ML20127B682

From kanterella
Jump to navigation Jump to search
Rev 1 to Proposed OL Change Request 16 to License NPF-73, Changing Spec 3/4.3.4 by Extending Test Interval for Reheat Stop & Intercept Valves to 18 Months
ML20127B682
Person / Time
Site: Beaver Valley
Issue date: 12/30/1992
From: Seiber J
DUQUESNE LIGHT CO.
To:
Shared Package
ML20127B666 List:
References
NUDOCS 9301130060
Download: ML20127B682 (1)


Text

-

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

UNIT NO. 2

)

Docket No. 50-412 Duquesne Light Company

)

License No. NPF-73 Beaver Valley Power Station

)

APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S. Nuclear Regulatory Commission, Duquesne Light Company hereby requests that the technical specifications set forth in Appendix A to this license be amended to extend the test interval for turbine reheat stop and intercept valves to eighteen (18) months.

The proposed technical specification change is set forth in Attachment A

to this application.

A safety analysis and no significant hazard evaluation are set forth in Attachment B.

Typed replacement pages for the technical specifications are included in Attachment C.

. Based on the guidance provided by the Commission, the proposed changes have been determined to involve no significant hazards consideration in accordance with 10 CFR 50.92.

WHEREFORE, Applicant respectfully requests that Appendix A to the operating license be amended in the form attached hereto as Attachment A.

Duquesne Light Company g

By

.D.'Sieber ice President uclear Group Subscribed and sworn to before me

  1. '87/d4fg M

on thig hayof d

( &aos/are f

/

Pkiraf $ca)

SMaMrancrem y,py

@3i1*TEcriSuu fiore Ccq pWNN O PES &ct.E g4 bute. Fererpm %g l

9301130060 921230 PDR ADOCK 0500 2

P

_ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ - _ - _ _ - - _ - - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ - - -_.