ML20127B712
| ML20127B712 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 02/28/1972 |
| From: | Neils G NORTHERN STATES POWER CO. |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20127B716 | List: |
| References | |
| NUDOCS 9102110320 | |
| Download: ML20127B712 (1) | |
Text
6 Regulatoev g
MS58 NORTHERN STATES POWER COMPANY MlN N E A PO LIS. MIN N E GOTA 5 540t vb O
February 28, 1972 4
4 4
\\
@ wg e%
?,3 JL h/.
6-w s
s
.4//
Dr Peter A Marris, Director 4
Division of Heactor Licensine, United States Atomic Energy Commicolon Wa shing ton, D C 20 % 5 Ibar Dr Morris:
MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 LICENSE NO. DPR-22 SIX-MONTH OPERATING REPORT NO. 2 Forty copies of the second six-month operating report of the Monticello I
Nuclear Generatice Plant for the period of July 1,1971 to D2cember 31, f
1971 are being cent to you under ceFtrate cover.
This report do required by Section 6.6.D.1 of Appendix A, Technical Specifications and Basec, to Provisional Operating Licence DPR-22 for the Monticello Plant.
Yours very truly, G H Neila, Gen Supt of Nuclear Power Plant Operation GHN/RLS/mn
/\\g NIf m
\\
's,
N CDCFETED A
UWC h
ncouren CKEkh h
/
'e
.P Co a
@l01tl0310 1273
+.
._-___-__-__u
-