ML20126M577
| ML20126M577 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/07/1985 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| (RDC-123(85)), PY-CEI-OIE-0066, PY-CEI-OIE-66, NUDOCS 8506200390 | |
| Download: ML20126M577 (2) | |
Text
])[7bb f THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG.
- 55 PUBLIC SOUARE Serving The Best Location in the Nation June 7, 1985 MURRAY R. EDELMAN PY-CEI/OIE-0066 L VICE PRESIDENT NUCUAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Overpressurization of Isolated Volumes in Drywell Post-LOCA [RDC 123(85)]
Dear Mr. Keppler:
As stated in our letter on this subject dated April 12, 1985, we are submitting this letter to advise you of our progress with regard to Deviation Analysis Report (DAR) 218.
Resolution of the problem concerning the Unit 1 drywell personnel airlock seals and associated inflation system has been completed through the corrective action taken for DAR 147.
We are currently awaiting General Electric's evaluation of the effect of increased pressures on components previously identified which would result from post-LOCA temperature elevations.
Results of testing performed by General Electric on the ADS-SRVs indicate that the ADS-SRVs will operate at the higher pressures achievable during post-LOCA.
We will file our next report upon review and acceptance of the MSIV evaluation and ADS-SRV testing result from General Electric.
Please call if there are any additional questions.
Sincerely, Murray R. Ede n
Vice President Nuclear Group MRE:pab g
8506200390 850607 JUN 101965,
PDR ADOCK 05000440 S
PM I
)
i Mr. James G. Ktppler June 7, 1985 PY-CEI/OIE-0066 L cc:
J. A. Grobe U.S. NRC-Site Office D. E. Keating U.S. NRC-Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 33039 l
=
N