O.
%5 TeleefR*rw (412) 393 EK10 Nadeat Group P O LMm 4
!.tuppiregg.wt PA t*,077.Orxwl January 11, 1993 Beaver Valley Pcuer Station Unit 1 - Docket 11o. 50-334, License No. DPR-66 Unit 2 - Docket tio. 50-412, License !Jo. tiPF-73 Monthly Orenatirn Rerort U. S. Iluclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Gentlenen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operatirrj Report is su}nitted for Unit 1 and Unit 2 for tho month of Decc2er, 1992.
Very truly yours, s
". D. Sicber Senior Vice President Nuclear Pcuer Division Chief !Juclear Officer DTJ/mmg Enclosures cc: 11RC Regional Office King of Prussia, PA 1
9g51 o$k _No$
4 i
R V
~.
.. - ~ _ --
. - -.~. - -._-.- - -
!UPRATIVE StWARY OF
!Olm!LY OPIRATDKi EXPDUDJCE t
(UIT 1 DECDGER 1992 i
December 1
'Ihe Unit operated at approximtely 90% output in accordance through with the planncd fuel cycle 1crgth extension duriry the entire Decmler 31 report period.
t 4
f e
t I
t I
Il I
e't' t-~
+
.--,ve.r.
e -
p
,.eg y
e.,,,,-
mhg
+
r
{i
-m
..a e,
i i
1 d
AVERACE DAILY ui1T IU4ER LEVEL
]
DOCKET 110.
50-334 GTIT BVPS Unit 1 DATE Jan. 4, 1993 ODMPLEIID BY D<wid T. Jones TELEPilotiE (412) 393-7607 1011111 December 1992.
DAY AVERAGE DAILY ICfER LEVEL DAY AVERAGE DAILY.IOfER LEVEL (144e-liet)
(144e-! Jet) 1 736 17 750 1
2 741 18 742 3
729 19 750 4
733 20 742 5
725 21
'754 6
729 22 733' 7
729 23 729 l
8 729 24 725 9
729 25 725
'10 723 26-729-j.
11 729 27 721 12 729 28 742 i-13 729 29 735
.14 -
733 30 738' L
15 750
-31
~742 16 750
?
INSIRUCTICNS On this font,*h list the average daily unit power level 1440-Net for each day in the reportine month. Oaqx2te' to the nearest whole megawatt, i
=
.-.....w..
- i. -...
-.:.-.~..-.
z..-..,....-..
a i
OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE: 01/05/93 COMPLETED BY: DAVID T. JONES TELEPil0NE:
(412) 393-7607 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: DECEKBER 1992
- 3. LICENSED TilERHAL POWER (KWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
+
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Not MWe):
810
- 8. IF CilANCES OCCUR IN CAPACITY RATINGS SINCE UsST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VilICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A TilIS MONTil YEAR TO DATE CUMUIATIVE
- 11. liOURS IN REPORTING PERIOD:
194,0 8784.0 146136.0
- 12. NO. OF llRS. REACTOR WAS CRITICAL:
744.0 8226.7 93550.3
.3.
REACTOR RESERVE Sl{UTDOWN ll0URS:
0.0 0.0 4482.8
- 14. Il0URS GENERATOR WAS ON LINE:
744.0 8219.6 91650.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS TilERMAL ENERGY GEN. (MVH):
1768591.0 20462825.0 218975001.5
- 17. GROSS ELECT. ENERGY CEN. (MWH):
581970.0 6696090.0 70494493.0
- 18. NET ELECTRICAL ENERGY GEN. (MWil) :
546710.0 6298390.0 65865940.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 93.6 64.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 93.6 64.8 21, UNIT CAPACITY FACTOR (MDC): PCT 90.7 88.5 58.3
- 22. UNIT CAPACITY FACTOR (DER): PCT 88.0 85.9 56.6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0.
6.4
~L9
- 24. SHUTDOWNS SCllEDULED OVER NEXT SIX MONTHS (TYPE.DATE,AND DURATION OF EACH):
__ Tile UNIT IS SCHEDULED TO SHUTDOWN FOR ITS NINTH REFUELING OUTAGE ON APRIL 2.
1993.
THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 70 DAYS.
25, IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COHMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0KMERCIAL OPERATION N/A N/A i
-y-mW
Docket no.
50-334 UNIT SHUTDChWS AND FDWER REDUCTIO 45 (t20%)
Unit hace BVPS Unit #1 Date January 5, 1791 Completed By Devid T.
Jees EEPORT MonTM DECEMBER 1992 Telephone
(&t2) 393-7607 Cause & Corrective f
Method of Licensee Duration Shutting Event System Component Actioq to No.
Date Type 1 (Bours)
Reason 2 Down peactor3 Report
- Coder code 5 Prevent a ccurrenc e 19 921201 S
0 M
4 h/A 22 ZZZZZZ The Unit continued to operate at a reduced output of apprnminately 90%
in accordance =lth the planned fuel cycle tength entension.
I 4
1 2
3 Me th od:
Emhibit F.nstructions for l
S-Scheduled A-Equipment Failure.Imptain) 1-Manual Freparation of Data Entry Sheets F-Forced Reason:
B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (suREG0161).
D Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Ezhibit M-Same Source.
G-Operational Error (Emplain)
M-Other (E mplain)
IUJU&TIVE SLWRRY OF IMIHLY OPDMTI!1G D:PD11DJCE LUIT 2 DDCIEBD1 1992 Docenicr 1
'Ihe Unit operated at a n:nimi value of loot output, throix3h Doce:rber 2 Docenter 3 At 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> the Unit comenced a reduction in output to approximtely 91% to rerove the "B" Separator Drain Rocciver Drain Pu:rp from service due to high bearing te:rperatures arr.1 vibrations, output was sutcoquently increased to approxirately 94% whilo repairo to the prp continued.
Decenter 4
'1ho Unit continued to operato at approxirately 94% output through while repairs to the "B" Separator Drain Receiver Drain pump December 6 were completod.
Decemter 7 At 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> the Unit cannenced a power increase to 100%
output.
A narninal value of 100% output was achieved at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />.
December 8
'1ho Unit operatcd at a norninal value of 100% output.
through Doccrt>er 23 December 24 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit comenced a reduction in output to approximtely 48% in accordance with the planned fuel cycle length extension.
Docenter 25
'Iho Unit continued to operate at a re@ cod output of
[
through approxim tely 48% in accordance with the planned fuel cycle Decxurber 31 length extension during the remainder of the report period.
AVERAGE DAILY U!iIT POhTR LEVEL DOCKET 10.
50-412 WIT BVPS Unit 2 DATE Jan. 4, 1993 CmPLETED BY David T. Jones TELEPIONE (412) 393-7607 IO(ni Dece.Ther 1992 DAY AVERAGE DAILY IO4ER LEVEL DAY AVEPAGE DAIIN POWER LEVEL (144e-!!ct)
(Mie-Not) 1 836 17 833 2
838 18 836 3
808 19 829 i
4 789 20 832 5
792 21 836 6
792 22 831-7 804 23 829 8
840 24 829 9
842 25 384 10 838 26 368' 11 837 27 368 12 835 28 378
' 837 29 360 14 837 30; 354 15 837 31 361 16 827 i
+
INSIRUCTICt1S l
On-this format, list the average daily unit pcuer level Mie-Net for each day in
[:
the reporting month._ Ctripute to the nearest whole megawatt.
il r
I
+
OPERATING DATA REPORT DOCRET No.:
50 412 REPORT DATE: 01/05/93 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7607 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: DECEMBER 1992
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):
None l
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A l
l THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 8784.0 44919.0 t
- 17. NO. OF HRS. REAC+0R WAS CRITICAL:
744.0 7421.0 38501.2 l's. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 I4. HOURS CENERATOR WAS ON LINE:
744.0 7343.3 38225.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 10. CROSS THERMAL ENERGY GEN. (MWH):
1708578.0 18186894.0 43546641.4
- 17. GROSS ELECT. ENERGY CEN. (MWH):
568063.0 5969223.0 30143804.0
- 18. NET ELECTRICAL-ENERGY GEN. (MWH):
537591.0 5644322.0 28449807.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 83.6 85.1
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 83.6 85.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 86.4 76.9 75.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.2 3.2 l
24, SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHf (TYPE,DATE, AND DURATION OF. EACH):
l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
l' l
- 26. UNITS IN TEST STATUS (PRIOR TO COHMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0KMERCIAL OPERATION N/A N/A
UNIT 5HUTDOW4S AE3 POWER REDUCTlous (120%)
Docket me.
50-412 Unit Name SVPS L+ nit #2 Date _. January 5. 1993 Completed By David T. Jones REPORT mouth DECEMBER 1992 Tetephone (412) 303-7607 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Typel
. (H our s)
Reason 2 Down Reactor 3 heport #
Code 4 Code 5 Prevent Recurrence 19
.921224
'S 0
W 5
N/A ZZ ZZZZZZ The unit reduced output from 100%
to approminately 43% in accordance with the planned fuel cycle tength entension.
1 2
3 4
F-forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A* Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scrae for Licensee Event Report (LER) File C-tefueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction
'4-Cont'd. from Previous Month E-operator. Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit M-Same Source.
G-operational Error (Emptain)
H Other (Explain)