ML20127B159

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-245/85-10 & 50-336/85-13 on 850325-0513.No Violation Noted.Receipt of Util 850402,04 & 26 Ltrs Re Issues Identified During Insps Ack.Addl Followup Will Occur During Routine Insp
ML20127B159
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/17/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20127B164 List:
References
NUDOCS 8506210369
Download: ML20127B159 (2)


See also: IR 05000245/1985010

Text

(

.-

..

.

JUN 171985

Docket Nos. 50-245; 50-336

Northeast-Nuclear Energy Company

ATTN:

Mr. John F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

Post Office Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection 50-245/85-10; 50-336/85-13 (3/25/85-5/13/85)

This routine safety inspection was of operational and supporting activities at

Millstone Units 1 and 2.

Particular attention was directed to Unit 2 refueling

outage activities.

No violations of NRC requirements were identified, and no reply

to this letter is required.

The following Northeast Utilities letters on issues identified during NRC inspec-

tions have been received and reviewed.

Additional NRC followup will occur during

routine inspections, but we have no questions at this time.

April 2,1985 letter about inspections of the Unit 1 emergency gas turbine

--

generator and the control of manual containment isolation valves.

April 4, 1985 letter about inaccessible pipe supports at Unit 2.

--

April 26,1985 letter on Unit 1 surveillance, radiation protection procedure

--

compliance at Unit 2, and keeping isolation zones clear.

Your cooperation with us is appreciated.

Sincerely,

original Signed Bgs:

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report 50-245/85-10; 50-336/85-13

g620369850617

G

DOCK 05000245

s

PM

I (

fl

-.

-

.-

-

-

-

---

.

<.

.

.

,.

.-

Northeast Nuclear Energy Company

2

JUN 171985

cc w/ enc 1:

,

E.J. Mroczka, Vice President, Nuclear Operations

W.D. Romberg, Station Superintendent

D.O. Nordquist, Manager of Quality Asurance

R.T. Laudenat, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR),

Nuclear Safety Information Center- (NSIC)

NRC Resident Inspector

State of Connecticut

,

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

Director DRS

Director DRS&S-

DRP Section Chief

.M.

Shanbaky

W. Pasciak

R. McBrearty

C. Anderson

.'

RI:DRP

RI:DRP

R.

P

@uW

Q

Shedlosky

McCabe

Wenzinger

R /85

  1. /85

/85

611

Ghl

OFFICIAL RECORD COPY