e .- - -
. - . . -
. . ..~ .
. -
gg
~
,
-
,
. .
a
.
DEC 3 01992
Docket No. 50-293
"
Mr. Roy A.- Anderson
,
Senior Vice President-Nuclear
+
Pilgrim Nuclear Power Station
Boston Edison Company.
RFD #1 Rocky Hill Road -
Plymouth, Massachusetts 02360
Dear Mr. Anderson:
,
SUIUECT: INSPECTION REPORT NO. 50-293/92-27
E
i
.
This _ refers to the safety inspection of fire protection activities conducted by Mr. A. Finkel of
this ofEce from -November 2 - 6,1992, at the Pilgrim Nuclear Power Station, Plymouth,
- Massachusetts, of activities authorized by NRC License No. DPR-35 and to the discussions
- of findings held by Mr. Finkel with Mr. E. Kraft, Jr., and other members of your-staff at
the conclusion of the inspection.
'
Areas examined during this inspection are described in the'NRC Region I Ins'pection Repor't
.which is enclosed with this letter. Within these areas, the inspection consisted of sclective
examinations of procedures and representative records, interviews with personnel, and
observations of activitics in progress.
,
Based on the results of this inspection, certain of your activities appear to'be in violation off
NRC requirements, as'specified in the enclosed Notice of Violation (Notice), Appendix Ai
'
<
"
'You are required to respond to this letter and should follow the instructions specified in the f
enclosed Notice when preparing your response. -In our response, you shoiild" document the
~
specific actions taken and any additional actions you plan to'take to prevent recurrence. =In
"your response, you should document the specific actions taken and any actions you phin to;
-
prevent recurrence of the delays that have occured in addressing findings identified through
,
your corrective action system.
OFFICIAL RECORD ' COPY G:PIL9227.AEF
,
'
93o1000134_921230
)_
PDR- ADOCK 0500
3,
.o:
4
Y
.
g, G J;
L
.
- . - ..
--
- - - -
.
.
.
. .
=
_ _ _ _
.
.
Mr. Roy A. Anderson
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
Sincerely,
[]f
ltdfbf Mu .b
~
Lee 11. Bettenhausen, Chief
Operations Branch
Division of Reactor Safety
-
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-293/92-27
_
OFFICIAL. RECORD COPY G:PIL9227.AEF
_ _ _ _ _ _ _ .
____
______-_ _ _
.-
_
1
,
.
'-
Mr. Roy AJAnderson-
-3
'
cc w/encls:
.
El Boulette, Vice President, Nuclear Operations and Station Director -
E. Kraft, Plan't Manager
- V. Oheim, Manager, Regulatory Affairs Department
D. Tarantino, Nuclear Information Manager
,
i
N. Desmond, Compliance Division Manager
R.- Hallisey, Department of Public Health, Commonwealth of Massachusetts
R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts
The Honorable Edward M. Kennedy
The Honorable John F Kerry
The Honorable Edward J. Markey
The Honorable Edward P Kirby
The Honorable Peter V. Forman
B. Abbanat, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury. Board of Selectmen
Plymouth Civil Defense Director
Paul W. Gromer, Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A Nogee, MASSPIRG
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering -
Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
L
Chairman, Citizens Urging Responsible Energy
l.
Public Document Room (PDR)-
'
_ Local Public Document Room (LPDR)
Nuclear Safety Information Center _(NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designee
I
!
i
l
OFFICIAL RECORD COPY G:PIL9227.AEF
,
E
, ;'
n
,n
-
n
,
--
-
,----,r-
,
,.,w',
, , ,
U$$$W$$?iN?
. .
.
Mr. Roy A. Anderson
4
bec w/cncls:
Region I Docket Room (with concurrences and IFS Forms)
L, Bettenhausen, DRS
DRS/EB SALP Coordinator
N. Blumberg, DRS
J. Linville, DRP
E. Kelly, DRP
A. Finkel, DRS
J. Macdonald, SRI - Pilgrim (with concurrences and IFS Forms)
W. Butler, NRR
R. Eaton, NRR
V. McCree, OEDO
DRS File (1)
e
3
_
.
dg
RI:DRS
WI:DRS
RI:DRS
FL
dmg/ajk
Blumberg
usen
1
92
12/N/92
12#192
OFFICIAL RECORD COPY G:PIL9227.AEF
1
_ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _
_ - _ _
_ _ _ _ _ - _ _
_ _ _ _ _ - - - - _ _ _ _ _ _ _ _ _ _ _ _ -
.
. , .
.
-
,
m
APPENDIX A-
.
Boston Edison Company
Docket No. 50 293
Piigrim Nuclear Power Station
License No. DPR-59
During an NRC inspection conducted from Novemoer 2 - 6,1992, violations of NRC
requirements were identified. In accordance with the, " General Statement of Policy and
Procedures for NRC Er.forcement Actions," 10 CFR Part 2, Appendix C (1990), the
violations are listed below:
10 CFR 50, Appendix B, Criterion XVI, requires that neasures shall be established
to assure that conditions adverse to quality, such as failures, deficiencies, defective
material and equipment, are promptly identified and corrected. Boston Edison
Company (BECo) Fire Protection Program, NOP83FP1, requires that the fire -
protection program be periodically audited. The BECo Quality Assurance Program
Sections 2.5.6,16 and 16.2.4 require that audit deficiencies be reported to responsible
management. Conditions adverse to quality shall be corrected and that such
corrective shall be timely.
Contrary to the above actions were not taken in a timely manner to correct audit
findings and other conditions adverse to quality as evidenced by the following
examples:
A lack of required fireproofing material on structural steel in some areas of the
Reactor Building was identified by Quality Assurance Deficiency 1306,
October 24,1984. The same deficiency was also identified in Audits No. 90-
30, December 5,1990, and 91-45, January 9,1992. Corrective action was
not taken to repair this deficiency until November 5,1992, after it was again
brought to your attention during our inspection.
In June 1988, an engineering service request (ESR 88-407) was issued
j
identifying a broken sight glass on the diesel fire pump fuel oil day tank which
L
was also identified in Maintenance requests 88-33-51 and 88-33-161. Audit
No. 90-30, December 5,1990, further identified that tne design of the day
'
tank sight glass was not in accordance with the design requirements of the
National Fire Protection Code No. 20. To date, no corrective action has been
'
taken to bring the tank volume measurement system into NFPA code design.
This is a Severity Level IV Violation (Supplement 1).
9301080136 921230
{0R
ADOCK 05000293
PDR-
--
-
-.
.
-
,
-_- _
.
Appendix A
2
Pursuant to the provisions of 10 CFR 2.201, Boston Edison Company is hereby required to
submit a written statement or explanation to the U. S. Nuclear Regulatory Commission,
A'ITN: Document Control Desk, Washington, D.C. 20555, with a copy to the Regional
Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the
subject of this Notice, within 30 days of the date of the letter transmitting this Notice of
Violation (Notice). This reply should be clearly marked as a, " Reply to a Notice of
Violation," and should include for each violation: (1) the reason for the violation; or, if
contested, the basis for disputing the violation; (2) the corrective steps that have been taken
and the results achieved; (3) the corrective steps that will be taken to avoid further violations;
and (4) the date when full compliance will be achieved. Where good cause is shown,
consideration will be given to extending the response time.
Dated at: King of Prussia, PA
this pday of December 1992.
_
O'
s
-
. -
- _ - _-
__
_-__