Forwards Safety Insp Repts 50-440/85-10 & 50-441/85-05 on 850212-0429 & Notice of Violation
ML20127D102
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/24/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20127D106 List:
References
NUDOCS 8506240127
Download: ML20127D102 (2)


See also: IR 05000212/2004029

Text

b

.

Dm

MAY 241985

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. A. Grobe,

J. W. McCormick-Barger and G. F. O'Dwyer of this office on February 12 through

.

April 29, 1985, of activities at Perry Nuclear Power Plant, Units 1 and 2,

authorized by NRC Construction Permits No. CPPR-148 and CPPR-149 and to

the discussion of our findings with Messrs. M. D. Lyster, C. M. Shuster,

F. R. Stead, and J. J. Waldron at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendfx. A

written response is required.

In accordance with the NRC's Rules of Practice for Domestic Licensing

Proceedings, Title 10, Code of Federal Regulations, Part 2, Section 2.790,

a copy of this letter and the enclosures will be placed in the NRC Public

Document Room.

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

l

kD

G f 850524

050 o

gol

M hi

. -_. . .

.- .

- The Cleveland Electric Illuminating 2

hiA0( 2 41985 -

Company

We will gladly. discuss any questions you have concerning this inspection.

Sincerely,

39rlainals!Dacdby.1.L'.'ufniG"

R. F. Warnick, Chief

Projects Branch 1

Enclosures:

-

1. Appendix, Notice

of Violation

, 2. Inspection Report

-

No. 50-440/85010(DRP)

No. 50-441/85005(DRP)

cc w/encis:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry

Plant Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing

and Fuel Management Section

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

'.

Robert H. Quillin, Ohio

Department of Health

-

o

.

i

l

I

l

RIII RIII RIII RIII

fiY SY

McCormick-Barger/kja

I?f20&

-Knop

RRL.)

Warnick Weil

05/22/85

- _ - - _ _ _ _ _ _ _ _ - - _ _ _ - - _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _ _ _