Summary of 850425 Meeting W/Util & Bechtel in Bethesda,Md Re Configuration of Diesel Generators & Offsite Power Bus Ducts.Issues Discussed Include Use of Fireproof Sealant to Provide Fire Protection for Bus Ducts
ML20126M322
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/06/1985
From: Wagner D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8506200293
Download: ML20126M322 (5)


Text

.

>s nau 4

+

[

0,i-UNITED STATES NUCLEAR REGULATORY COMMISSION 5

WASHINGTON, D. C. 20555

,*****j JUN 6 1985 Docket No. 50-354 APPLICANT: Public Service Electric & Gas Company FACILITY:

Hope Creek Generating Station

SUBJECT:

SUDMARY OF DIESEL-GENERATOR / BUS DUCT CONFIGURATION MEETING 4

On April 25, 1985, a meeting was held in the Bethesda, Maryland offices of the NRC to discuss a number of issues concerning the configuration of the diesel generators and the offsite power bus ducts. Meeting attendees are identified in the enclosure to this meeting sumary.

The issues discussed were as follows:

' Issue 1: While penetrating adjacent diesel generator rooms, the offsite power bus cucts are not provided with a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> barrier for fire protection purposes.

Public Service has not identified this as a fire protection exemption in the FSAR. Presently, an aluminum baffle is in place for fire protection purposes.

Plans' call for replacing this baffle with a fire proof sealant. This sealant will be placed to a depth of 10-1/4 inches.

]

The staff noted that such an approach has been used successfully at Uctts Bar i

and Catawba. The staff stated that if Public Service plans to use this approach, j

the staff would need 1) assurance that there are no combustibles present in the zone where the temperature may exceed 325'F, and 2) assurance that if the ducts collapsed into the diesel generator room proper, the sealant would not pull out.

Public Service stated that the penetration seal report would be submitted for staff review.

Issue 2: Section 8.2.2.4 of the Hope Creek SER references a September 21, 1984 letter from Public Service which states that the bus ducts are separated by 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire barriers. When shown a photograph of these ducts at the meeting, the staff observed that they were not protected by a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire barrier.

Public Service noted that the reference in the September 21, 1984 letter was l

to the switchgear bu,;ses being separated from the diesel generators by a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> barrier.

i i

8506200293 850606 PDR ADOCK 05000354 l

A PDR i

r

-.m.---

.e, o.--

c 6w,,.-

,v.,

-m.-

t 2_

i The staff stated that Public Service should provide an analysis to show that with the current cerfiguration, safe shutdown of the plant could be achieved.

t i

t Ch N

Dave Wagner, Project Manager Licensing Branch No. 2 "9

Enclosure:

As stated cc: See next page I

i i

4 k

1

4 t

fir. R. L. Mitti Hope Creek Generating Station Public Service Electric & Gas Co.

I cc: Gregory Minor Susan C. Remis Richard Hubbard Division of Public Interest Advocacy Dale Bridenbaugh New Jersey State Department of FEB Technical Associates the Public Advocate 1723 Hamilton Avenue Suite K Richard J. Hughes Justice Comples San Jose, California 95125 CN-850 J

Trenton, New Jersey 08625 Troy B. Conner, Jr. Esquire Office of Legal Counsel Conner & Wetterhahn Department of Natural Resources 1747 Pennsylvania Avenue N.W.

and Environmental Control Washington, D.C.

20006 89 Kings Highway P.O. Box 1401 Dover, Delaware 19903 Richard Fryling, Jr., Esquire Mr. K. W. Burrowes, Project Engineer Asscciate General Solicitor Bechtel Power Corporation Public Service Electric & Gas Co.

50 Eeale Street P. O. Box 570 T5E P. O. Box 3965 Newark, New Jersey 07101 San Francisco, California 9411S Mr. R. Blough Mr. J. M. Ashley Resident Inspector.

Senior Licensing Engineer U.S.N.R.C.

c/o Public Service Electric & Gas Co.

P. O. Box 241 Bethesda Office Center, Suit 550 1

l Hancocks Bridge, New Jersey 08038 4520 East-West Highway

.Bethesda, Maryland 20614 Richard F. Engel Deputy Attorney General Mr. A. E. Giardino Division of Law Manager - Quality Assurance E&C Environmental Protection Section Public Service Electric & Gas Co.

Richard J. Hughes Justice Complex P. O. Box A CN-112P Hancocks Bridge, New Jersey 08038 Trenton, New ' Jersey 06625 fir. Robert J. Touhey, Mr. Anthony J. Pietrofitta Acting Director General Manager DNREC - Division of Power Production Engineering Environmental Control Atlantic Electric 89 Kings Highway 1199 Black Horse Pike P. O. Box 1401 Pleasantville, NJ 08232 Dover, Delaware 19903 Mr. Thomas E. Hurley Mr. R. S. Salvesen U. S. NRC, Region I General Manager-Hope Creek Operation 631 Park Avenue Public Service Electric & Gas Co.

King of Prussia, Pennsylvania 19406 P.O. Box A i

Hancocks Bridge, New Jersey 08038 Mr. B. A. Preston Project Licensing Manager Public Service Electric & Gas Co.

P. O. Box 570 T22A Hewark, New Jersey 07101 f

L

j Encicsure s-APPLICANT:

PUBLIC SERVICE ELECTRIC & GAS COMPANY FACILITY:

HOPE CREEK GENERATIltG STATION

SUBJECT:

CIESEL eENERATOR/ BUS DUCT CONFIGURATIGN MTG.

J DATE:

THURSDAY, APRIL 25, 1985 NAME AFFILIATION Dave Wagr.er NRC-LB-2 Dennis Kubicki NRC-DE-CMEB John Knox NRC-DSI-PSB l-Ken Cooke Bechtel i

William Gailey_

PSE&G-Project Eng.

Bruce Preston PSE&G Licensing Mgr.

David Sullivan Bechtel-Asst. Proj. Engr.

Robert G. Karcher Bechtel Mech. Engr.

1 Jeffrey J. Pantazes PSE&G Senior Staff Engineer William Pavincich PSE&G 4

f I

f

_. ~..

,v, m-

2-The staff stated that Public Service should provide an analysis to show that with the current configuration, safe shutdown of the plant could be achieved.

Orvient sinried by:

Dave Wagner, Project Manager Licensing Branch No. 2.

Enclosure:

. As stated cc: See next page-NRC PDR-Local'PDR PRC System NSIC LBf2 Reading Dewey, OELD WButler DWagner EHy1 ton.

b

' LBf2/DL/BC LBf2/DL/PH.

DLlagner:lb llButler

_ f klE0 h $l80 O

i l

r

+

r 1

.3.

,,3,.

yg..,

p

,,,,..,r._

j,

--