ML20126M073
| ML20126M073 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/25/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20126M077 | List: |
| References | |
| NUDOCS 8508010219 | |
| Download: ML20126M073 (3) | |
See also: IR 05000498/1985007
Text
_-
,r
.
JUL 2 51985
In Reply Refer To:
Dockets:
50-498/85-07
50-499/85-07
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Mr. B. A. Breslau of this
office during the period May 13-24, 1985, and May 28-31, 1985, of activities
authorized by NRC Construction Permits CPPR-128 and 129, for the South Texas
Project, Units 1 and 2, and to the discussion of our findings with members of
your staff at the conclusion of the inspection.
Areas examined during the unannounced inspection included installation of
safety-related piping and the Metrology and Test Equipment (M&TE) Program and
review of previously identified items.
Within these areas, the inspection
consisted of selective examination of actual installation compared to
procedures and representative records, interviews with personnel and
observations by the inspector.
The inspection findings are documented in the
enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the paperwork Reduction Act of 1980, PL 96-511.
.gRIV:RPB1/8
RP /
RPB1
F BABreslau/lw
GL
table
EHJohnson
] / /85
7 / 8 /85
y/y/85
70
\\
8500010219 850725
N
h
)i
ADOCK 05000498
G
g
i
n
'
.
-2-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
' Sincerely,
or!dnd signed By
E. H. Joh-ron
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/85-07
50-499/85-07
cc w/ enclosures:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Brian Berwick, Esquire
Asst. Attorney General
Environmental Protection Div.
P. O. Box 12548, Capitol Station
-
Lanny Alan Sinkin
Citizens Concerned About
Nuclear Power, Inc.
3022 Porter Street, N.W. #304
Washington, D.C.
20008
Charles Bechhoefer, Esquire
Chairman, Atomic Safety & Licensing
Board
U.S. Nuclear Regulatory Commission
20555
Dr. James C. Lamb, III
313 Woodhaven Road
Chapel Hill, North Carolina
27514
Texas Radiation Control Program Director
s
'
,
bec distrib. by RIV:
- RPBl.
R. P. Denise, DRSP
- * Resident Inspector-0PS
R. D. Martin
!'
- Resident Inspector-CONST.
- B. A. Breslau, RPBl/B
- Section Chief (RPB1/B
- EP&RPB-
- MIS System
- RIV File
- D. Weiss. LFMB (AR-2015)
- RSTS Operator.
- w/766
,l
1