OPERATING DATA REPORT DOCKET NO.

50-413 DATE'. June 14, 1985 COhlPLETED BY. J. A. Reavis TELEPHONE W -173-7567 OPERATING STATUS

1. Unit Name: -

Catawba.1-Notes

  • Nameplate Rating
2. Reporting Period: May 1 - May 31,.1985 (Gross Mwe) calculated as
3. Licensed Thermal P' ower C.!Wt):

3411 1450.000 MVA x.90 power

4. Nameplate Rating (Gross SIWE):

1305-factor per.Page lii,

5. Design Electrical Rating (Net 51We):

1145

6. Staximum Dependable Capacity (Gross 31We):
7. Staximum Dependable Capacity (Net SIWa):

W

8. If Changes Occurin Capacity Ratings (items Number 3 Through 7)Since Last Report.Give Reasons:

None

9. Power Level To which Restricted,if Any(Net Slwe):
10. Reasons For Restrictions,if Any:

This 31onth Yr..to.Date Cumularive

!!. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical
13. Resetor Reserve Shutdown Hours
14. Hours Generator On.Line
15. Unit Resene Shutdown Hours
16. Grou Thermal Energy Generated (51WH)

.17. Gross Electrical Energy Generated (SIWH)

Not in Co' mmercial Operation

18. Net Electrics! Energy Generated (51WH)
19. Unit Sen..e Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using 51DC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 31onths(Type.Date.snd Duration of Eschi:
25. If Chut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior o Commercial OperationJ:

Forcess:

Achined INITIAL CR)TICALITY 01-07-85 INITIAL ELECTRICITY 01-22-85 COilAIERCIAL OPER ATION 06-85 ADOCK o y,3 p ('/77) eso6a4ooat eso PDR R

PDR I

\\

i

.{.

l.

CATAWBA NUCLEAR STATION.

'-Pressurizer Power Operated Relief Valve (PORV) and Safety Valve Challenges UNIT DATE.

VALVE # (*)

  1. OF CHALLENGES-1 05-28-85 INC32B(P) 1 I.

I I

I i

  • S - SAFETY VALVE P - PORV l

4

  • g e

,--N--4

.~

~w

,w- -

i CATAWBA NUCLEAR STATION Monthly Operating Status Report 1.

Personnel Exposure For the month of April, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for April has been compared with the l

Technical Specifications maximum annual dose commitment and was less than'10 percent of this limit.

i The total station gaseous release for April has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

l 6

6 9

0

1.

Duxe POWER GOMPANY P.O. mox 33 tim)

CHAmLOTTE, N.C. 28242 HALH. TUCKER ~

retxe, sown June 14, 1985 p g on m n star 4 EAR P

.w

/

(

Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Document Control Desk Re: Catawba Nuclear Station 3

Docket No. 50-413

Dear Sir:

Please find attached information concerning the performance and operating 4

status of the Catawba Nuclear Station for the month of May 1985.

Very truly yours,

<A $ V Hal B. Tucker JAR:scs I

Attachment cc:

Dr. J. Nelson Grace, Regional Administrator American Nuclear Insurers.

U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 e, -

101 Marietta Street, Suite 2900 270 Farmington Avenue.

Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Robert Guild, Esq.

U. S. Nuclear Regulatory Commission Attorney-At-Law MNBB-5715 P..O. Box 2097 Washington, D. C.

20555 Charleston, S. C.

29412 INPO Records Center Palmetto Alliance Suite 1500 2135 Devine Street 1100 circle 75 Parkway Columbia,'S. C.

29205 Atlanta, Georgia -30339 Ms. Judy Dovers NRC Resident Inspector Nuclear Assurance Corporation Catawba Nuclear Station, 5720 Peachtree Parkway t

Norcross, Georgia 30092 MN=

/

'll

'