wide trays which provida safe shutdown capability.
Your confirmation provides an adequate basis to consider NRC's review of your response complete Further NRC review, if any, will be performed by inspection or audit.
Sincerely, Steven Bloom, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactor Regulation cc:
See next page i
l
e
)
Mr. W. Gary Gates Omaha Public Power District fort Calhoun Station, Unit No. I cc:
Harry H. Voigt, Esg.
LeBoeuf, Lamb, Leiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident inspector U.S. Nuclear Regulatory Commission Post Office Box 309 fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinb-ook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Connission i
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Nebraska Department of Health-301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509 Mr. T. L. Patterson, Manager Fort Calhoun Station Post Office Box 399 Fort Calhoun, Nebraska 68023
,-9
,, n#m
---, +
, - +
r
--~+
w
-=+-se--,
w
-