Forwards Rev 4 to Gpu...Radiation Protection Plan, Rev 1 to REMP - Plan & Rev 30 to Emergency Procedure 1202-32, Flood, as Committed to in Re Proposed TMI-2 Pol Addl Submittals Prior to post-defueling Monitored Storage
ML20127A128
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 01/04/1993
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127A134 List:
References
C-92-1970, C000-92-1970, C312-92-2091, NUDOCS 9301110192
Download: ML20127A128 (2)


Text

g al **

GPU Nuclear Corporation rt! Nuclear =,9'rar=

M!ddletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8400 January 4,1993 C312-92-2091 C000-92-1970 US Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating Licensing No. DPR-73 Docket No. 50-320 Proposed TMI-2 POL Additional Submittals

Dear Sir:

The proposed Three Mile Island Unit 2 (TMI-2) Possession Only License (POL) (Reference NRC letter dated February 20,1992)_ included a license condition 2.F. entitled " Additional Submittals Prior to Post Defueling Monitored Storage." The license condition requires GPU Nuclear to submit and implement a site Flood Protection Plan, a site Radiation Protection Plan, an Offsite Dose Calculation Manual (ODCM), a Post Defueling Monitored Storage (PDMS) Fire Protection Pmgram Evaluation (FPPE), a PDMS Quality \ssurance Plan (QAP), and a Radiological Environmental Monitoring Plan (REMP).

The PDMS QAP has been submitted and approved by the NRC (Refemnce NRC letter Michael T. Masnik, NRR, to Dr. Roben L. I_ong, " Approval of Post-Defueling Monitored Storage Quality Assurance Plan for TMI-2," dated June 3,1992). The PDMS QAP will be implemented upon entry into PDMS, Minor revisions to the previously submitted ODCM and FPPE will be necessary prior to entry into PDMS, Proposed changes to those documents will be submitted for NRC review just prior to entry into PDMS and will be implemented upon entry into PDMS.

The site Radiation Pmtection Plan and the REMP are attached for NRC review; they are currently being implemented at the TMI site with no major changes planned. #

9301110192 930104 PDR P'

ADOCK 05000320 PDR f/

O [ I GPU Nuclear Corporation is a subsidiary of the Gener i Public Utilities Corporation c

t

,_. Document Control Desk j hnuary 4,1993 .

C312-92-2091

  • C0(4921970 a Page 2 .

4 i

Although there is no site Flo(xl Protection Plan, per se, the current Recovery Technical  ;

Specifications and the PDMS Safety Analysis Report (SAR) requireinents related to floods are incorporated in the attached site Flood Emergency Procedure (EP). The Flood EP is being >

submitted for infonnation only and will not be considered a license basis document.

Sincerely, k2 %s R. L. Ieng Director, Corporate Services /TMI-2 i EDS/RLL Attachments  :

cc: T. T. Martin - Regional Administrator, Region 1  :

M. T. Masnik - Project Manager, PDNP Directorate L. II. Thonus - Project Manager, TMI Site

- F.1. Young - Senior Resident Inspector, TMI s