ML20127B712

From kanterella
Jump to navigation Jump to search
Informs That 6-month Operating Rept for Period of Jul-Dec 1971 Being Forwarded Under Separate Cover
ML20127B712
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/28/1972
From: Neils G
NORTHERN STATES POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20127B716 List:
References
NUDOCS 9102110320
Download: ML20127B712 (1)


Text

6 Regulatoev g

MS58 NORTHERN STATES POWER COMPANY MlN N E A PO LIS. MIN N E GOTA 5 540t vb O

February 28, 1972 4

4 4

\\

@ wg e%

?,3 JL h/.

6-w s

s

.4//

Dr Peter A Marris, Director 4

Division of Heactor Licensine, United States Atomic Energy Commicolon Wa shing ton, D C 20 % 5 Ibar Dr Morris:

MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 LICENSE NO. DPR-22 SIX-MONTH OPERATING REPORT NO. 2 Forty copies of the second six-month operating report of the Monticello I

Nuclear Generatice Plant for the period of July 1,1971 to D2cember 31, f

1971 are being cent to you under ceFtrate cover.

This report do required by Section 6.6.D.1 of Appendix A, Technical Specifications and Basec, to Provisional Operating Licence DPR-22 for the Monticello Plant.

Yours very truly, G H Neila, Gen Supt of Nuclear Power Plant Operation GHN/RLS/mn

/\\g NIf m

\\

's,

N CDCFETED A

UWC h

ncouren CKEkh h

/

'e

.P Co a

@l01tl0310 1273

+.

._-___-__-__u

-