Text
b
.
Dm
MAY 241985
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. J. A. Grobe,
J. W. McCormick-Barger and G. F. O'Dwyer of this office on February 12 through
.
April 29, 1985, of activities at Perry Nuclear Power Plant, Units 1 and 2,
authorized by NRC Construction Permits No. CPPR-148 and CPPR-149 and to
the discussion of our findings with Messrs. M. D. Lyster, C. M. Shuster,
F. R. Stead, and J. J. Waldron at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendfx. A
written response is required.
In accordance with the NRC's Rules of Practice for Domestic Licensing
Proceedings, Title 10, Code of Federal Regulations, Part 2, Section 2.790,
a copy of this letter and the enclosures will be placed in the NRC Public
Document Room.
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
kD f
850524
G
050
o
gol
M
h
i
.
-_.
.
.
.-
.
The Cleveland Electric Illuminating
2
hiA0( 2 41985
-
-
Company
We will gladly. discuss any questions you have concerning this inspection.
Sincerely,
39rlainals!Dacdby.1.L'.'ufniG"
R. F. Warnick, Chief
Projects Branch 1
Enclosures:
-
1.
Appendix, Notice
of Violation
2.
Inspection Report
,
No. 50-440/85010(DRP)
No. 50-441/85005(DRP)
-
cc w/encis:
J. J. Waldron, Manager, Perry
Plant Technical Department
M. D. Lyster, Manager, Perry
Plant Operations Department
L. O. Beck, General Supervising
Engineer, Nuclear Licensing
and Fuel Management Section
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
'.
Robert H. Quillin, Ohio
Department of Health
-
o
.
i
l
RIII
RIII
RIII
RIII
fiY SY
I?f20&
RRL.)
McCormick-Barger/kja
-Knop
Warnick
Weil
05/22/85
.
-
-
- -
- -
--
.
- -
-
-
-
- -
-