Forwards Insp Rept 50-271/85-04 on 850409-12.No Violations Noted.Nrc 850605 Confirmatory Action Ltr Re Complete Testing & Analysis on Concrete Expansion Anchors Associated W/Deadweight Supports Prior to Sept 1985 Outage Cited
ML20127A849
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 06/17/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20127A852 List:
References
NUDOCS 8506210277
Download: ML20127A849 (2)


See also: IR 05000271/1985004

Text

,-.

-

.

,

Jim 171985

Docket No. 50-271 License No. DPR-28

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager

-of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject: Inspection Report No. 50-271/85-04

This refers to the special safety inspection conducted by Mr. A. A. Varela of

this office on April 9-12, 1985 at your office and the Vermont Yankee Nuclear

Power Station, Vernon, Vermont, of activities authorized by NRC License No.

DPR-28 and to the discussions of our findings held by Mr. Varela with

Mr. A. C. Kadak of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

However, one unresolved item was identified regarding the extent of testing and

analyses performed on the concrete expansion anchors associated with deadweight

supports on Seismic Category 1 systems. Accordingly, to address this concern

we met with Mr. A. C. Kadak on May 23, 1985, to review the actions you had

taken. Also, a Confirmatory Action Letter was issued on June 5,1985, to

confirm your commitment to complete the necessary tests and analyses on these

supports prior to startup from the September 1985 outage.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

85062gO]27ggg6M7i 1 Ef ~nd 37i

sa

  • ea .

Cr!r~~h

.7

Stewart D. Ebneter, Director

A Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-271/85-04

0FFICIAL RECORD COPY IR VERMONT YANKEE 85-04 - 0001.0.0

06/13/85 ,

s Qj i \

_

.

.

'

Vermont Yankee Nuclear Power

Corporation 2

cc w/ enc 1:

Mr. R. W. Capstick, Licensing Engineer

.M r. W. F. Conway, President and Chief Executive Officer-

Mr. J. P. Pelletier, Plant-Manager

'

Mr. Donald Hunter,-Vice President

~ Mr. Cort . Richardson, Vermont Public

Interest Research Group, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

' Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of. Vermont

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

L. Tripp,. Chief Section 3A, DRP

,

m

.

RI:DRS

$/ RI:DRS RI:DRS

AVarela/ms JDurr SEbneter

' 6/ ///85 6//f/85 6//V/85

end-

0FFICIAL RECORD COPY IR VERMONT YANKEE 85-04 - 0003.0.0

06/I0/85