Forwards Insp Repts 50-373/92-28 & 50-374/92-28 on 921126- 1228 & Notice of Violation
ML20127A623
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/05/1993
From: Clayton H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20127A626 List:
References
NUDOCS 9301120025
Download: ML20127A623 (2)


See also: IR 05000373/1992028

Text

.

.

.

-

.

-

.-

.1

t

-

JM

5 1993!

'd

Ch ^ (P

f/\\

,

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN: Mr. L. O. De1 George

Vice President, Nuclear Oversight

and Regulatory Services

Executive Towers West III

1400 Opus Place Suite 300

Downers Grove,

IL 60515

Dear Mr. DelCeorge:

This refers to the inspection conducted by D. Hills and C. Phillips of this-

office, and by J. Roman of the Illinois Department of Nuclear Safety, on

November 26 through December 28, 1992. The inspection included a review'of

authorized activities for your LaSalle County Station, Units 1 and 2,

facility. At the conclusion of the inspection, the-findings were discussed

with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these. areas, the inspection consisted of. selective examinations of procedures

and. representative records, interviews with personnel, and observation of ~

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation- of NRC requirements, as specified in the enclosed Notice.

With respect to Item 1, the inspection showed that actions had been taken to

correct the identified violation and to prevent recurrence.

Although Section

2.201 requires you to submit to this office, within 20 days of your receipt of

this Notice, a written statement of explanation, we note that this violation

had been corrected and those actions were reviewed during this inspection.

Therefore, no-response with respect to Item I is' required.

The results of this inspection also showed that certain of your activities

-appeared to be in violation of NRC requirements, as specified in Item 2 of the

enclosed Notice of Violation. The violation-is of concern because of apparent-

inadequacies in work instructions for motor operated valves that resulted in

the failure of a primary containment isolation valve.

You are required to. respond to-this letter and should follow the instructions

specified in the: enclosed Notice when preparing ye

response.

In your

response, you should document the specific actior, taken and any additional

actions you plan to prevent recurrence. After re awing your response to this

Notice, including your proposed corrective actio,. and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

8

9301120025 930105

PDR

ADOCK 05000373.

'

'G^

PDR

h

.

.

.JAN

503

Commonwealth Edison Company-

2

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this-letter will; be placed;

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

=

required by the Paperwork Reduction Act of 1980, PL 96-511.

'

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

verwm m.m y

4 cw,,;ca n

H.-Brent C1ayton, Chief

Reactor Projects Branch 1

.

Enclosures:

1.

Notice of Violation

,

2.

Inspection Reports

No.

50-373/92028(DRP);

No.

50-374/92028(DRP)

cc w/ enclosures:

G. Dieder.ich, Site Vice President-

,

J. Lockwood, Regulatory Assurance

-

Supervisor

'

1

D. Farrar, Nuclear Regulatory Services

Manager

DCD/DCB (RIDS)

OC/LFDCB

>

Resident Inspectors, LaSalle,

'

Clinton, Dresden, Quad Cities

,

R. Hubbard

'

J. W. McCaffrey, Chief, Public

~

Utilities Division

Licensing Project Manager,.NRR

R. Newmann, Office of Public

Counsel, State of Illinois Center

"

. State Liaison Officer

'

3.f,

'

L

.-

Miller

't

e

Clayton

l

Vi/2 }