Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20209G0011999-07-0909 July 1999 Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 ML20207B6621999-05-27027 May 1999 SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 ML20206D4201999-04-20020 April 1999 Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2 ML20196K3561999-01-22022 January 1999 Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity Limits ML20196F6861998-12-0202 December 1998 Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted Connection ML20195C6921998-11-12012 November 1998 Safety Evaluation Supporting Amend 52 to License DPR-73 ML20153A9941998-09-16016 September 1998 Safety Evaluation Denying Request to Remove Missile Shields from Plant Design ML20151U8821998-09-0808 September 1998 SER on Revised Emergency Action Levels for Gpu Nuclear,Inc, Three Mile Island Nuclear Plant Units 1 & 2 ML20237A8331998-08-12012 August 1998 Safety Evaluation Accepting USI A-46 Program Implementation at Plant,Unit 1 ML20199G8371998-01-22022 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Three Mile Island Nuclear Station,Unit 1 ML20210Q9991997-08-28028 August 1997 Safety Evaluation Concluding That Since 25th Tendon Surveillance on Few Yrs Away,Adequacy of Remaining Prestressing Force Will Be Critical to Verify ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20138H6671996-12-19019 December 1996 Safety Evaluation Accepting Util IPE Submittal in Response to GL 88-20 ML20134D7811996-10-24024 October 1996 Safety Evaluation Supporting Amend 51 to License DPR-73 ML20128L6741996-10-11011 October 1996 Safety Evaluation Accepting Third ten-year Interval for Pump & Valve Inservice Testing Program for Facility ML20128K1981996-10-0808 October 1996 Safety Evaluation Supporting Amend 50 to License DPR-73 ML20059D1771993-12-28028 December 1993 Safety Evaluation Supporting Amend 48 to License DPR-73 ML20062K1041993-12-0606 December 1993 Safety Evaluation Supporting Amend 47 to License DPR-73 ML20058F0311993-11-16016 November 1993 SE Informing That Changes to Pdms Requirements & Commitments List of 930115,does Not Constitute Unreviewed Safety Question,Nor Do They Involve Significant Hazard or an Environmental Impact ML20059K3001993-11-0808 November 1993 Safety Evaluation Supporting Amend 46 to License DPR-73 ML20057A3641993-09-0101 September 1993 SER Denying Licensee 930216 & 0416 Requests for Relief from Certain Requirements of ISI Program ML20056F0171993-08-0505 August 1993 Safety Evaluation Accepting Proposed Changes to Pdms Requirements & Commitments List of 930115 ML20128P7321993-02-19019 February 1993 Safety Evaluation Supporting Amend 171 to License DPR-50 ML20126M2861993-01-0505 January 1993 Safety Evaluation Granting Relief from ISI Post Repair Hydrostatic Schedule Requirements ML20058G1331990-11-0606 November 1990 Safety Evaluation Supporting Amend 39 to License DPR-73 ML20058P4681990-08-0909 August 1990 Safety Evaluation Accepting Changes to Table 4.3-3 of Recovery Operations Plan ML20247L0681989-09-11011 September 1989 Safety Evaluation Supporting Amend 35 to License DPR-73 ML20245J4411989-06-23023 June 1989 Safety Evaluation Supporting Util 850823 Response to Generic Ltr 83-28,Item 4.5.3, Reactor Trip Reliability - On-Line Functional Testing of Reactor Trip Sys ML20247E8141989-05-18018 May 1989 Safety Evaluation Accepting Proposed Changes to Recovery Operations Plan ML20247G4131989-05-15015 May 1989 Safety Evaluation Supporting Amend 34 to License DPR-73 ML20245J1201989-04-27027 April 1989 Safety Evaluation Supporting Amend 149 to License DPR-50 ML20245A6521989-04-12012 April 1989 Safety Evaluation Supporting Amend 33 to License DPR-73 ML20196B3071988-12-0101 December 1988 Safety Evaluation Supporting Approval of Lower Core Support Assembly & Lower Head Defueling ML20153E6861988-08-31031 August 1988 Safety Evaluation Accepting Request for Exemption from Lecture Requirements of 10CFR55.59(c)(2) & for Exceptions to Control Manipulations Required by 10CFR55.59(c)(3)(i), Subsections (a) to (AA) ML20153E8471988-08-30030 August 1988 Safety Evaluation Approving Request for Mod of Recovery Operations Plan Table 4.3.3 ML20195B6991988-05-27027 May 1988 Safety Evaluation Supporting Amend 30 to License DPR-73 ML20155B3151988-05-25025 May 1988 Safety Evaluation Supporting Amend 30 to License DPR-73 ML20151D5611988-03-31031 March 1988 Sser of Util 870917 & 1103 Justifications for Proposals & & Relief Requests Re Pump & Valve Inservice Testing Program Denied in 870319 Ser.Exclusion of Stated Valves Accepted ML20150D5101988-03-18018 March 1988 Safety Evaluation Supporting Util 871027 Submittal Re Reconfiguring Main Steam Line Rupture Detection Sys Bypass Indicating Lamp During Cycle 8 Refueling Outage ML20147D9721988-02-26026 February 1988 Supplemental Safety Evaluation Supporting Util Use of Rochester Instrument Sys Model SC-1302 Isolation Devices,Per NUREG-0737,Suppl 1 ML20147E2491988-01-0808 January 1988 Safety Evaluation Supporting Util 871203 & 28 Requests to Use Core Bore Machine to Dismantle Lower Core Suport Assembly ML20237B1501987-12-10010 December 1987 SER Supporting Util Response to Generic Ltr 83-28,Item 2.1 (Part 2), Vendor Interface Programs (Reactor Trip Sys Components) ML20236T5611987-11-18018 November 1987 SER Accepting Util 831108,850805 & 870529 Responses to Generic Ltr 83-28,Item 2.2.1, Equipment Classification Programs for All Safety-Related Components ML20236M9221987-11-0505 November 1987 Safety Evaluation Supporting Util Proposal Re Elimination of Postulated Primary Loop Pipe Ruptures from Design Basis ML20235S3241987-10-0101 October 1987 Safety Evaluation Approving Util 870724 Request for Staging of Two Radwaste Solidification Liners in Waste Handling & Packaging facility.TMI-2 Svc List Encl ML20237G5301987-08-12012 August 1987 Safety Evaluation of Util Response to Item 2.1 (Part 1) of Generic Ltr 83-28, Equipment Classification (Reactor Trip Sys Components) TMI-1. Util Response Acceptable ML20234B9701987-06-25025 June 1987 Safety Evaluation Supporting Amend 28 to License DPR-73 ML20212Q7341987-04-17017 April 1987 Safety Evaluation Supporting Amend 27 to License DPR-73 ML20206B4131987-04-0303 April 1987 Safety Evaluation Supporting Util 850416 Request for Deletion of Constraint of 20-ft Square Modified Penetrations Between Reactor & Auxiliary/Fuel Handling Bldgs.Expanding of Limit to 40-ft Square Acceptable ML20205C6161987-03-20020 March 1987 Safety Evaluation Re Util 860820 & 1020 Requests for Relief from ASME Code Section XI Requirements for Class 1,2 & 3 Components.Relief Should Be Granted Except for Requests 4 & 7.Insufficient Info Provided for Request 7 1999-07-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20211H5111999-08-31031 August 1999 Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With ML20210R4791999-08-13013 August 1999 Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With ML20209G0011999-07-0909 July 1999 Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 ML20210K7651999-07-0909 July 1999 Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With ML20195H0751999-06-0808 June 1999 Drill 9904, 1999 Biennial Exercise for Three Mile Island ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20209G0351999-05-31031 May 1999 TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) ML20207B6621999-05-27027 May 1999 SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20206D4201999-04-20020 April 1999 Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2 ML20209G0071999-03-31031 March 1999 Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion) ML20205K6851999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With ML20210C0161999-03-0101 March 1999 Forwards Corrected Pp 3 of SECY-98-252.Correction Makes Changes to Footnote 3 as Directed by SRM on SECY-98-246 ML20207M8461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for TMI-1.With ML20196K3561999-01-22022 January 1999 Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity Limits ML20207A9291998-12-31031 December 1998 1998 Annual Rept for TMI-1 & TMI-2 ML20196G4661998-12-31031 December 1998 British Energy Annual Rept & Accounts 1997/98. Prospectus of British Energy Share Offer Encl ML20196F6861998-12-0202 December 1998 Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted Connection ML20198B8641998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for TMI-1.With ML20195C6921998-11-12012 November 1998 Safety Evaluation Supporting Amend 52 to License DPR-73 ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20196B7191998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for TMI-1.With ML20203G1211998-10-30030 October 1998 Informs Commission About Staff Preliminary Views Concerning Whether Proposed Purchase of TMI-1,by Amergen,Inc,Would Cause Commission to Know or Have Reason to Believe That License for TMI-1 Would Be Controlled by Foreign Govt ML20155E7511998-10-15015 October 1998 Rev 1 to Form NIS-1 Owners Data Rept for Isi,Rept on 1997 Outage 12R EC Exams of TMI-1 OTSG Tubing ML20154L5541998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for TMI Unit 1.With ML20153A9941998-09-16016 September 1998 Safety Evaluation Denying Request to Remove Missile Shields from Plant Design ML20151U8821998-09-0808 September 1998 SER on Revised Emergency Action Levels for Gpu Nuclear,Inc, Three Mile Island Nuclear Plant Units 1 & 2 ML20151V2811998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Tmi,Unit 1.With ML20237A8331998-08-12012 August 1998 Safety Evaluation Accepting USI A-46 Program Implementation at Plant,Unit 1 ML20237C6411998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Tmi,Unit 1 ML20236R2201998-06-30030 June 1998 Monthly Operating Rept for June 1998 for TMI-1 ML20236W9961998-06-0909 June 1998 1998 Quadrennial Simulator Certification Rept ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20249A1061998-05-31031 May 1998 Monthly Operating Rept for May 1998 for TMI-1 ML20247G0761998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Three Mile Island Nuclear Station,Unit 1 ML20212A2191998-04-22022 April 1998 Rev 3 to Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2 ML20248H6991998-04-0808 April 1998 Requests,By Negative Consent,Commission Approval of Intent to Inform Doe,Idaho Operations Ofc of Finding That Adequate Safety Basis Support Granting Exemption to 10CFR72 Seismic Design Requirement for ISFSI to Store TMI-2 Fuel Debris ML20216K1061998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Three Mile Island Nuclear Station,Unit 1 ML20217E0811998-03-24024 March 1998 Rev 0 to TR-121, TMI-1 Control Room Habitability for Max Hypothetical Accident ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216F0981998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Three Mile Island Nuclear Station,Unit 1 ML20202F8121998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for TMI Nuclear Station, Unit 1 ML20199G8371998-01-22022 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Three Mile Island Nuclear Station,Unit 1 ML20198N2901998-01-12012 January 1998 Form NIS-1 Owners' Data Rept for Isi ML20199J3251997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Three Mile Island Nuclear Station,Unit 1 1999-09-30
[Table view] |
Text
___-___-___ .___ ____ _ __ _ _
[ge en og* <
UNITED STATES
', [*,n NUCLE AR REGULATORY COMMISSION
- ,j W A&WNO TON, D. C. 20%$
% i h....e#
$1f.[TY EVALVATION_BY IllLQ[flCE_QEJWE.LfM_ REACTOR REQVL&I1QN REL&IED TO THE REQUIST_ E0R REllEF UNDER 10 CFR 50.diSAlg)11.)111 MEIEDEQL1LAfL[Di$3}LCMPRfY JERSEY CENIBALP.0MILANLLIGHLt01PRlY EINNSAYANIA.ILEGIRILCQfiPMI DPU NUCLEAR CORPORATl0B 111&EEJi]1.ElS1MQJNCLEAR 5.IATION.__VJ41T NO.1 DAIKET_NO. 50-232 1.0 JRIRQDKIJSN Technical Specification 4.2 for Three Mlle Island Nuclear Station Unit No.1, states that inservice inspection and testing of the American Society of Mechanical Engineers (ASME) Code Class 1, 2, and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(1). The Code of federal Regulations at 10 CFR 50.55a(a)(3) states that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (1) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulties without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 g,nents (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, " Rules for Inservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the mnponents. The regulations require that inservice examination of components and system pressure tests conducted during the second 10-year interval comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) on the date 12 months prior to the start of the 120-month inspection interval, subject to the limitations and modifications listed therein. The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein.
Pursuant to 10 CFR 50.55a(g)(5), if th, licensee determines that conformance with an examination requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission 9301080260 DR 930105 ADOCK 05000289 PDR
P i
in support of that determination and a request made for relief from the ASME Code requirement. Af ter evaluation of the determination, pursuant to ,
10 CFR 50.55a(g)(6)(i), the Commission may grant relief and may impose !
alternative requtrements that are determined to be authorized by law, will not !
endanger life, property, or the common defense and security, and are otherwise '
in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were impcsed.
The licensee, GPU Nuclear Corporation (GPUN), submitted the Three Mile Island Nucicar Station, Unit 1 (THI-1) second 10-Year Interval Inservice Inspection (ISI) program plan to the NRC by letter dated April 19, 1991. The second ISI interval for THI-l commenced on April 20, 1991. The plan commits to the requirements of the 1986 Edition of Section XI of the ASME Boiler and Pressure Vessel Code and was approved by the NRC on October 8, 1992. By letter dated .
October 9,1992, the licensee recuested schedular relief from Code requirement IWA-4400(a), which requires a hycrostatic test following repairs by welding. _ r The letter stated that a number of field tie-in welds and weld repairs have been mado during recent years on the Once Through Steam Generator (OTSG) secondary side, the main feedwater (MfW) system, and the emergency feedwater (EfW) system. Hydrostatic testing of these welds would involve isolating .
(gagging or removal) the 18 main steam safety valves (MSSVs). GPUN argues that this test would cost several hundred thousand dollars, require several days of critical path plant time and would provide no safety benefit. GPUN has requested that this hydrostatic test be deferred until the llR refueling outage in September 1995. This deferral would result in an extension of approximately 5 months beyond the latest date allowed by the Code. GPUN's justificattoo for deferring this test included an assessment that alternative testing (visual leak testing at pressures lower than hydrostatic test pressure and volumetric or surface weld examinations) has been or will be performed on the welds of interest, that no safety or quality benefit would result from this test, and that there is a likelihood that the requirement for this test will be deleted by the ASME and the NRC in the near future.
2.0 EyflUATION During the past several years, weld repairs have been made in the following THI-l Class 2 components:
0TSG vent and drain valves Main feedwater nozzles Emergency feedwater flow venturis >
^
Post-repair testing included volumetric examination (for full penetration welds) or surface examination-(for partial penetration welds) and visual VT-2 leakage inspections. The Ccde (Section XI, paragraph IWA-4400(a)) also requires hydrostatic testing of these welds. Hydrostatic testing of these welds requires hydrostatic testing of both 01SG secondary sides. Because these welds cannot be isolated by existing valves for hydrostatic testing and therefore would require gagging or blanking off the MSSVs for hydrostatic testing, ASME Code Case N-416 allows deferral of the hydrostatic test of these welds until the-next regularly scheduled hydrostatic test of the OTSGs.
The latest date allowable for the 10-year OTSG hydrostatic test required by ASME Code,Section XI, Table IWB-2500-1 (and required because of the weld repairs discussed above) is April 19, 1994. Were it not for these weld '
repairs, the resolution of Code Case N-498 would have' allowed substitution of ,
a VT-2 visual examination at nominal operating pressure for the hydrostatic test (s) required by ASME Code,Section XI. Tables IWB-2500-1, Category B-P, and IWC-2500-1 Category C-H. However, because of the weld repairs, a J
hydrostatic test is presently required by the Code. GPUN has requested i schedular relief from this Code requirement to defer the hydrostatic testing until the llR refueling outage in September 1995. The Code would allow a 1- -
year extension to coincide with plant conditions if plant conditions permitted the test by April 19, 1995. Therefore, the extension requested is, in effect, a 5-month period (April 1995 to September 1995).
The licensee has provided justification for granting this relief as discussed above. The welded repairs are unisolable from the OTSGs, including the MSSV headers for each OTSG. The required hydrostatic test pressure (1300 psig) is much greater than the setpoints for the 18 K_ s. Gagging the HSSVs could 1 result in damage to the valves by bending the spindles. Removal of the valves would likely result in the need to retest some or all of these valves to ensure operability following reinstallation. GPUN believes that it would be impractical to remove and blank these valves only for the purpose of performing the Code-required hydrostatic test. GPUN also states that volumetric examination of full penetration welds and surface examination of partial penetration welds in combination with a VT-2 leakage examination at nominal operating pressure provides a greater level of assurance than hydrostatic tests, as recognized by Code Case N-498. '
The staff has reviewed this request and has concluded that, based on the >
discussion above, the request should be granted.
. 3.0 CONCLU11M The staff has reviewed GPUN's request for-relief and the supporting justification. The cited regulation (10 CfR 50.55a(g)(5))-requires a determination by the licensee that a Code requirement is impractical for that facility and 10 CFR 50.55a(g)(C) requires the Commission to evaluate such determinations. The justification provided by GPUN demonstrates the burden that would result from performing a hydrostatic test of the OTSG secondary system and associated piping and valves at TM1-1 makes the test impractical-for that facility. The staff has concluded that GPUN's request for deferral of the test is justified in recognition of the proposed alternative testing-and therefore recommends that the relief be granted.
The NRC staff has determined that granting this relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life, property, or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon GPUN that could result if-the subject ASME Code requirement were imposed-on the facility.
Principal Contributor: R. W. Hernan Date: January 5, 1993