ML20126M582

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-254/81-10 & 50-265/81-10 on 810519-20.No Noncompliance Noted
ML20126M582
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/03/1981
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20126M584 List:
References
NUDOCS 8106190178
Download: ML20126M582 (2)


See also: IR 05000254/1981010

Text

.

-

,

f M%

4 -

9'o,_

UNITED STATES

~j

NUCLEAR REGULATORY COMMISSION

[

.e

-

s

REGION 111

^

.

o,

799 ROOSEVELT ROAD

OLEN ELLYN, ILLINOIS So137

g.....e

June 3, 1981

[9

IG,p/$

N

Docket No. 50-254

e

j7[

Docket No. 50-265

'

Commonwealth Edison Company

JD"oI

M.

d Ay, k tw8 TSgg$/

7

ATTN:

Mr. Cordell Reed

o4

Vice President

Post Office Box 767

%

A

- 6

Chicago, IL 60690

'

Gentlemen:

This refers to the routine safety inspection conducted by

Messrs. W. L. Axelson and M. P. Phillips of this office on May 19-21,

1981, and Mr. W. B. Grant of this office on May 20, 1981, of activities

at the Quad-Cities Nuclear Generating Station, Units 1 and 2, authorized

by KRC Operating Licenses No. DPR-29 and No. DPR-30 and tc the discussion

of our findings with Messrs. F. Palmer, N. Kalivianakis, and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements wers identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

f

-

_

c,olI

THIS DOCUMENT CONTAINS

Blog3,99jg

Q

-

WH %

-_-.m

y

-y---

e

eai-4+

,

p

-

-*%.-

,,o-m.

. - . ,

,7.

,w-,-

+p-,-y,v,y

,

-

.

.-

.

-

.

t

Commonwealth Edison Company

-2-

identifies the document or part sought to be withheld, and which_contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

J. A. Hind, Acting Director

Division of Emergency Preparedness

and Operational Support

Enclosure:

IE Inspection

-Reports No. 50-254/81-10

and No. 50-265/81-10

cc w/ encl:

J. S. Abel, Director

of Nuclear Licensing

N. Kalivianakis,

Plant Superintendent

DMB/ Document' Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

!

~

l

t\\

Rdg

ef

A

rig

RII

RI

RIII

RIII

-

l

ggPhn12 s/jp

Grant

son

Pa riello

Reisia

Hi[

5/29/81

))g(

,- . -.

- . .

.. . . .

.

. _ . . . , . _ . . . . _ _ _ . , . , _ . . . . _ . _ . _ _ _ , _ _ _ . . . _ . . . _ - . . _ _ . _ . - _ _ - _ . . _ _ . _