Text
-.
^
,e ver weev Power 5tdon
. Shippingport. PA 150D 0004 -
= - - - - -
December 30, 1992
~
'vDOS k w_
prm ms:
_,r U
S.' Nuclear" Regulatory. Commission-Attn: ' Document Control Desk-
_ Washington, DC 20555
Subject:
- Beaver Valley Power Station,. Unit No. 2 Docket No. 50-412,-License No. NPP-73:
Proposed Operating; License Change Request
-i No. 16, Revision 1.
Enclosed are'the following:
.1.
-An ~ application for-amendment - to the-above -license to; change-Specification 3/4.3.4-.by-extending-the testiintervalifor reheat; stop and-intercept valves to eighteen-(18) months.-
-2..
Documents designated Attachments A, B,
C, Land:D which set forth, respectively,_ the change _in technical.specificationa,_
the safety
~
analysis- (including.the no_significant. hazards evaluation)',- the-typed
. replacement technical._ specification
- pages,
'and:-'UFSAR.
changes.
This submittal replaces Revision. _ 0 of Request Number 16Lin its'-
. entirety.
This change. has been-reviewed by _the: Onsite SafetyJ Committee and-Offsite' Review. Committee and was' determined'totbe? safe
~
- based on the attached safety analysis.~-
b The; requested-target date for: approval'of--this? proposed change'is;
~ April 30,-:1993.
Sincerely,
~
b.hs-D.-Sieber-120087
-cc: 'Mr. L..W..Rossbach,I Sr. Resident; Inspector
-Mr.
T.
T.. Martin,'NRC Region-IfAdministrator Mr. A '. - W. De Agazio, Project: Manager Mr. T. M. Gerusky, Director BRP/ DER 1
_I Mr._R. Janati,-BRP/ DER ^
Mr.
M.-L.
Bowling (VEPCO)'
-930113004p W1330