Monthly Operating Repts for Dec 1992 for Beaver Valley Power Station,Units 1 & 2
ML20127A557
Person / Time
Site: Beaver Valley
Issue date: 12/31/1992
From: David Jones, Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9301110326
Download: ML20127A557 (9)


Text

.

O.

%5 TeleefR*rw (412) 393 EK10 Nadeat Group P O LMm 4

!.tuppiregg.wt PA t*,077.Orxwl January 11, 1993 Beaver Valley Pcuer Station Unit 1 - Docket 11o. 50-334, License No. DPR-66 Unit 2 - Docket tio. 50-412, License !Jo. tiPF-73 Monthly Orenatirn Rerort U. S. Iluclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlenen:

In accordance with Appendix A, Technical Specifications, the Monthly Operatirrj Report is su}nitted for Unit 1 and Unit 2 for tho month of Decc2er, 1992.

Very truly yours, s

". D. Sicber Senior Vice President Nuclear Pcuer Division Chief !Juclear Officer DTJ/mmg Enclosures cc: 11RC Regional Office King of Prussia, PA 1

4 9g51 o$k _No$ i R V

, . . . - . . , - . - . - - . ~ . . . - ~ _ -- . - - .~ . - - ._-.- - - . -- _ .

!UPRATIVE StWARY OF

!Olm!LY OPIRATDKi EXPDUDJCE t

(UIT 1 DECDGER 1992 i

December 1 'Ihe Unit operated at approximtely 90% output in accordance through with the planncd fuel cycle 1crgth extension duriry the entire Decmler 31 report period.

t 4 f e

t I

t I

Il I

e't' * + .--,ve.r. e - p ,.eg - y -- , e.,,,,- mhg + r . - {i - ..a e, .,.

i i

1 d

AVERACE DAILY ui1T IU4ER LEVEL

]

DOCKET 110. 50-334 GTIT BVPS Unit 1 '

DATE Jan. 4, 1993 -

ODMPLEIID BY D<wid T. Jones TELEPilotiE (412) 393-7607 1011111 December 1992.

DAY AVERAGE DAILY ICfER LEVEL DAY AVERAGE DAILY .IOfER LEVEL (144e-liet) (144e-! Jet) 1 736 17 750 1

2 741 18 742 3 729 19 750 4 733 20 742 5 725 21 '754 6 729 _, 22 733' 7 729 23 729 l 8 729 24 725 .

9 729 25 725

'10 723 26- 729-

j. 11 729 27 721 12 729 28 742 i-13 729 29 735

.14 - 733 30 738' L

15 750 -31 ,__,.

~742 16 750

?

INSIRUCTICNS On this font,*h list the average daily unit power level 1440-Net for each day in the reportine month. Oaqx2te' to the nearest whole megawatt, i

= .-.....w_.. i._-... -.:.-.~ ..-. z..-..,....-.. , , , . , . . . - . . - , , . ,

a i

OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 01/05/93 COMPLETED BY: DAVID T. JONES TELEPil0NE: (412) 393-7607 ,

OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: DECEKBER 1992
3. LICENSED TilERHAL POWER (KWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835 +
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABLE CAPACITY (Not MWe): 810 -
8. IF CilANCES OCCUR IN CAPACITY RATINGS SINCE UsST REPORT, GIVE REASONS:
9. POWER LEVEL TO VilICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS , IF ANY: N/A TilIS MONTil YEAR TO DATE CUMUIATIVE
11. liOURS IN REPORTING PERIOD: 194,0 8784.0 146136.0
12. NO. OF llRS. REACTOR WAS CRITICAL: 744.0 8226.7 93550.3

.3. REACTOR RESERVE Sl{UTDOWN ll0URS: 0.0 0.0 4482.8

14. Il0URS GENERATOR WAS ON LINE: 744.0 8219.6 91650.8
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS TilERMAL ENERGY GEN. (MVH): 1768591.0 20462825.0 218975001.5
17. GROSS ELECT. ENERGY CEN. (MWH): 581970.0 6696090.0 70494493.0
18. NET ELECTRICAL ENERGY GEN. (MWil) : 546710.0 6298390.0 65865940.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 93.6 64.8
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 93.6 64.8 21, UNIT CAPACITY FACTOR (MDC): PCT 90.7 88.5 58.3
22. UNIT CAPACITY FACTOR (DER): PCT 88.0 85.9 56.6
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0. 6.4 ~L9
24. SHUTDOWNS SCllEDULED OVER NEXT SIX MONTHS (TYPE.DATE,AND DURATION OF EACH):

__ Tile UNIT IS SCHEDULED TO SHUTDOWN FOR ITS NINTH REFUELING OUTAGE ON APRIL 2. 1993. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 70 DAYS .

25, IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

26. UNITS IN TEST STATUS (PRIOR TO COHMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0KMERCIAL OPERATION N/A N/A i

-y-mW -

Docket no. 50-334 ,

UNIT SHUTDChWS AND FDWER REDUCTIO 45 (t20%) Unit hace BVPS Unit #1 Date January 5, 1791 Completed By Devid T. Jees Telephone (&t2) 393-7607 EEPORT MonTM DECEMBER 1992 f Method of Licensee Cause & Corrective Component Actioq to Shutting Event System Duration Coder code 5 Prevent a ccurrenc e Reason 2 Down peactor3 Report

  • No. Date Type 1 (Bours) 22 ZZZZZZ The Unit continued to operate at a 921201 S 0 M 4 h/A reduced output of apprnminately 90%

19 in accordance =lth the planned fuel cycle tength entension.

I 3 4 1 2 Emhibit F .nstructions for l Me th od: '

F-Forced Reason:

1-Manual Freparation of Data Entry Sheets S-Scheduled A-Equipment Failure .Imptain) for Licensee Event Report (LER) File B-Maintenance or Test 2-Manual Scram 3-Automatic Scram (suREG0161).

C-Refueling D Regulatory Restriction 4-Cont'd. from Previous Month 5-Reduction 5 E-Operator Training & License Exam Ezhibit M-Same Source.

F-Administrative 9-Other G-Operational Error (Emplain)

M-Other (E mplain)

IUJU&TIVE SLWRRY OF IMIHLY OPDMTI!1G D:PD11DJCE LUIT 2 DDCIEBD1 1992 Docenicr 1 'Ihe Unit operated at a n:nimi value of loot output, throix3h Doce:rber 2 Docenter 3 At 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> the Unit comenced a reduction in output to approximtely 91% to rerove the "B" Separator Drain Rocciver Drain Pu:rp from service due to high bearing te:rperatures arr.1 vibrations, output was sutcoquently increased to _

approxirately 94% whilo repairo to the prp continued.

Decenter 4 '1ho Unit continued to operato at approxirately 94% output through while repairs to the "B" Separator Drain Receiver Drain pump December 6 were completod.

Decemter 7 At 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> the Unit cannenced a power increase to 100%

output. A narninal value of 100% output was achieved at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />.

December 8 '1ho Unit operatcd at a norninal value of 100% output.

through Doccrt>er 23 December 24 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit comenced a reduction in output to approximtely 48% in accordance with the planned fuel cycle length extension.

Docenter 25 'Iho Unit continued to operate at a re@ cod output of [

through approxim tely 48% in accordance with the planned fuel cycle Decxurber 31 length extension during the remainder of the report period.

. AVERAGE DAILY U!iIT POhTR LEVEL DOCKET 10. 50-412 WIT BVPS Unit 2 DATE Jan. 4, 1993 CmPLETED BY David T. Jones TELEPIONE (412) 393-7607 IO(ni Dece.Ther 1992 DAY AVERAGE DAILY IO4ER LEVEL DAY AVEPAGE DAIIN POWER LEVEL (144e-!!ct) (Mie-Not) 1 836 17 833 l

2 838 18 836 __

829 3 808 19 i

4 789 20 832 5 792 21 836 6 792 22 831-7 804 23 829 8 840 24 829 9 842 25 384 10 838 26 368' 11 837 27 368 ,

12 835 28 378 837 29 360 14 837 30; 354 15 837 31 361 16 827 i

+

INSIRUCTICt1S l On- this format, list the average daily unit pcuer level Mie-Net for each day in

[: the reporting month._ Ctripute to the nearest whole megawatt.

il r

I +

OPERATING DATA REPORT DOCRET No.: 50 412 REPORT DATE: 01/05/93 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7607 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: DECEMBER 1992
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Cross MWe): 870
7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None l
10. REASONS FOR RESTRICTIONS, IF ANY: N/A l l l

THIS MONTH YEAR TO DATE CUMULATIVE l t 11. HOURS IN REPORTING PERIOD: 744.0 8784.0 44919.0

17. NO. OF HRS. REAC+0R WAS CRITICAL: 744.0 7421.0 38501.2 l's . REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 I4. HOURS CENERATOR WAS ON LINE: 744.0 7343.3 38225.3
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
10. CROSS THERMAL ENERGY GEN. (MWH): 1708578.0 18186894.0 43546641.4
17. GROSS ELECT. ENERGY CEN. (MWH): 568063.0 5969223.0 30143804.0
18. NET ELECTRICAL-ENERGY GEN. (MWH): 537591.0 5644322.0 28449807.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 83.6 85.1
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 83.6 85.1
21. UNIT CAPACITY FACTOR (MDC): PCT 88.1 78.4 76.6
22. UNIT CAPACITY FACTOR (DER): PCT 86.4 76.9 75.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.2 3.2 l

24, SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHf (TYPE,DATE, AND DURATION OF. EACH):

l

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l' l 26. UNITS IN TEST STATUS (PRIOR TO COHMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0KMERCIAL OPERATION N/A N/A

UNIT 5HUTDOW4S AE3 POWER REDUCTlous (120%) Docket me. 50-412 .

Unit Name SVPS L+ nit #2 Date _. January 5. 1993 .

Completed By David T. Jones REPORT mouth DECEMBER 1992 Tetephone (412) 303-7607 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typel . (H our s) Reason 2 Down Reactor 3 heport # Code 4 Code 5 Prevent Recurrence 19 .921224 'S 0 W 5 N/A ZZ ZZZZZZ The unit reduced output from 100%

to approminately 43% in accordance with the planned fuel cycle tength entension.

1 2 3 4 F-forced Reason: Method: Exhibit F-Instructions for S-Scheduled A* Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scrae for Licensee Event Report (LER) File C-tefueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction '4-Cont'd. from Previous Month E-operator. Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit M-Same Source.

G-operational Error (Emptain)

H Other (Explain)