Forwards Insp Repts 50-445/92-49 & 50-446/92-49 on 921116- 20.No Violations or Deviations Noted.Six Unresolved Items Noted Re Potential fire-induced Short Circuiting
ML20126L222
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/05/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20126L225 List:
References
NUDOCS 9301070369
Download: ML20126L222 (5)


See also: IR 05000445/1992049

Text

!

'

UNIT E D ST AT E S

f[ps alogk

NUCLEAR REGULATORY COMMISSION

'

f

  • l

7)

HEoloN IV

!

611 HY AN PLAZA DRIVE, SUlif 400

o,

8

An LINot oN. T E XAS 76011 8064

c,

..***

JM - 51993

Docket Nos. 50-445

50-446

License No. NPT-87

Construction Permit No. CPPR-127

TV Electric

ATIN:

W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

SUBJECT: NRC INSPECTION REPORT N05, 50-445/92-49; 50-446/92-49

This refers to the inspection conducted by Mr. P. M. Madden of the Office of

Nuclear Reactor Regulation, and the inspectors identified in the attached

report, on November 16-20, 1992.

The inspection included a review of

activities authorized for the Comanche Peak Steam Electric Station, Units 1

and 2, facility.

At the conclusion of the inspection, the findings were

discussed with Messrs. C. L. Terry, R. D. Walker, and those members of your

staff identified in the enclosed report.

Areas examined during the inspection included implementation of the approved

fire Protection Program for Unit 2, selective review of your design and

implementation of features to support fire protection of safe shutdown

capability, and an assessment of the ability of a fire safe shutdown to be

implemented.

Other areas examined and details are identified in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

However, six unresolved items were identified during this

inspection.

The six unresolved items, which are discussed in detail in the enclosed

inspection report, concern potential fire induced short circuiting and

subsequent failure of motor-operated valves required for safe shutdown; the

scope of breaker and relay preventive maintenance and testing in safe shutdown

circuitry; assumptions in the high impedance fault study required by Generic Letter 86-10; selection and application of the mally actuated fire suppression

heads; derating of emergency ligh.ing batteries in areas of elevated ambient

temperatures; and the design adequacy of a water curtain intended to satisfy

separation criteria.

The unresolved items are further discussed in the

Executive Summary of the attached report.

Further, it was found that the reactor coolant pump lube oil collection system

had neither tank level monitoring instrumentation nor administrative controls

07008s

/4, ,

I

9301070369 930105

J

PDR

ADOCK 0500044S

D

G

PDR

___-

_

- _ _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ _ _ .

_

'

i

.

IV Electric

-2-

to periodically measure and dispose of any lube oil leakage.

It is our

understanding that during the exit meeting on November 20, 1992,

Mr. R. D. Walker, Manager of Regulatory Affairs for the Nuclear Engineering

Organization, connitted to have administrative controls for both units in

place prior to Unit 2 fuel load.

in a followup discussion on December 15,

1992, Mr. Walker indicated that the Unit I tanks had been sounded and drained

during the week of December 6, 1992,

if your understanding of the commitment

differs from ours, please contact me immediately.

There were also six additional items which will require inspection followup.

These are further discussed in the Executive Summary of the enclosed report.

One of these items involved numerous deficiencies found in an approved Unit 2

abnormal operating procedure.

The extent of the identified deficiencies led

to a more generic concern with your validation efforts for Unit 2 procedures.

Accordingly, a separate prelicensing inspection regarding this issue is

planned.

in accordance with 10 CfR Part 2.790 of the llRC's " Rules of Practice," a copy

of this letter and its enclosure will be placed in the NRC Public Document

Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

/

}N 'Q ,-

A%

/

-

1.

A. Bill Beaci,

trec 6

Division of I actor

ojects

[

Enclosure:

Appendix - NRC Inspection Report

50-445/92-49

50-446/92-49 w/ attachment

cc w/ enclosure:

TV Electric

ATIN:

Roger D. Walker, Manager of

Regulatory Affairs for Nuclear

Engineering Organization

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

l

j

,

.

e

.

1U Electric

-3-

Juanita Ellis

President - CASL

1426 South Polk Street

Dallas, Texas 75224

GOS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

_

TV Electric

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

Jorden, Schulte, and Bt.rchette

ATTN: William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

1025 1homas Jefferson St., N.W.

Washington, D.C.

20007

Newman & iloltzinger, P.C.

A1TH:

Jack R. Newman, Esq.

1615 L. Street, N.W.

Suite 1000

Washington, D.C.

20036

_

Texas Department of Licensing & Regulation

-

ATIN:

G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

P.O. Box 12157, Capitol Station

.

Austin, Texas 78711

lionorable Dale McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

Owen L. Thero, President

Quality Technology Company

Lakeview Mobile liome Park, Lot 35

4793 E. Loop 820 South

fort Worth, Texas 76119

. . . .

e

'

.*

,

,

TV Electric

-4-

JN1 - 519%

l0cctoDMB'(IE01)

bec distrib. by RIV:

J. L. Milhoan

Resident inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/Alf, MS: MNBB 4503

MIS System

DRSS-flPS

RIV file

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

PE:DRS/ S .

RE:DRS/PI

C:D S

/

PMMadden?Ew'['

RIV:PE:Dk/B

NRR:fBB

HMurphy(5d/e-i

TReis

3 ;,,

A$ingh

GLC stable

!?_/k>/92

f

io /30/92

g hv /92

./V10/92

- cha /92

pl

n

y:bLj<v

),

[

Y "(1

" $t U!DRP

DRP

l 'I'""*"[

C:DRP/B

LAYandelf

PGwynn

- BBeach

. ; /y)/92 *

I / 5'/93

/ /5 /93

l

l

l

'

/-

.

. _ . _

_-_ _ __ ___ ___

_ _ _ _ _ _ _ _ - . _ _ _ _ . _ _ _ _ _ _ . _ . _ . _ - _ . _ _ _ _

-

-.

.

TV Electric

-4-

JAN - 51993

bec to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident inspector (2)

l

DRP

Section Chief (DRP/B)

Lisa Shea, RM/Alf, MS: MNBB 4503

MIS System

DRSS-flPS

RIV file

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

.

L

RIV:PE:DR[/,B/

PE:0RS/ S

RE:DRS/Ph

C:D S

NRR:fBB

PMMadden

1Reis

Asingh

MMurphy(w/

GLC

stable

.

-t7 /k /92 -

,1

y

tL /A /92

j-

q/y,/92

g b g/920,.;

/V W/92

'

bl"

y k u-

.

ll,

l

  1. "

M

C:DRP/B

MNT:DRP

, TfDRP *

\\ '*"""1'*" l

LAYandolf

[JPGwnn

/ ABBE ch

. , / t)/92 "

l/ /93

f / / /93

'3

_

.

-

-

.

_

.

- . .

-

.

.

- - -

.