ML20126L222
| ML20126L222 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/05/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20126L225 | List: |
| References | |
| NUDOCS 9301070369 | |
| Download: ML20126L222 (5) | |
See also: IR 05000445/1992049
Text
!
'
UNIT E D ST AT E S
f[ps alogk
NUCLEAR REGULATORY COMMISSION
'
f
- l
7)
HEoloN IV
!
611 HY AN PLAZA DRIVE, SUlif 400
o,
8
An LINot oN. T E XAS 76011 8064
c,
..***
JM - 51993
Docket Nos. 50-445
50-446
License No. NPT-87
Construction Permit No. CPPR-127
TV Electric
ATIN:
W. J. Cahill, Jr., Group Vice President
Nuclear Engineering and Operations
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
SUBJECT: NRC INSPECTION REPORT N05, 50-445/92-49; 50-446/92-49
This refers to the inspection conducted by Mr. P. M. Madden of the Office of
Nuclear Reactor Regulation, and the inspectors identified in the attached
report, on November 16-20, 1992.
The inspection included a review of
activities authorized for the Comanche Peak Steam Electric Station, Units 1
and 2, facility.
At the conclusion of the inspection, the findings were
discussed with Messrs. C. L. Terry, R. D. Walker, and those members of your
staff identified in the enclosed report.
Areas examined during the inspection included implementation of the approved
fire Protection Program for Unit 2, selective review of your design and
implementation of features to support fire protection of safe shutdown
capability, and an assessment of the ability of a fire safe shutdown to be
implemented.
Other areas examined and details are identified in the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
However, six unresolved items were identified during this
inspection.
The six unresolved items, which are discussed in detail in the enclosed
inspection report, concern potential fire induced short circuiting and
subsequent failure of motor-operated valves required for safe shutdown; the
scope of breaker and relay preventive maintenance and testing in safe shutdown
circuitry; assumptions in the high impedance fault study required by Generic Letter 86-10; selection and application of the mally actuated fire suppression
heads; derating of emergency ligh.ing batteries in areas of elevated ambient
temperatures; and the design adequacy of a water curtain intended to satisfy
separation criteria.
The unresolved items are further discussed in the
Executive Summary of the attached report.
Further, it was found that the reactor coolant pump lube oil collection system
had neither tank level monitoring instrumentation nor administrative controls
07008s
- /4, ,
I
9301070369 930105
J
ADOCK 0500044S
D
G
___-
_
- _ _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ _ _ .
_
'
i
.
IV Electric
-2-
to periodically measure and dispose of any lube oil leakage.
It is our
understanding that during the exit meeting on November 20, 1992,
Mr. R. D. Walker, Manager of Regulatory Affairs for the Nuclear Engineering
Organization, connitted to have administrative controls for both units in
place prior to Unit 2 fuel load.
in a followup discussion on December 15,
1992, Mr. Walker indicated that the Unit I tanks had been sounded and drained
during the week of December 6, 1992,
if your understanding of the commitment
differs from ours, please contact me immediately.
There were also six additional items which will require inspection followup.
These are further discussed in the Executive Summary of the enclosed report.
One of these items involved numerous deficiencies found in an approved Unit 2
abnormal operating procedure.
The extent of the identified deficiencies led
to a more generic concern with your validation efforts for Unit 2 procedures.
Accordingly, a separate prelicensing inspection regarding this issue is
planned.
in accordance with 10 CfR Part 2.790 of the llRC's " Rules of Practice," a copy
of this letter and its enclosure will be placed in the NRC Public Document
Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/
}N 'Q ,-
A%
/
-
1.
A. Bill Beaci,
trec 6
Division of I actor
ojects
[
Enclosure:
Appendix - NRC Inspection Report
50-445/92-49
50-446/92-49 w/ attachment
cc w/ enclosure:
TV Electric
ATIN:
Roger D. Walker, Manager of
Regulatory Affairs for Nuclear
Engineering Organization
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
l
j
,
.
e
.
1U Electric
-3-
Juanita Ellis
President - CASL
1426 South Polk Street
Dallas, Texas 75224
GOS Associates, Inc.
Suite 720
1850 Parkway Place
Marietta, Georgia 30067-8237
_
TV Electric
Bethesda Licensing
3 Metro Center, Suite 610
Bethesda, Maryland 20814
Jorden, Schulte, and Bt.rchette
ATTN: William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
1025 1homas Jefferson St., N.W.
Washington, D.C.
20007
Newman & iloltzinger, P.C.
A1TH:
Jack R. Newman, Esq.
1615 L. Street, N.W.
Suite 1000
Washington, D.C.
20036
_
Texas Department of Licensing & Regulation
-
ATIN:
G. R. Bynog, Program Manager /
Chief Inspector
Boiler Division
P.O. Box 12157, Capitol Station
.
lionorable Dale McPherson
County Judge
P.O. Box 851
Glen Rose, Texas 76043
Texas Radiation Control Program Director
1100 West 49th Street
Owen L. Thero, President
Quality Technology Company
Lakeview Mobile liome Park, Lot 35
4793 E. Loop 820 South
fort Worth, Texas 76119
. . . .
e
'
.*
,
,
TV Electric
-4-
JN1 - 519%
l0cctoDMB'(IE01)
bec distrib. by RIV:
J. L. Milhoan
Resident inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/Alf, MS: MNBB 4503
MIS System
DRSS-flPS
RIV file
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
PE:DRS/ S .
RE:DRS/PI
C:D S
/
PMMadden?Ew'['
RIV:PE:Dk/B
NRR:fBB
HMurphy(5d/e-i
TReis
3 ;,,
A$ingh
GLC stable
!?_/k>/92
f
io /30/92
g hv /92
./V10/92
- cha /92
pl
n
y:bLj<v
),
[
Y "(1
" $t U!DRP
- DRP
l 'I'""*"[
C:DRP/B
LAYandelf
PGwynn
- BBeach
. ; /y)/92 *
I / 5'/93
/ /5 /93
l
l
l
'
/-
.
. _ . _
_-_ _ __ ___ ___
_ _ _ _ _ _ _ _ - . _ _ _ _ . _ _ _ _ _ _ . _ . _ . _ - _ . _ _ _ _
-
-.
.
TV Electric
-4-
JAN - 51993
bec to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident inspector (2)
l
Section Chief (DRP/B)
Lisa Shea, RM/Alf, MS: MNBB 4503
MIS System
DRSS-flPS
RIV file
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
.
L
RIV:PE:DR[/,B/
PE:0RS/ S
RE:DRS/Ph
C:D S
NRR:fBB
PMMadden
1Reis
Asingh
MMurphy(w/
GLC
stable
.
-t7 /k /92 -
,1
y
tL /A /92
j-
q/y,/92
g b g/920,.;
/V W/92
'
bl"
y k u-
.
ll,
l
- "
M
C:DRP/B
MNT:DRP
, TfDRP *
\\ '*"""1'*" l
LAYandolf
[JPGwnn
/ ABBE ch
. , / t)/92 "
l/ /93
f / / /93
'3
_
.
-
-
.
_
.
- . .
-
.
.
- - -
.