Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
.
O.
%5 TeleefR*rw (412) 393 EK10 Nadeat Group P O LMm 4
!.tuppiregg.wt PA t*,077.Orxwl January 11, 1993 Beaver Valley Pcuer Station Unit 1 - Docket 11o. 50-334, License No. DPR-66 Unit 2 - Docket tio. 50-412, License !Jo. tiPF-73 Monthly Orenatirn Rerort U. S. Iluclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlenen:
In accordance with Appendix A, Technical Specifications, the Monthly Operatirrj Report is su}nitted for Unit 1 and Unit 2 for tho month of Decc2er, 1992.
Very truly yours, s
". D. Sicber Senior Vice President Nuclear Pcuer Division Chief !Juclear Officer DTJ/mmg Enclosures cc: 11RC Regional Office King of Prussia, PA 1
4 9g51 o$k _No$ i R V
, . . . - . . , - . - . - - . ~ . . . - ~ _ -- . - - .~ . - - ._-.- - - . -- _ .
!UPRATIVE StWARY OF
!Olm!LY OPIRATDKi EXPDUDJCE t
(UIT 1 DECDGER 1992 i
December 1 'Ihe Unit operated at approximtely 90% output in accordance through with the planncd fuel cycle 1crgth extension duriry the entire Decmler 31 report period.
t 4 f e
t I
t I
Il I
e't' * + .--,ve.r. e - p ,.eg - y -- , e.,,,,- mhg + r . - {i - ..a e, .,.
i i
1 d
AVERACE DAILY ui1T IU4ER LEVEL
]
DOCKET 110. 50-334 GTIT BVPS Unit 1 '
DATE Jan. 4, 1993 -
ODMPLEIID BY D<wid T. Jones TELEPilotiE (412) 393-7607 1011111 December 1992.
DAY AVERAGE DAILY ICfER LEVEL DAY AVERAGE DAILY .IOfER LEVEL (144e-liet) (144e-! Jet) 1 736 17 750 1
2 741 18 742 3 729 19 750 4 733 20 742 5 725 21 '754 6 729 _, 22 733' 7 729 23 729 l 8 729 24 725 .
9 729 25 725
'10 723 26- 729-
- j. 11 729 27 721 12 729 28 742 i-13 729 29 735
.14 - 733 30 738' L
15 750 -31 ,__,.
~742 16 750
?
INSIRUCTICNS On this font,*h list the average daily unit power level 1440-Net for each day in the reportine month. Oaqx2te' to the nearest whole megawatt, i
= .-.....w_.. i._-... -.:.-.~ ..-. z..-..,....-.. , , , . , . . . - . . - , , . ,
a i
OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 01/05/93 COMPLETED BY: DAVID T. JONES TELEPil0NE: (412) 393-7607 ,
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: DECEKBER 1992
- 3. LICENSED TilERHAL POWER (KWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835 +
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Not MWe): 810 -
- 8. IF CilANCES OCCUR IN CAPACITY RATINGS SINCE UsST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VilICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS , IF ANY: N/A TilIS MONTil YEAR TO DATE CUMUIATIVE
- 11. liOURS IN REPORTING PERIOD: 194,0 8784.0 146136.0
- 12. NO. OF llRS. REACTOR WAS CRITICAL: 744.0 8226.7 93550.3
.3. REACTOR RESERVE Sl{UTDOWN ll0URS: 0.0 0.0 4482.8
- 14. Il0URS GENERATOR WAS ON LINE: 744.0 8219.6 91650.8
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS TilERMAL ENERGY GEN. (MVH): 1768591.0 20462825.0 218975001.5
- 17. GROSS ELECT. ENERGY CEN. (MWH): 581970.0 6696090.0 70494493.0
- 18. NET ELECTRICAL ENERGY GEN. (MWil) : 546710.0 6298390.0 65865940.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 93.6 64.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 93.6 64.8 21, UNIT CAPACITY FACTOR (MDC): PCT 90.7 88.5 58.3
- 22. UNIT CAPACITY FACTOR (DER): PCT 88.0 85.9 56.6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0. 6.4 ~L9
- 24. SHUTDOWNS SCllEDULED OVER NEXT SIX MONTHS (TYPE.DATE,AND DURATION OF EACH):
__ Tile UNIT IS SCHEDULED TO SHUTDOWN FOR ITS NINTH REFUELING OUTAGE ON APRIL 2. 1993. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 70 DAYS .
25, IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COHMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0KMERCIAL OPERATION N/A N/A i
-y-mW -
Docket no. 50-334 ,
UNIT SHUTDChWS AND FDWER REDUCTIO 45 (t20%) Unit hace BVPS Unit #1 Date January 5, 1791 Completed By Devid T. Jees Telephone (&t2) 393-7607 EEPORT MonTM DECEMBER 1992 f Method of Licensee Cause & Corrective Component Actioq to Shutting Event System Duration Coder code 5 Prevent a ccurrenc e Reason 2 Down peactor3 Report
- No. Date Type 1 (Bours) 22 ZZZZZZ The Unit continued to operate at a 921201 S 0 M 4 h/A reduced output of apprnminately 90%
19 in accordance =lth the planned fuel cycle tength entension.
I 3 4 1 2 Emhibit F .nstructions for l Me th od: '
F-Forced Reason:
1-Manual Freparation of Data Entry Sheets S-Scheduled A-Equipment Failure .Imptain) for Licensee Event Report (LER) File B-Maintenance or Test 2-Manual Scram 3-Automatic Scram (suREG0161).
C-Refueling D Regulatory Restriction 4-Cont'd. from Previous Month 5-Reduction 5 E-Operator Training & License Exam Ezhibit M-Same Source.
F-Administrative 9-Other G-Operational Error (Emplain)
M-Other (E mplain)
IUJU&TIVE SLWRRY OF IMIHLY OPDMTI!1G D:PD11DJCE LUIT 2 DDCIEBD1 1992 Docenicr 1 'Ihe Unit operated at a n:nimi value of loot output, throix3h Doce:rber 2 Docenter 3 At 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> the Unit comenced a reduction in output to approximtely 91% to rerove the "B" Separator Drain Rocciver Drain Pu:rp from service due to high bearing te:rperatures arr.1 vibrations, output was sutcoquently increased to _
approxirately 94% whilo repairo to the prp continued.
Decenter 4 '1ho Unit continued to operato at approxirately 94% output through while repairs to the "B" Separator Drain Receiver Drain pump December 6 were completod.
Decemter 7 At 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> the Unit cannenced a power increase to 100%
output. A narninal value of 100% output was achieved at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />.
December 8 '1ho Unit operatcd at a norninal value of 100% output.
through Doccrt>er 23 December 24 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit comenced a reduction in output to approximtely 48% in accordance with the planned fuel cycle length extension.
Docenter 25 'Iho Unit continued to operate at a re@ cod output of [
through approxim tely 48% in accordance with the planned fuel cycle Decxurber 31 length extension during the remainder of the report period.
. AVERAGE DAILY U!iIT POhTR LEVEL DOCKET 10. 50-412 WIT BVPS Unit 2 DATE Jan. 4, 1993 CmPLETED BY David T. Jones TELEPIONE (412) 393-7607 IO(ni Dece.Ther 1992 DAY AVERAGE DAILY IO4ER LEVEL DAY AVEPAGE DAIIN POWER LEVEL (144e-!!ct) (Mie-Not) 1 836 17 833 l
2 838 18 836 __
829 3 808 19 i
4 789 20 832 5 792 21 836 6 792 22 831-7 804 23 829 8 840 24 829 9 842 25 384 10 838 26 368' 11 837 27 368 ,
12 835 28 378 837 29 360 14 837 30; 354 15 837 31 361 16 827 i
+
INSIRUCTICt1S l On- this format, list the average daily unit pcuer level Mie-Net for each day in
[: the reporting month._ Ctripute to the nearest whole megawatt.
il r
I +
OPERATING DATA REPORT DOCRET No.: 50 412 REPORT DATE: 01/05/93 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7607 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: DECEMBER 1992
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe): 870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None l
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A l l l
THIS MONTH YEAR TO DATE CUMULATIVE l t 11. HOURS IN REPORTING PERIOD: 744.0 8784.0 44919.0
- 17. NO. OF HRS. REAC+0R WAS CRITICAL: 744.0 7421.0 38501.2 l's . REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 I4. HOURS CENERATOR WAS ON LINE: 744.0 7343.3 38225.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 10. CROSS THERMAL ENERGY GEN. (MWH): 1708578.0 18186894.0 43546641.4
- 17. GROSS ELECT. ENERGY CEN. (MWH): 568063.0 5969223.0 30143804.0
- 18. NET ELECTRICAL-ENERGY GEN. (MWH): 537591.0 5644322.0 28449807.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 83.6 85.1
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 83.6 85.1
- 21. UNIT CAPACITY FACTOR (MDC): PCT 88.1 78.4 76.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 86.4 76.9 75.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.2 3.2 l
24, SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHf (TYPE,DATE, AND DURATION OF. EACH):
l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
l' l 26. UNITS IN TEST STATUS (PRIOR TO COHMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0KMERCIAL OPERATION N/A N/A
UNIT 5HUTDOW4S AE3 POWER REDUCTlous (120%) Docket me. 50-412 .
Unit Name SVPS L+ nit #2 Date _. January 5. 1993 .
Completed By David T. Jones REPORT mouth DECEMBER 1992 Tetephone (412) 303-7607 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typel . (H our s) Reason 2 Down Reactor 3 heport # Code 4 Code 5 Prevent Recurrence 19 .921224 'S 0 W 5 N/A ZZ ZZZZZZ The unit reduced output from 100%
to approminately 43% in accordance with the planned fuel cycle tength entension.
1 2 3 4 F-forced Reason: Method: Exhibit F-Instructions for S-Scheduled A* Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scrae for Licensee Event Report (LER) File C-tefueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction '4-Cont'd. from Previous Month E-operator. Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit M-Same Source.
G-operational Error (Emptain)
H Other (Explain)