ML20126M094

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-423/85-19 on 850507-10.No Violation Identified.Areas Requiring Followup Noted & Will Be Examined During Future Insps
ML20126M094
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/12/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20126M097 List:
References
NUDOCS 8506200234
Download: ML20126M094 (2)


See also: IR 05000423/1985019

Text

. . .

.

.

JUN 121985

Docket No. 50-423 License No. CPPR-113

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford, Connecticut 06101

Subject: Inspection Report No. 50-423/85-19

Gentlemen:

On May 7-10, 1985, a routine inspection was performed by Mr. J. R. White

of our office for the purpose of reviewing the pre-operational status of

Millstone Nuclear Generating Station, Unit 3 with respect to areas

affecting radiation protection and radioactive waste management as

authorized by NRC Construction Permit No. CPPR-113. An inspection

report detailing the findings of this effort is atta

Within the scope of this inspection, no violations of NRC requirements

were identified, however, several areas requiring followup effort were

noted. These areas will be re-examined in subsequent inspections of

your activities.

No reply to this letter is required. Your cooperation with us in this

matter is appreciated.

Sincerely,

()r ginal Signed By:

oNa r

Division of Radiation Sa ety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-423/85-19

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. O. Nordquist, Manager of Quality Assurance

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

NRC Senior Resident Inspector

l State of Connecticut g

506 y g 8506 23 FFICI AL RECORD COPY y g

l 0 PDR

.. _ _ __

,

.

Northeast Nuclatar Energy Company 2

.

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

DRP Section Chief

G. Walton, SRI, Beaver Valley Unit 2

.

a

j. ,

i

!

i

f(l l S RI:DRSS

f R SS

l

l

1

'Wk ;e Shanbb)kyRI:DRS Bellamy ifNb Mar 'n

6/ f

'

l/85 6//0/85- 6/l0 /85 6/ /5

1

i

(

0FFICI AL RECORD COPY

f

1

.

-

. . _ , - _ _ - . - _ _ . _ _ . , _ . , . , _ _ _ _ _ _ _ _ , , - - . _ _ _ _ . =

_ m,,. _ ,, , ,-___,,