T,
+
y-
tc 3
t
]
. a.,
\\,
\\
July 22, 1985 NRC/THI-85-053
/
NEMORANDUlt FOR:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Bernard J. Snyder, Program Director k
n*
THI Program Office FRON:
William D. Travers, Deputy Program Director THI Program Office T
SUBJECT:
NRC THI PROGRAM 0FFICE WEEKLY STATUS REPORT FOR JULY 15, 1985 - JULY 21, 1985 a
i
,/
4 1.
PLANT STATUS
)
I
{
}
?
The facility remains in long term cold shutdown with the Reactor
/
Coolant System (RCS) vented to the reactor building atmosphere and
/
N-the reactor vessel head and plenum assembly removed.
- . t The reactor vessel plenum has been removed from the reactor vessel Y
and placed on its storage stand in the deep end of the fuel transfer
/
~
canal. A dam has been installed between the deep and shallow ends of the fuel transfer canal. The deep end is filled with water to a depth of about 20 feet (about 5 feet above the top of the plenum).
The modified internals indexing fixture is installed on the reactor vessel flange and is flooded to elevation 327 feet 6 inches (151 feet above the top of the core region).
?
Calculated reactor decay heat is less than 12 kilowatts.
/
RCS cooling is by natural heat loss to the reactor building ambient atmosphere.
Incore thermocouple readings range from 71*F to 92*F with an average of 81*F. Average cold leg temperature is 60*F.
j.
The average reactor building temperature is 60*F.
The reactor building airborne activity is 2.3 E-7 uCi/cc tritium, and 1.5 E-10 uC1/cc particulate, predominantly cesium 137.
2.
WASTE MANAGEHENT The Submerged Demineralizer System (SDS) comenced processing batch 5123 consisting of 25,745 gallons from the "C" reactor coolant bleed h'
s tank. EPICOR II completed processing batch 260 consisting of 5,324 p
gallons from SDS tank 18 4-Total volume prxessed through SDS to date is 2,939,092 gallons, and fQ.
the total volume crocessed through EPICOR II is 2,505,311 gallons.
I i
leg
- w P
8
+
., +. '
DATE>
t,
7
-, - -. - ~ -
.. =. -
a
+
\\
~ 2:
' July 22, 1985 i
6
~
Harold'R.T0enton Bernard J. Snyder, 7
3 -
c, NRC/THI-85-053 x
3.
' DOSE REDUCTION / DECONTAMINATION ACTIVITIES Decontamination activities are continuing on the 281' level of the Auxiliary Building.
Average general area radiation dose rate is 36 mrem per hour on the n
347'-
evel of the reactor building and is 160 mrem per hour on the 305' level of the reactor building.
4.-
ENVIR0lMENTAL MONITORING 1
EPA sample analysis results show TMI site liquid effluents to be in accordance with regulatory limits. NRC requirements, and the City of Lancaster Agreement.
TMI water samples'taken by the US Environmental Protection Agency at the plant discharge to the river consisted of seven daily composite i
samples taken from June 29,.to July 6. 1985. Gansia scans detected, no reactor related radioactivity.
The Lancaster water samples taken at the water works intake and
_ analyzed by the US Environmental Protection Agency consisted of seven day composite samples taken from June 30 to July 6, 1985 and 2
2 July 7 to July 13.-1985. A gasuna scan detected no reactor related radioactivity.
The NRC outdoor airborne particulate sampler at the TMI Site collected a sample between July 11, and July 18, 1985. No reactor related radioactivity was detected. Analysis showed I-131 and Cs-137 concentrations to be less than the lower limits of detectability.
5.
. REACTOR SUILDING ACTIVITIES 4
1 Additional characterization of the reactor vessel lower head was performed during the week of July 14, 1985.- The characterization 1
j
- included: water sampling in the lower head ~and annulus regions to compare chemical properties for homogeniety additional video inspections in two lower head quadrants which had not been examined previously, and sampling of debris in the lower head. The scheduled activities were completed in one of the two quadrants and the analysis of results is in progress. Solid debris samples will be e
sent to the INEL (Idaho National Engineering Laboratory) for study.
4 i
Inspection of the second quadrant is scheduled to start Monday, July a
22,-1985.
. Preliminary data indicates that boron concentrations, as well-as i
.other chemical and physical water properties in the lower head area, are consistent with those elsewhert in the vessel and that the rubble bed in the newly viewed area generally consists of smaller l
particlesithan previously_ seen in other areas.
I t
)
omes >
01Ta k sac ronu u a oo.noi nacu o24o OFFICIAL. RECORD COPY
^~ ~
~~
~
^^~~
3 r,,m 7' '.
]Q; i- -
9-A s.
' d aHarold RfDents -
3 July 22, 1985 Bernard J. Snyder
~'
NRC/TMI-85-053
~
~
Next week, reactor defueling preparations will dominate the scheduled activities in the reactor building. The defueling platfona will be assembled and installed above the internals indexing fixture in conjunction with the trolley on the debris canister transfer, bridge. The starting date for initial defueling has.been mvised from September to October 1985.
6..
AUXILIARY AND FUEL HANDLING BUILDING ACTIVITIES Installation of the DWCS continued. Partial DWCS turnover for processing RCS during early defueling is scheduled to be completed in late August.-
7.
NRC EVALUATIONS IN PR63RESS Defueling Water Cleanup System Technical Evaluation (including
. Revision 6)
Technical Specification Change Requests numbers 46, 48, 49, and 50 Recovery Operations Plan Change numbers 27, 29, 31, and 32 Fuel Canister Technical Evaluation
~ Fuel Handling Senior Reactor Operator Training Program
.Defueling Safety Evaluation Application for seismic exemption The NRC Vendor Programs Branch performed an inspection at the Nuclear Energy Services (NES) facility in Greensboro - North Carolina where the fuel storage canisters, fuel storafn racks, and
~ fuel-canister transfer shields are being fabricated. "he inspection examined construction activities and included a review of the
. implementation of the quality assurance program at NES. The inspection findings _are undergoing NRC management review and the final inspection report will be used in a few weeks.
8.
PROJECTED SCHEDULE OF FUTURE EVENTS Start of Defueling: October 1985 9.
PUBLIC MEETING On July 18, 1985, the Advisory Panel for the Decontamination of Three Mile Island Unit 2 held a public meeting at the Public Safety Building in Lancaster Pa. The Panel received a status report on the cleanup by GPU Nuclear Corporation, including an announcement that the. scheduled comunencement of defueling has been changed from September 1985 to October 1985 due to equipment procurement and delivery delays.
Dr. William Travers, ~ Deputy Program Director. TMIPO, NRR, provided a
-status report on NRC activities required to be completed prior to-the commencement of defueling.. Dr. William. Kirk, Director, TMI omes >
DATE)
~~
MRC FORM 318 (10-80) NRCM O240 OFFICIAL RECORD COPY t
- = -
Harold R. Denton-4 July 22, 1985 Bernard J. Snyder NRC/TMI-85-053 Field Station, EPA, described the upgraded aquatic radiological monitoring program in the vicinity of. the TMI site; and Mr. Frank Congel, Chief, Radiological Assessment Branch, NRC, summarized the results of a staff review of health effects studies conducted in the vicinity of TMI-2 as a result of the March 1979 accident. The next meeting of the Advisory Panel is scheduled for September -1985 at a location in Annapolis, Maryland, to be identified later.
p M SY WEuom D. Trmers William D. Travers Deputy Program Director i
TMI Program Office j
o,,,c..
ounnassa >
N:c ronu sin eto-so> nacu o24o OFFICIAL RECORD COPY -
i 2
p
.-.0
[J ^
- LHarold'R.'Denton-5 July 22, 1985 Bernard J. Snyder NRC/TMI-85-053 INTERNAL DISTRIBUTION
.EDO
' 0GC Office Directors Connissioner's Technical Assistants NRR Division Directors NRR A/D's
-Regional Administrators IE Division Directors.
TAS EIS
.TMIProgramOfficeStaff(10)
PHS EPA DOE RI Division Directors Public Affairs, RI State Liaison, RI TMIPO HQ r/f TMI SITE r/f CENTRAL FILE NRC PDR LOCAL PDR THI-2 Project Section File TMI2PSq6[9t,
- TMI2PS, C,,,
Till
,,Tli PO.
l a=>
" " " " " ".JBell:,jes,,,...CC,9ygi1..l...
..R..
..W r.
7../.;. 4/.85....
7../.W..... 8. 5....
. 7..... 8. 5.......
.'. 7
= = >
K
- unc ronu ne no-so3 uncu o240
- OFFICIAL RECORD COPY
_