VERMONT YA*EE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-05 FOR THE MONTH OF MAY,1985
' 1 i
R e.
, g i
r 1
n g
,...n.
n.
,,.,n-,,,
~a.,.y,---,
6
,w-
,.,-m.,4.a, a
OPERATING DATA REPORT Docket No.
50-271 Date 850610 Completed by F.J. Burger Telephone (802) 257-7711 t
OPERATING STATUS Notes:
l.
Unit Name:
Vermont Yankee 2.
Reporting Period:
May, 1985 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
54 0 3
5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 4' 6.
Maximum Dependable Capacity (Gross Mwe):
535 7.
Maximum Dependable. Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A t
9.
Power level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Pericd 744.00 3623.00
- 12. Number of Hours Reactor was Critical 744.00 3607.97 90421.90
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 3602.55 88032.62
~~~
i
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1160304.00 5656908.00 128215917.50
- 17. Gross Electrical Energy Generated (MWH) 385429.00 1909219.00 42698967.00 a
j
- 18. Net Electrical Energy Generated (MWH) 365094.00 1825818.00 40526666.00
- 19. Unit Service Factor 100.00 99.44 79.12
- 20. Unit Availability Factor 100.00 99.44 79.12
- 21. Unit Capacity Factor (using MDC Net) 97.36 99.99 72.27
- 22. Unit Capacity Factor (using DER Net) 95.47 98.05 70.86
- 23. Unit Forced Outage Rate 0.00
.56 7.12
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
Refuelina outaae scheduled to start September 14, 1985 and continue to April 26, 1986.
- 25. If shut down at end of report period, estimated date of startup:
- 26. Units in Test Status-(prior to commercial operation):
Forecast Achieved Initial Criticality Initial Electricity Ccmmercial Operation MSR1.2 I
m
.,-4
__,_,_,_,,,-c.
AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-271 Unit Vermont Yankee Date 850610 Completed by F.J. Burger Telephone (802) 257-7711 MONTH May, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 514 17 502 2
513 18 317 3
513 19 446 4
514 20 503 5
484 21 504 6
514 22 504 7
514 23 504 8
513 24 503 9
510 25 496 10 508 26 480 11 506 27 481 12 460 28 487 13 501 29 483 14 489 30 484 15 483 31 483 16 503 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
MSR.F2 L
l.
Dockst No.-
50-271
.e '
Unit Vcrmont Yankee UNIT SHUTDOWNS AND POWER-REDUCTIONS Date 850610 Completed by F. J. Burcer REPORT. MONTH-May Telephone (802) 257-7711
_. ~
le 2
3 4
5 e
No.
Date Typed Duration Reason Method of License System Component Cause and CorrectG e Action to,
(hours)
Shutting.Dorn Event Code Code Prevent Recurrence e
Reactor,
Report #
?
~
j 85-08 850518 IS?
O B
4 N/d RB COtiR00 Power reduction for control rod
~
(Power pattern exchange and surveillance
.~
s.- '..
^
Redaction) testing.
e t
,~_
_u v
i
~
~~
=:
b, P
~
s
' 1 2
3, 4
F-Forced A-Equipment Failure (Explain)
Method Exhibit G - Instructions S-Scheduled-B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Repcrt (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
MSR.F3
re 1 g
1 N
r 7 O
u 7 I
e B
T 1
e 7
C
. 5 A
7 k
2 n
J. 2
- a E
0 Y
F
)
V 5
2 I
t y0 T
.n 0 b8 C
o 1
(
E om 6 de R
Nr 0
en R
3 5 t o O
tV 8
eh C
l p ktepe citml onaoe DUDCT T
LU SER NO I
T CNU FLAM ESUAC EG E
A C
T N
0 A
0R N
E E
R3 T
OH N
U I
RN A
E M
L DET E
A FC L
ON E
A R
EN RE Y
UT T
IN E
AI F
NA A
M S
T N
E P
I U
E Q
N E
O F
1
. ] s' r
I e
4' Oock2t No.
50-271 dnit Vermont Yankew 1
Date 850610 Completed by F 1. Burger 2
i Telephone (807) 257-7711 REPORT MONTH May, 1985 i
SUMMARY
OF OPERATING EXPERIEHQ{S
( :
Hiablichts y
Vermont Yankee operated at 97.9% of rated thermal power for the month. Gross electrical generation was 385,429 MWHe or 95.9% of design electrical capacity.
Operatina Summary A
The followi g is a chronological description of plant operations inclafding 9
other pertinent items of interest for the foqth:
i.
At the beginning of the reporting period the ' plant was operating at 99.9% of rated thermal power.
7 850515 At 1314 hrs. started cooling tower operations.
I i
r 850518,. At 0001 hrs, a power redection was initiated for a control rod pattern exchange and other surveillance.
850518 At 0710 hr's. a return to full power was; started.
850528 At2'100 hrs.close'dcyclecooling,utilizingthecooling towers, was established.
At the end of ths cepur'.ing period the plant was operating at 99.9% of rated thermal power.
6 M
e ':
FJB/pt:MSR1.1/MSR 1..
',e
~
.,y
?
.1
[e
's U,
L.
c i
VERMONT Y.ANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR huh"r ROAD VERNON, VERMONT 05354 VYV 85-291 June 10, 1985 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station - for the month of May,1985.
Very truly yours, VERMONT YAFEEE NUCLEAR POWER CORPORATION t%+<*~--ffm Warren P. Murphy F [
Vice President and Manager of Operations
.s WPM /FJB/pt:MSRl.1 Z 6 '*f