ML20127C353
| ML20127C353 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/01/1992 |
| From: | Jaffe D Office of Nuclear Reactor Regulation |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20127C350 | List: |
| References | |
| FOIA-92-276 NUDOCS 9206030026 | |
| Download: ML20127C353 (1) | |
Text
-.
June 1, 1992 MEMORANDUM FOR: John F. Stolz, Project Director Project Directorate 1-4 Division of Reactor Projects - 1/II FROM:
David H. Jaffe, Senior Project Manager Project-Directorate 1-4 Division of Reactor Projects - 1/11
SUBJECT:
ERRATA SHEET FOR THE MAY 19, 1992 MEMORANDUM, FROM A. THADANI TO S. VARGA,
SUBJECT:
" MILLSTONE I ECCS ANALYSIS WITH OR WITHOUT FEE 0 WATER COOLANT INJECTION FAILURE" The first sentence of the subject memorandum should be changed to read as follows: "The Reactor Systems Branch reviewed the Emergency Core Cooling System (ECCS) analysis for Millstone Unit No.1 (MNPS-1) because of questions raised about an apparent inconsistency between the Technical Specification Bases for the feeduater coolant injection (FWCI) system and the licensee's Safety Evaluation ISE/MP)-90-26, Revision 0, "One Pump 'Feedwater flow Control Setpoint Change." This change is ner eary to correctly reflect the two documents used for comparison in the suoject memorandum.
/s/
David H. Jaffe, Senior Project Manager Project Directorate I-4 Division of Reactor Projects - I/II cc:
J. Miller Djiltribution:
Central Files MRazzaque RFrahm JStolz PO l-4 Memo AThadani RFrahm R/F SRXB R/F SNorris RJones JTaylor DJaffe BHayes JPartlow 0FFICIAL RECORD COPY Document Name:
ERATASH.DJ 0FC
- LA: POI-4
- PH 4
PDI-4 NAME
- bdrris
- DJ
- cn :JS z
- $7 /92 DATE
- 557M
- 5A,d92 b[
1 (t
(32090300 @wyh ip
.